| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateCandidate's Name
Auburn, WA Street Address
EMAIL AVAILABLEPHONE NUMBER AVAILABLEDetail-oriented general contractor with 10+ years of experience in plumbing, carpentry, and construction management. Proficient in a range of skills including electrical experience, welding, and facilities maintenance. Proven ability to work on various projects and adapt to diverse environments. Work ExperienceGeneral ContractorAll American Chimney and Patio service-Auburn, WAJuly 2013 to June 2024 Performed various construction tasks such as framing, roofing, and concrete work Read and interpreted blueprints and construction plans to ensure accurate execution of project specifications Collaborated with team members to coordinate workflow and meet project deadlines Maintained a clean and safe work environment by adhering to all safety regulations and protocols Assisted in the installation of electrical systems, plumbing fixtures, and HVAC units as part of building construction Executed precise measurements using tape measures, levels, squares, and other tools to ensure accuracy in construction projects Demonstrated expertise in carpentry skills such as framing walls, installing doors/windows, and finishing surfaces with trim work Assembled scaffolding structures according to safety guidelines for elevated construction tasks Laid out foundation forms accurately based on site plans before pouring concrete for building structures Safely operated power tools including saws, drills, nail guns etc. while following proper safety procedures Assisted in the demolition process by removing debris from worksites using wheelbarrows or other equipment Poured concrete into molds or forms ensuring even distribution for solid foundations Mixed mortar or grout according to specified formulas for bricklaying or tile setting applications Erected temporary structures such as barricades or fences around worksites for enhanced safety measures Cleared debris from work areas regularly throughout each shift maintaining cleanliness standards at all times Lifted heavy loads manually or with assistance from equipment ensuring proper lifting techniques were followed at all times Framed walls using lumber planks ensuring structural integrity was maintained throughout the process Dug trenches using shovels or excavation equipment following established guidelines Installed insulation materials to ensure energy efficiency and proper temperature control in buildings Operated power saws or other cutting equipment to cut materials according to project requirements Assisted with the installation of roofing materials such as shingles, tiles, or metal sheets Collaborated with architects, engineers, and contractors to resolve any construction-related issues that arose during projects Maintained accurate records of daily activities including work progress, material usage, and labor hours for reporting purposes Safely operated heavy machinery on construction sites while adhering to all safety regulations and guidelines Performed routine maintenance on tools and equipment ensuring they were in good working condition at all times Laid bricks or stones using mortar ensuring precise alignment and structural stability in masonry projects Assembled prefabricated components such as walls or roof trusses for efficient construction processes Followed established building codes and regulations throughout the construction process Determined appropriate measurements for cutting materials based on project specifications Assisted in the installation of plumbing systems including pipes, fixtures, valves etc Climbed ladders or scaffolding structures safely when required for elevated construction tasks Investigated potential hazards on worksites and promptly reported them to supervisors for resolution Patched cracks or holes in existing structures using appropriate filling compounds Mixed paint colors accurately based on specified formulas before applying coats onto surfaces Hauled materials from storage areas to worksites using wheelbarrows or other transportation methods Welded metal components together following established welding procedures Assembled formwork panels prior to concrete pouring ensuring proper alignment was maintained Aided in the setup of temporary electrical systems during construction projects Tended machines that pumped concrete grout cement sand plaster through spray guns for application EducationHigh school or equivalentAuburn high school - Auburn, WAMay 2008 to June 2010Skills Remodeling Construction Management Drywall Construction Estimating Tile Laying Roofing Plumbing Carpentry Handyman Door Hanging Trim Carpentry Landscape Maintenance Facilities Maintenance Restoration Industry Experience Welding Electrical Experience Mechanical Knowledge Heavy Lifting Concrete Forming Heavy Equipment Operation Stucco |