| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateCandidate's Name
Street Address Pulawski Way 3 FlPittsburgh, PA Street Address
PHONE NUMBER AVAILABLEEMAIL AVAILABLEProleCarpentry, Architectural Woodworking, Design and Construction. Experience:2020 - 2024Candidate's Name Freelance Carpentry - Pittsburgh, PA. Brick masonry. Drywall. Plaster Wall Construction. Painting. Stairs. Landscape work. Roong. Vinyl snap in ooring. Steel Framing. Tiling. October 2019 - December 2019:Tischendorf Contracting - South Hills, Pittsburgh, PA. Kitchens. Bathrooms. Framing. Tiling. Decking. Siding. Sheetrock. Flooring. Windows. Doors. Pocket doors. Molding. Casing. Painting. Paint Spraying. Kitchen and Bathroom Cabinet construction and installation. RoofIng.May 2018 - 2019:Essig - Pittsburgh, PA.Kitchens. Bathrooms. Framing. Tiling. Decking. Siding. Sheetrock. Flooring. Windows. Doors. Pocket doors. Molding. Casing. Painting. Paint Spraying. Kitchen and Bathroom cabinet construction and installation. Roong.September 2017 - April 2018:Subcontracting - Pittsburgh, PA.Nelson Residence: (Southside) Bamboo ooring installation. Skip Roberts Construction: (Friendship) Old framing ceiling leveling. Sheetrock. Flooring.Carlton Realtors: (Southside) New framing condo construction. March 2017 - July 2017:Mid-State Construction - Altoona, PA.March 2017:Williamsport, PA Municipal Building:Repair, Removal and Reinstallation of Aluminum 16' garage door frame trim. March 2017 - June 2017:Johnstown Airport:Metal roong and metal siding removal and replacement. Gutter and vent stack repairs, removal and replacements. Brick and cement block masonry repairs.Paint prep work on exterior walls on masonry, steel doors, existing metal siding and awnings including wheel and brush grinding and power washing. JLG, Skyjack scissor lift operator, Caterpillar forklift operator. March 2017 - May 2017:Hamilton Park - Altoona, PA.Installation of recreational tennis court nets and Industrial Strength Rope Climbing Web. Install framing and pouring of concrete sidewalks. May 2017 - June 2017:Municipal Building - Benner Township, PA.Install stone foundation and rebar for concrete pour preparation. Wall framing. Insulation installation. Drywall installation. June 2016:Cummins Automotive Facility - Altoona, PA.Removal of 10" c-channel framing, insulation blankets and steel wall panels 18'wide x 16' high for preparation installation of 4 new garage door roller gates. Construction of 18'wide x 16' high 10" steel c-channel door framing. New York City:June 2016 - September 2016:Lorenzen Residence - Greenpoint Brooklyn, NY.Vestibule renovation including: removal of door, door casing, jamb, and wall framing. Removal of broken tile, foundation slab and exterior foundation brickwork. Rebuild brick foundation wall.Reinforce foundation framework. Mix and pour 1 ton foundation slab. Rebuild new wall and door jamb.Hang 2 reclaimed/renished doors 30"x100".Install new tile oor.Install 2 stone saddles; interior and exterior.January 2016 - June 2016:TwoSeven - Brooklyn/Manhattan, NY.Manufacture and install storefront window displays for Chanel and Dior. July 2015 - November 2015:RCP Builders - Greenpoint, Brooklyn, NY.Lowlife (Lower East Side Restaurant):Front door, door jamb, and side light fabrication and installation. Door casing. Lock set installation.Table top fabrication.Cabinet construction and installation of 6 cabinet units. 53 Paper (Tribecca Ofce):Fabricate and install: 12 walnut computer work stations 5'x5'x4' and 3 slat walls 8'x8'. Cozinha Latin (Greenpoint Restaurant):Laminate ceiling, pillars, and duct work with 1"x6" oak boards and oak molding. Door installation and casing.Bar Top and Bar Rail re-laminating.Lorenzo's (Bushwick, Brooklyn):Fabrication and construction of back bar cabinet unit. September 2015:Crate Shop - Long Island City, Queens, NY.Construct 5 identical rolling tool carts with angled shelves and drawers for work truck storage.January 2015 -April 2015:Composite Fabrication and Construction Co. - West 4th Street, NY. Baseboard, door and window casing, crown molding and door jamb installation. Front entrance doorway fabrication and construction. July 2014 - December 2014:Lorenzen Residence - Greenpoint, Brooklyn, NY.Reclaimed Main entrance door, Side entrance door and Back entrance door: Renish stripping, molding rebuilding and reshaping. Layout, construction, and installation of door jambs with transom openings. Installation of doors, transom windows, door stops, exterior casing, handle and lock sets.2013:Onderdonk and Sons Bar - Ridgewood, Queens, NY.Complete renovation from former restaurant to present bar. Demolition of old ooring to expose original sub-oor for asthetic look. Construction of new walls, wainscoting panels, tile ooring, tin ceilings, and raised ooring for banquettes.Construct and install back bar liquor shelf and cabinetry. Install restaurant/kitchen doors, antique drawer pulls and latches, door closers and other hardware.2012:Architectural Woodworking- Brooklyn, NY.Cabinet making. Drawers. Doors. Shelving. Paint and Polyurethane spraying. 2011-2012:Elizabeth Stevens & Co.- New York, NY.Art Handling and Crate Making.Construct shipping crates for New York ne art and antique handler. 2011:Calyse Residence- New York, NY.Construct and install a melamine upper wardrobe cabinet with sliding doors. 84 W x 16D x 32 H.2011:MiN NY- New York, NY.Construct, HVLP paint spray and install 4 curved custom shelving for back showroom. Construct, stain, HVLP polyurethane spray and install an oak curved shelf unit with a sliding drawer/shelf 52W x 24D x 6H.2011:DeRosa Residence-Brooklyn, NY.New Steel Door Installation.Move old original wooden doors from stone wall basement foundation. Cut length and install 2 new steel security doors and cement into stone wall openings 2011:DeRosa Residence - Brooklyn, NY.Remodel Bathroom.Scrape all chipped plaster and paint from walls and ceiling. Clean up and scrape all grout and paint from tiles. Apply plaster-weld ro walls and ceiling.Skimcoat all walls and ceiling with new plaster.Prime and paint all walls and ceiling.Strip old paint from skylight window sash and glass. Reinstall glass. Prime and paint. Reinstall skylight window sash. 2010:Lorenzen Residence- Brooklyn, NY.Design,construct, paint and install 2 mirror image built-in bookshelf wall units with drawers, molding and antique hardware. 48W x 14D x 103H. 2010:Harrell Residence- New York, NY.Construct and install a home entertainment built-in wall unit. 36W x 14D x 80H. Install and connect all audio and video equipment. 2010:Freemans Restaurant- New York, NY.Restaurant Renovation.Install wall panels and molding throughout 5 rooms. Construct soft boxes throughout ceiling of 5 rooms. Construct and install new door jambs throughout 8 openings throughout second oor. Cut and install 8 old reclaimed doors into new openings. Install 20, of crown molding around 3 existing wall cabinets. Fabricate and install French doors at stairwell storage area. Install an old reclaimed handrail 12L along stairwell to second oor. Construct and install 24 of book shelving from reclaimed rough-cut lumber. Fabricate and install heating duct vent covers.2010:Peels Restaurant- New York, NY.Restaurant Renovation.Surface plane a large quantity of old reclaimed oak ooring to be used as wainscoting wall covering.Apply resurfaced oak ooring to walls from main entrance up through stairwell to second oor.Fabricate, cut and install oak picture molding throughout stairwell area. Fabricate and install wooden heating duct vent covers. Fabricate and install door face panels for 60 of under-counter refrigerator doors. Construct 50 of banquette seating and 3 - 8 curved banquettes seating. Install cap along all tops of banquettes.Install molding to all banquettes.Install 3 new oak handrails along stairwell to second oor. 2009:MiN NY- New York, NY.Storefront Renovation.Construct 18 lower base cabinets.Construct 10 upper shelf cabinets.Construct 3 upper shelf cabinets with arched facing. Construct and install 18 drawers.Install 56 hinges and 38 cabinet doors.Install 28 of oak dental crown molding to arched shelf cabinets. Install corner bracing on library area cabinets.Install brass Putnam Rolling Ladder system.Fabricate and install swinging door at curved reception desk. Stain and polycoat all cabinetry, architectural woodwork and ooring throughout 3 showrooms of entire storefront.2009:Lot 13- Bayonne, NJ.Apartment Renovation. Demolition and removal of entire second oor interior. Install a new plywood sub oor to entire second oor, with leveling of back half of oor. Level all joists throughout entire ceiling. Rebuild all framing for skylight. Install new ledger boards and install 10 25 TGI beams. Install 2 7 sets of new windows in front of second oor. Install 3 30 new windows in back of second oor. Lay out entire oor plan from blueprints onto new sub oor. Install all wall framing throughout entire second oor. Install soundproof boards along entire interior wall of adjacent building. Install berglass insulation battens throughout entire second oor framing. 2009:Beranbaum/Stackhouse Residence- New York, NY. Scrape all chipped paint from baseboard doors in window molding throughout entire apartment. Remove damaged plaster from living room, dining room, 2 foyers, and 2 bedrooms. Apply plaster weld and new skim coat of plaster to all listed areas. Sand, prime and paint all listed areas. Repair bedroom and bathroom door hinges. Repair cabinet door latches and locks.2009:Beranbaum/Coates Residence- Brooklyn, NY. Repair aluminum exterior storm door at main entrance. Repair bent door frame. Construct 32L x 2W x 6H of 2x4 framing and plywood shelves for basement storage room. Remove and repair door slide hinges for home entertainment cabinet doors. Remove and replace 4 x 4 section of drywall in living room ceiling, where second oor bathroom had leaked and caused damage. Tape seams, sand, prime and paint. Remove damaged plaster from entire library ceiling. Gouge out all cracks in original plaster ceiling, which had caused the skim coat to crack and detach from original lead paint. Brush plaster weld into deep cracks, then roll plaster weld over entire ceiling. Apply 3 x 14 strips of berglass mesh over entire ceiling. Apply new plaster skim coat over the entire ceiling. Sand, prime and paint ceiling. Paint all walls, ceiling and molding. Install new molding around entire perimeter of upper walls. Clean out 2 5 x 16 attic wall closets. Apply plastic sheeting to wall framing and rafters inside closets for a clean storage space. Consolidate and organize art studio. Cut and install 6 4 x 6 homesote panels on the walls for pin-up artwork stations. 2009:Wolfe Residence- New York, NY. Remove nails and screws from walls and molding. Sand all walls throughout the apartment. Joint taping and plaster work along kitchen closets and pantry. Patch all nail holes, plaster cracks and unnished molding gaps. 2009 CFL- Queens, NY Construct, polycoat and install 16L x 14W x 28H maple and mahogany wall cabinet shelving.2009 The Crate Shop- Queens, NYCrate Making. Construct shipping crates for art and antique handler. 2009 Tiberias Construction- 2009 Tiberias Construction- New York, NY Remove 20 3 x 8 windows from 2 historical Brooklyn Heights buildings. Recondition and preparation of window frame, jamb, and sill. Install 20 new aluminum windows.2009 Cats Eye Graphics- Queens, NY Operate 8 color automatic screenprinting press. Screen preparation.2008/2009 Ray Romano Construction- New York, NYStorefront Renovation Construct 10 plywood cabinets and shelves. Paint and stain all cabinets and shelves.2008 Ray Romano Residence- New York, NY Scrape and sand paint off of damaged baseboard throughout the entire apartment exposing seams to be addressed. Apply Bondo to patch seams. Prime and paint. Apply caulking to baseboard and molding gaps. Scribe bathroom door. Remove and cut to t water-damaged door jamb. Repair all damaged sheetrock and install new molding. 2007 Ray Romano Construction- New York, NYRestaurant/Bar Renovation Remove 2 3 x 6 windows and rotted framing. Rebuild window opening, framing and casing. Install 2 new aluminum windows. Insulate around windows. Install new casing. Install plywood panels, cabinets, and banquettes. Construct 3 bathrooms: including sub oor, framing and sheetrock walls. Install 3 doors. Build and install custom double door for bar ofce.. 2007 Renotal Construction- New York, NYPenthouse Renovation Dig out gravel throughout 2500 sq. ft. oor in 8 x 24 sections, exposing concrete oor foundation and steel I-beams. Construct 2 x 4 x 24 plywood beams. Install plywood beams to steel I-beams at 16 centers and 4-1 laser level line by using 22 cal. Nail gun and L brackets. Install cross bracing at 24 centers. Install cement under plywood beam at L bracket attachment point. Fill 8 x 24 section back in with gravel. Continue throughout 2500 sq. ft. oor. Install 4 x 4 plywood sub-oor to plywood beams throughout the oor. Construct walls and ceilings and softs throughout the oor using steel framing construction. Install plywood to all wall sections where cabinetry will be installed. Using a laser level, apply lighting installation points to ceiling, sheetrock and oor. Install sheetrock to all walls and ceiling.2009. Beranbaum/Stackhouse Residence- New York, NY. Apartment Renovation :Molding Repair, Plaster Skimcoat & Interior Painting. Remove damaged skimcoat from living room, dining room, foyer and two bedrooms.Apply plaster weld and new skimcoat of plaster.Sand, prime and paint the entire apartment.Repair bedroom and bathroom door hinges.Repair cabinet door latches and locks..2009 Home Renovation: Beranbaum/Coates Residence- Brooklyn, NY. Framing, Plaster Skimcoat, Interior Painting & Wall Panels. Repair aluminum exterior storm door at main entrance. Adjust bent door frame. Construct 2 x 6 x 32 L of 2 x 4 framing and plywood shelves for basement storage room.Remove and repair door slide hinges for home entertainment cabinet doors. Remove and replace 4 x 4 section of drywall in living room ceiling where second-oor bathroom had leaked and caused damage. Tape seams, sand, prime and paint.Remove entire damaged skimcoat from library ceiling. Gouge out all cracks in original plaster ceiling, which had caused the skimcoat to crack and detach from the original lead paint.Brush plaster weld into deep cracks, then roll plaster weld over the entire ceiling. Apply 3 x 14 strips of berglass mesh over the entire ceiling. Apply new plaster skimcoat over the entire ceiling. Sand, prime and paint ceiling. Paint all walls and molding.Install picture molding around entire perimeter of the upper walls. Clean out 2- 5 x 16 attic wall closets.Apply plastic sheeting to wall framing and rafters inside the closets for a clean storage space.Consolidate and organize art studio.Cut and install 6- 4 x 6 homesote panels on the walls for pin-up artwork stations. 2009 Apartment Renovation: Plaster Patching.Wolfe Residence- New York, NY.Remove nails and screws from walls and molding. Quickly sand all walls throughout apartment.Joint taping and plaster work along kitchen closets and pantry. Patch all nail holes, plaster cracks, and unnished molding gaps. 2009 Cabinet Making & Installation. CFL- Queens, NY. Fabricate and construct 3 cabinets 28 high x 16 total length maple/mahogany wall cabinet and shelving.Apply clear water-based poly-coat nish.Installation.2009 Art & Antique Crating:Crate Shop- Queens, NY.Construct shipping crates for art and antique handler. 2009 Brownstone Renovation: Gutting and Installing Windows & Molding. Tiberias Construction- New York, NY.Remove 20 3 x 8 windows from two historical Brooklyn Heights buildings. Recondition and preparation of window frame, jam, and sill. Remove and repair molding.2009 Screen Printing:Cats Eye Graphics- Queens, NY.Operate 8-color automatic screenprinting presses.Screen preparation.2008/2009 Storefront Renovation: Cabinet Making & Installation. Ray Romano Construction- New York, NY.Construct 10 plywood cabinets and shelves.Paint and stain all cabinets and shelves.2008 Ray Romano Residence: Molding Repair & Sheetrock. Ray Romano Construction- New York, NY.Scrape and sand paint off of damaged baseboard throughout the apartment exposing seams to be addressed.Apply Bondo to patch seams. Prime and paint.Apply caulking to baseboard and molding gaps.Scribe bathroom door. Remove and cut-to-t water-damaged door jamb. Repair all damaged sheetrock and install new molding. 2007 Restaurant/Bar Renovation Ray Romano Construction- New York, NY. Remove 2- 3 x 6 windows and rotted framing.Rebuild window opening framing and casing. Install 2 new aluminum windows. Insulate around windows. Install new casing.Install plywood panels, cabinets, and banquets.Construct 3 bathrooms, including suboor, framing, and sheetrock walls. Install 3 doors.Build and install custom door for bar/ofce.2007 Penthouse Renovation: Foundation, Framing & Sheetrock. Renotal Construction- New York, NY.Dig out gravel throughout 2500 sq. ft. oor in 8'x24' sections. Exposing concrete oor foundation and steel I-beams.Construct 2"x4 1/2"x24' plywood beams. Install plywood beams to steel I-beams at 16"centers and 4'-1" laser level line by using 22 cal. nail gun and L brackets. Install cross bracing at 24" centers. Install cement under plywood beam at L bracket attachment point. Fill 8'x24' section back in with gravel. Continue throughout 2500 sq. ft. oor. Install 4'x4' plywood sub-oor to plywood beams throughout oor. Construct walls and ceilings and softs throughout oor using steel framing construction.Install 3/4" plywood to all wall sections where cabinetry will be installed. Using a laser level, apply lighting installation points to ceiling and oor. Install sheetrock to all walls and ceiling.2007 Vinyl Siding:Keith Morris Residence Altoona, PA.Cut and install all vertical corner-channel on to garage and extension. Cut and install all horizontal J-channel.Cut and install all horizontal siding around 7 walls of garage and extension. Cut and install all soft under-side facing around garage and extension. 2007 Kitchen Renovation : Gutting, Framing, Sheetrock. Casey Ciavarella Residence- Altoona, PA. PHONE NUMBER AVAILABLE Demolition and gutting of existing kitchen and dining room walls, ceiling and oor. Remove wall dividing kitchen from dining room..Repair oor beam and joists. Plane any high spots on oor beam and joists to level.Install a 1x10x16 plank over oor beam.Install tongue and groove sub-ooring.Jack plane and power plane all ceiling joists of both rooms to level. Construct a 4x10x16 header. Replacing wall between kitchen and dining room; install header tight to ceiling joists with 4x4 posts supporting it. Apply wire lathe to chimney using tap-con screws. Apply cement to chimney face. Frame out around chimney.Pad out any low spots and plane any high spots of all wall studs. Insulate ceiling and all walls.Sheetrock, tape and skim coat plaster ceiling and all walls. 2006 Cabinet Making: Construction & Installation.Keystone Casework Inc. Bellwood, Pa. Rug Weibley: PHONE NUMBER AVAILABLE Construct and assemble melamine cabinets for national corporate chain stores such asAnnie Anns Pretzels and Portrait Innovations Photo Labs. After assembly, cabinets were laminated with plastic laminate, trim routed and led.Cabinets were then packed and then loaded on to the shipping truck. Keeping a drivers logbook, I then drove them to their destination (such as Indianapolis, IN), installed cabinets to grand opening standards and then drove the truck back to the Keystone Casework shop.2006 Remodeling : Paneling & Molding.Janice Miller Residence Altoona, PA. PHONE NUMBER AVAILABLE Install pre-nished white masonite panels over damaged ceiling tiles throughout 12 x 12 living room, hallway, foyer, stairway, and second oor hallway. Use paint sprayer to apply primer and then enamel paint to 1/4x 3/4 pine strips. Install pine strips over all seams throughout all points of ceiling. Cut, scribe and install decorative paneling throughout kitchen and dining room walls.Install crown molding along kitchen ceiling.Replace drop-ceiling panels in dining room.2006 Exterior Painting:Jeannie McGinley Residence Altoona, PA. PHONE NUMBER AVAILABLE Power wash and scrape all exterior walls of 16 x 16 garage. Apply a coat of primer to all chipped paint / exposed wood of walls, underside of roof and garage door.Apply tan coat of exterior latex to all 4 walls. Apply white coat of exterior latex to all trim.2006 Roong:John Ciavarella Residence Altoona, PA. PHONE NUMBER AVAILABLE Remove steel sheeting from lower roof above porch / living room. Remove and replace all damaged 7/8 plank boards.Remove and replace 2 damaged windowsills.Apply ice and water barrier over entire roof and install drip edge. Apply shingles along middle at and both left and right hip. Continue to top. 2006 Bedroom Renovation: Laminate Flooring / Molding: Betsy Cardiff Residence Hollidaysburg, PA. PHONE NUMBER AVAILABLE Install laminate ooring in 3 bedrooms, 3 closets, hallway and stair landing. Install baseboard and door molding throughout all 3 rooms and hallway. 2006 Bathroom Renovation: Gutting, Wallboard/Sheetrock, Tiling, Painting & Fixtures:Madeline Ciavarella Residence Altoona, PA. PHONE NUMBER AVAILABLE Gutted master bathroom including tile on all walls and shower area, acrylic tile oor andsub-oor, towel racks, glass shower doors, sink, faucets, xtures and demo cast iron bathtub.Remove severely damaged cement board at shower area. Install insulation board and replace cement board with duro-rock cement board. Install a new bathtub and drain.Repair cracked plaster walls.Install 4 tile throughout 3 walls and ceiling of shower/tub area. Creating a 2 border that ran around shower walls and continued around entire room at window level line. Tile all bathroom walls below 2 border.Remove toilet and install hardibacker cement board to oor. Tile bathroom oor with 12 tile.Grout all tile and apply grout water sealant.Cut holes in oor tile to accept plumbing.Install pedestal sink, faucet and handles.Install bathtub faucet, handles and showerhead.Reinstall toilet.Install 30x 36 mirror.Install wall heater.Paint ceiling and walls with enamel paint.Install oral pendant lights on ceiling above sink/mirror. Install towel racks, shower curtain rod and window curtain rod. 2005/2006 Bathroom Renovation : Gutting, Framing, Wallboard/Sheetrock, Fixtures & Tiling.Casey Ciavarella Residence Altoona, PA. PHONE NUMBER AVAILABLE Gutted master bathroom walls, ceiling and demo cast iron bathtub. Sheetrock ceiling and walls. Joint tape, joint compound and sand seams. Install a new bathtub.Install 4 tile throughout 3 walls of tub/shower area. Install hardi-backer cement board to oor.Install 6 tiles on bathroom oor.Install 24x 36 sink base cabinet and 24x 80 linen cabinet. Install tile baseboard.Install door casing.Install 3 x 3 mirror above sink base cabinet and 3 x 5 mirror on sidewall. 2005 Roong: John Ciavarella Residence Altoona, PA. PHONE NUMBER AVAILABLE Remove 7 layers of old rolled roong material, old cedar shingles and rotted 7/8 planks from upper and lower gable roofs.Repair existing framing by adding cross bracing throughout both roofs at 24 spacing.Rebuild 6 cornice and soft boxes.Cut and install 5/8 sheathing for both roofs. Lower roof creates 2 valleys at adjoining upper roof.Apply ice and water barrier, felt paper and drip edge. Apply shingles to both roofs using a weave pattern at the valleys. Apply ridge caps.Install ashing.2005 Exterior Deck:Betsy Cardiff Residence Hollidaysburg, PA. PHONE NUMBER AVAILABLE Demolition and removal of old deck.Construct a new 6x12 treated wood deck with 2 3x3 sets of stairs and vinyl handrails.2005 Bathroom Renovation: Doors, Sheetrock, Vinyl Flooring & Painting. Julie Dracup Residence Altoona, PA. PHONE NUMBER AVAILABLE Remove old door and jamb. Square in framing. Fabricate new door jamb and install with new door.Square in two walls. Install sheetrock on ceiling and all 4 walls of 8x 8 bathroom. Tape seams and plaster skim coat all walls.Patch cracks in plaster throughout kitchen.Skim coat plywood oor in bathroom with leveling compound. Install vinyl ooring.Install molding and baseboard.Paint ceiling, molding, doors, cabinets and walls of existing kitchen and new bathroom.2005 Kitchen Extension Renovation: Gutting, Framing, Sheetrock & Painting.Casey Ciavarella Residence - Altoona, PA. PHONE NUMBER AVAILABLE Remove wall from kitchen to enclosed back porch / kitchen extension. Install studs and 4x10x10 header to support 2nd oor framing. Sheetrock, tape, skim coat and paint back porch kitchen extension. 2004 Kitchen Renovation: Gutting, Framing, Cabinet Making & Fixtures. Jerry Owens Residence South Orange, NJ.Demolition and removal of existing cabinets, appliances, lighting xtures and tile oor.Frame out an angled ceiling with a center lighting cove running through the 16 length ofkitchen. Frame out pantry walls, refrigerator cove, wall spacers between cabinets and soft between kitchen and breakfast nook.Install hinges, doors, drawer slides, drawers and drawer faces on to cabinets. Install 2 - 1 x18x36 solid maple pantry doors with Rixon pivot hinges into butcherblock counter on lower cabinet.Fabricate new door jamb and install a new solid raised panel door at entrance of garage.Install new locks on two entrance doors.Install crown molding, solid maple wall trim, window and door casing. Fabricate a custom oak saddle and install pivot hinge for dining room door. Fabricate and install wooden heating vent cover frames. Install wine racks and 18x24x72 Hafe sliding pantry basket rack. 2004 Master Bedroom Renovation: Gutting, Masonry, Framing, Sheetrock& Doors.Steve / Lynn Eckenrode Residence Pittsburgh, PA. PHONE NUMBER AVAILABLE Demolition of water damaged plaster and mortar. Removal of loose bricks. 4- 8x16 walls.Rebuild 2 sections of brick wall 3x5. 2 rows deep. Drill brick and add 1500 masonry (Tap-con) screws attaching wire lathe to the brick walls for reinforcement. Apply to 1 mortar to wire lathe on all 3 walls. Reply the oor with 1/2' plywood at one side of room and 1/8, , and plywood at the other side raising the oor 4 to level the oor. Frame out and insulate 3 walls.Build doorjamb and plywood / stud header beam for French door installation. Add plywood to wall in the middle of the oor because the heating contractor cut the main support beam for the third oor causing the second and third oor to drop. Frame out 2 closets with 1x6 pine. Allowing each closet to be built with angles so that the French doors are parallel to the closet walls when open. Sheetrock entire room and closets. Joint tape and plaster all seams and gaps. Install pine around windows inside of wall framing to extend window opening to face of sheetrock.Install French doors. Install closet doors. Install door handles Install pine ledger for clothes hanger pole.2003 Bedroom/ Ofce Renovation: Gutting, Sheetrock & Painting. Casey Ciavarella Residence Altoona, PA. PHONE NUMBER AVAILABLE Gut walls and ceiling of two bedrooms 10x12. Insulate existing framing. Sheetrock, tape, plaster prime and paint both rooms. 2003 Architectural Woodworking / Cabinet Making:South Side Design Brooklyn, NY. Lucas and Sam: PHONE NUMBER AVAILABLE Papillion Restaurant / Bar:Construct a 24 bar, architectural walls and architectural ceiling lighting. Construct 2 - 8 U-channel plywood arches coming up from the countertop of the back bar and continuing up about 10 and arching up and around until left and right meet in the center creating a silhouette of a buttery shape in the ceiling above. 1x6 pine framing was installed throughout for colored lighting panels to be installed.The plywood arches were then laminated with cherry plywood and then capped off with mahogany molding.Wine racks were made in a similar manner for the arches on the back bar. South Brooklyn Residence:Construct and install maple plywood cabinets for the kitchen, bedroom and home photo studio.2002 Live / Work Renovation: Gutting, Framing, Roong & Welding. Autoletric Milton, NY. Brett / Veronica Khaler: PHONE NUMBER AVAILABLE Demolition / gutting of 2/3 of a 30,000 sq. ft. barn. Framing of 20 high walls and roof framing. Roong plywood sheeting and 3 layers of insulation board, felt paper and 5x25 corrugated steel panels 40 wide installed.2 large double doors 8 thick x 6 wide x 10 tall. Constructed with 4x4 posts, wall framing, insulation, treated plywood and pine style and rail facing. Installed industrial hinges on to doors and welded hinged on to newly constructed steel door framing.Install framing and foam insulation with Tap-con screws and Ramset nailer along 20x75 wall.2003 Penthouse Renovation: Pocket doors, Hinges & Locks. Martin Meyers Construction New York, NY. Martin Meyers: PHONE NUMBER AVAILABLEKeanu Reeves Residence- New York:Construct and install pocket doors and pivoting walls. Install Rixon hinges and lock sets.Install stainless L-prole around walls and doorways. 2002 Kitchen Extension Renovation: Gutting, Foundation, Framing, Windows, Sliding |