| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateCandidate's Name
MEP/HVAC Project ManagerStreet Address , USA(e) EMAIL AVAILABLE (h) PHONE NUMBER AVAILABLE (m) PHONE NUMBER AVAILABLEPROFESSIONAL SUMMARY.-Recent Project Commissioning Coordinator (Contractor Side) and Mechanical Quality Assurance (QA) Engineering Inspector support for the construction of a new American Embassy Compound (NEC) for the U.S. Department of State (DOS) within the Overseas Building Operations (OBO) Construction Division.-Numerous facility projects working with Federal Contractors as the mechanical systems design and construction engineer supporting the construction of various government facilities both OCONUS (overseas) and CONUS (stateside) locations supporting the U.S. Military and the Army Corps of Engineers (COE)-Mechanical Electrical Plumbing (MEP), Managing design-build contractors on international commercial Iconic Government High Rise construction projects located in the United Arab Emirates (UAE)ORGANIZATION HISTORYENGINEERING/ CONTRACTOR HISTORYTECHNICAL SKILLSDepartment of State and Overseas Bureau of Operations (OBO) Q.A, Mechanical Inspector and Engineering Technical Support to the Project Director ~ (1 yrs.)Project Design Engineer: Owners Estimate, Specifications, Dwgs, Submittal, Change-orders disposition & Technical negotiations ~ (10 yrs.)AutoCAD 2D; Bentley 2D Microstation; Advanced Level; Trimble SketchUp 3D (Mid-Level) ~USAF Base Civil Engineering and US Army Garrison Command Technical Engineering Support ~ (15 yrs.)Construction Support Engineer: Construction Schedule, QA Contractor Oversight, Commissioning Support: Pre-functional Testing, Start-up, TAB, O&M Data ~ (6 yrs.)Calculation Software: Carrier HAP, E-20; Trane Load Calcs.; Valve CV, Fire Protection Systems Design, Hydraulic Sprinkler, and Main Networks; custom HVAC MS Excel spreadsheets (advanced level).US Army Corps of Engineers (COE) Mechanical Engineering Support, Progen Software Estimate ~ (5 yrs.)Engineering Operations and Maintenance; functions Government Buildings and Hospitals ~ (3 yrs.)Microsoft Office 2010 Suite and Microsoft Project scheduling software packages (Advanced Level)Commercial Industry High Rise Towers, Retail: MEP Manager/ DOS QA Support mechanical, inspector ~ (1 yrs.)HVAC Contractor Business Owner & Maintenance Technician ~ (10 yrs.)Control Systems, Sequence of Operations, detailed Sequence of Events, and Color Graphics (Advanced Level)*** TIMELINE - WORK HISTORY SUMMERY BY CATEGORY AND ROLES ***RECENTNEAR TERMPAST HISTORYSKILL BUILDINGROOTSProcess and Facility Systems.Air Conditioning, Heating Ventilation Systems, Refrigeration Systems, High Wall Split, Ductwork (High/Mid/Lo Press.), Pkg. DX units Chilled Water Pkg. Units 75-350 Tons, Primary/ Secondary Chilled Water Loops, VFD Pumping Systems, N+1 Fault Tolerant Configurations, PLC Control System Nuclear System Equivalent Control Systems, Smelter and Battery Charging Facility Industrial Ventilation, Clean Room Class 10 through 100 design, High-Value Data Center HVAC systems design and construction projects.PLUMBING AND PIPING: Potable Hot and Cold Water, Waste and Soil-Water Systems; High-Value Water Feature, Fire Protection Systems, Chilled Water Pumping, and Fuel Pipeline Systems, Including HDPE (Butt and Fused Welded), PVC, Concrete Cast Iron, DI, Cooper, and ASTM A-53 and ASTM- 105.FIRE PROTECTION: Wet Pipe, Dry Pipe, Deluge, Clean Agent, Foam, Mist Systems and Fire Pumps Pkg.SITE UTILITIES: Storm Water Drainage, Fire Mains, Central Chilled Water (District Cooling), Site Grey Water Drainage, Vacuum Sewage System, Fuel Storage, and Cross-country Fuel Line.INSTRUMENTATION AND CONTROLS: P&ID Loop Diagrams, Flow, and Control Diagrams Distributed Color Graphic Control Systems: AS-I segments, BAS, PLC, DDC, Single Loop, Hard Wired, & Fault Tolerant N+1 Systems.Project Building Types and Related Functions.BUILDINGS AND MEP PROJECTS: Commercial Construction: High Rise (50+ Story), Mixed Use Retail, Modular Buildings, CMU; Pre-engineered Bldg. (PEB); Expeditionary military construction per the following: Single Office, Large Administration buildings, Latrine, modular constructed Billet living areas, Fuel Lab, Battery Charging facility, Government Aircraft Hangars/ Back Shops, Comm./IT Server command headquarters, lift stations, base fire central systems, base dining, and control, Skiff facilities. Also, Aerospace: Launch Control Block House, & Mobile Service Tower Satellite, Payload Processing Class 100 Clean Rooms), Aerospace fault tolerant N+1 central chilled water plant, Navy HEMP Shelter Facilities.ROLES: (Quality Assurance Inspector, Technical, Instructor, Engineer, Management, Superintendent),MECHANIC/ TECHNICAL: Air Conditioning and Refrigeration Contractor, HVAC Superintendent, Technician, and Mechanic,INSTRUCTOR: Vocational and Technical Instructor (High School and College level HVAC Technology),ENGINEER: Government Facility Systems Maintenance, Aerospace Facility Mechanical and SCADA Control Systems Design, Procurement, Construction Work Packages, Fire Protection Systems, Mechanical Project Engineer, Startup/Commissioning,GENERAL ENGINEERING SUPPORT: As WORK PACKAGE WPE Engineer (Mech. Elect. Civil, I&C, Fire, Piping/Plumbing Systems Design / Green Field and Brown Field/ Maintenance & Repair / Retrograde / Proposals, Including Mechanical, Electrical, Civil, and I&C Projects and Process Systems.ENGINEERING MANAGEMENT: Project Control Analyst; Mechanical Construction Manager (ME Construction Support Manager); Engineering Site Manager; High Rise Complex Project Mechanical Electrical and Plumbing (MEP) Manager; Air Conditioning Service Manager; Owner Contractor,EDUCATION.Bachelor of Science (B.S.) - Electrical, Air Conditioning, and Air Conditioning and Refrigeration Science and Technology, 1984, Central Missouri State University, Warrensburg, Mo., USASECURITY CLEARANCE.Recent NATO Secrete, DOS Interim Top Secret (T.S ), and DOD Secret Last held, (10/05/2016)MILITARY SERVICE.The United States Air Force, Air Conditioning and Refrigeration E-5, Technician, Five (5) yearsAs an Air conditioning and refrigeration journeyman level technician (E 5), worked on HVAC equipment up to large centrifugal chillers, related controls and support mechanical systems. I completed my military service as a Vietnam Era Veteran with an Honorable Discharge of my duties.RECENT AND NEAR TERM - WORK EXPERIENCE.(1)E&I and Clean Energy AMEASE, Amec Foster Wheeler (Amecfw E&I) 10/1/2016 12/04/2016Senior 1 Construction Manager,Federal Contractor is working directly for US Army Corp of Engineers (USACE), Poland MDA Resident Office, European Phased Adaptive Approach (EPAA), Phase III Construction Contract, Aegis Ashore, Redzikowo Poland per the following:As Senior 1, Construction Manager hired initially to manage the Construction for a critical, time-sensitive utility support area:As the Construction Manager, responsible for the building of the sites Water Supply Building (WSB) and its MEP systems fitout. My initial task was to bring the buildings construction phase back on schedule. Later, to construct the MEP, two major systems (firewater and potable water treatment) supply to the sites water fire loops and water supply, which well behind the project schedule, back on schedule.Note: My job was cut short due to issues obtaining a Polish visa.(2)Caddell Construction 8/3/2016 - 9/30/2016Project Commissioning Coordinator International, (Temporary Consultant Role)Federal Contractor working directly for U.S. Department of State, DOS, Offices of Overseas Operations, OBO, Construction and Commissioning Division, US Embassy Project (NEC) located in N per the following:Hired to work as a consultant to streamline the projects commissioning operations, I currently work in direct support to main U.S. Contractor for the Project Superintendent on a Department of State (DOS) Overseas Bureau of Operations (OBO) New US Embassy Construction Project (NEC), located in Nouakchott, Mauritania per the following:Contractor's project "Commissioning Coordinator" trouble shooter responsible for the streamlining of the existing failed and severely behind schedule commissioning activities strategy/plan, review, and approvals of the commissioned items by the government,Provided a conforming, maintainable commissioning program utilizing Primavera Project Planner P6" (instead of MS Excel manual, existing static schedule) with a "Hands On" trouble-shooter approach to conform to the Head Office expectations,Approve of all related company parties worked procedures and instruct the various parties in the program engineers agreed upon government commissioning submittal process associated with the commissioning activities related to required Pre-functional checks (PFC) and Function Performance Testing (FPT) start-up documentation for a coordinated approach to meet the Project Directors approval,Assist the various MEP Equipment and related systems factory instructors in the delivery of their training agendas packages, classroom, and site sessions to provide training to the embassy staff operations and maintainers personnel that will meet the approval of the DOS, PD.Period of unemployment looking for the right opportunity 9/1/2015 8/3/2016Based in the Malkerns Valley, (Kingdom of Swaziland, Africa)(3)STG, Inc. 6/15/2014 - 8/31//2015(4)Regional Mechanical Systems Engineering QA Inspector International, (Contract Position)Federal Contractor working directly for U.S. Department of State, DOS, Offices of Overseas Operations, OBO, Construction and Commissioning Division, US Embassy Project (NEC) located in Swaziland per the following:I provided technical Quality Assurance (Q.A.) support directly to the Project Director (P.D.) for the mechanical systems associated with the New US Embassy Construction Project (NEC), located in Swaziland NEC per the following:Provide all the Mechanical Quality Assurance inspections, witnessed testing and created non-conforming punch lists, Review of the contractor MEP submittals from both an engineering and inspector perspective,Responded to Contractor Requests for Information (RFI) for questions related to mechanical systems,Evaluates proposed submittal substitutions with and made recommendations to the OBO Project Director (PD),Generated Independent Government Estimates (IGEs), for mechanical modifications and change orders,Reviewed and evaluated submittal shop drawings and data sheets from an engineering perspective,Prepared weekly construction reports summarizing project status, with emphasis on mechanical areas,Other technical assignments, as requested by the Project Director (PD).Achievements:Provided detailed redesign of the Carpenter Shops dust collection system, generating coordinated drawings for the Contractor's use instead of going forward with his general standard design, which was deemed not workable by the Facility Manager (FM). The Contractor agreed to utilize our design, preventing a significant High Dollar Value re-design by him that would have resulted in a costly engineering change- order to the Government,Provided on short notice an engineering survey of nearly fifty (50) percent of Two-hundred (200) VAV boxes detailing their non-conforming installation. My technical study prevented them from requiring correction late in the project after discovery by the Washington inspectors, causing a possible delay in the beneficial occupancy of the building,Worked with the Contractors shop drawings submittal to convert their native AutoCAD drawings files into coordination drawings for ease of checking by our engineer team, which was not a standard OBO usual practice. I Later organized and printed them into coordinated A3 plans for others in our team to use for their technical reference and job walk-downs,Provided detailed technical Submittal package reviews (of all disciplines, not just mechanical ones) to ensure conformance to both the Contract specifications and drawings. Typically, only these studies are performed by registered Professional Engineers (P.E.). My reviews and an extra pair of eyes in General are provided, including Operation, Constructability, Maintainability, and general coordination analysis.Period of unemployment looking for the right opportunity 04/2013 06/2014Based in the United Arab Emirates (Abu Dhabi and Fujairah)(5)General Dynamics Information Technology (GDIT) Fairfax, VA. USA 05/2012 04/2013(Based) Camp Leatherneck, Afghanistan - within the Home Land Security DivisionMechanical (Project Engineer) International (Contract Position)Working as subject matter expert (SME) performed technical studies for the government:Provided designs and construction Statement of Work packages for the Garrison Commanders Office,Provided standard designs and work packages for competitive bid for the base construction/ modification projects,Collaborated with the USAF Contracting Office in the commissioning of a high-dollar value (Thirty-five (35) million USD) for the new base command and control communication facility addressing the Contractors design-build plumbing non-code conforming design,Provided technical plumbing code compliance support to the Air Force Contracting Officer in prime contractor negotiations to correct the both development and construction deficiencies relating to HVAC and Plumbing,Provide in-house network CAD management, coordination, and training for our group,As lead engineer for government estimates for our group providing support to the Contracting Officers procurement team via SharePoint intranet.(6)IAP World Services, Panama City FL. USA - (based) Al Dhafra Air Base, UAE 08/2009 05/2012Lead Mechanical Engineer III International (Contract Position)Owners Representative mechanical engineering I work for the US government for supporting the base Civil EngineeringCollaborated and supported the U.S. Army Corps of Engineers (COE) Job Order Contract (JOC) projects,Provided standard designs including fire protection PEB systems, HDPE networks, Fire-mains, design-build aircraft hangar(s) renovation involving custom air conditioning systems, ductwork (sheet metal and fabric) design and installation; HDPE chilled water pipe, with fuse welded fittings,Role required shop drawings, specifications, supplier contracting, construction support and supervision of Contractors, and commissioning support of the HVAC projects,Provided network CAD coordination for our group and in-house CAD/ system training.(7)Arabian Construction Co., Abu Dhabi, United Arab Emirates, United Arab Emirates 01/2009 07/2009Senior MEP Manager International, (Contract Position)As Senior Mechanical, Electrical, and Plumbing (MEP) manager, the extension of the Sky and Sun Towers project named the Gate Towers, 3-8 for the client, Sorough I was responsible for leading the mechanical and electrical team of MEP managers:Coordinated expansion, of site office areas, power infrastructure, supporting up to 350 people expanded in preparation for the new project towers construction effort,Worked with the inspectors and Coordinated with them to conform to the local fire codes to gain their approval of both the existing and new offices,As is the case for so many projects during this time, the economic slowdown forced a project scaled back.(8)Oger Abu Dhabi, Design/ Build Construction Co., Abu Dhabi, UAE 01/2008 01/2009MEP Manager, International Contract Position (Contract Position)Mechanical, Electrical, and Plumbing (MEP) Manager for a major project, the Abu Dhabi Financial Center, (ADFC) I was responsible for all the final design and construction of these systems:The project consists of four towers, two car parks, retail area, and state-of-the-art stock exchange business center. Also, the site has an eight million AED water feature. The monetary value of the MEP for this project was (2 Billion AED value),Significant part of my work involved the final review and approval of the Contractors MEP Material and Equipment submittals using Aconex (online document control system software, industry standard),Organized and trained other engineers to build a CAD, 2D Model of the project for coordination of MEP site systems with Sawa Island support infrastructure works,Participating in the selection of the project main MEP Subcontractor I became familiar with Abu Dhabi's leading MEP Subcontractor organizations,Lead in the proposal for an alternate site sewage system utilizing a state of the art vacuum sewage network with central plant. Provided engineering support and project design for needed IT area fault tolerant HVAC chilled water equipment's (N+1) arrangement to meet the owner's minutes design proposal requirements,I became familiar with Abu Dhabi's latest firefighting code requirements for specialty areas using state of the art Mist "Hi Fog," fire protection systems.Responsible the verification process for the project's LDN approvals of ADDC and the projects other site utility interfaces with the island infrastructure from the Abu Dhabi authorities including ADSSC,Became familiar with the latest Abu Dhabi sewage building codes and developed a good working relationship with the approval authority personnel to assure the project design would meet with their approval as planned by others using a single stack combination waste and sewage riser for the towers thereby averting a variation order,Represented the company at the Al SOWA Island weekly meeting with the owner's representative company, JBI, and their infrastructure design firms, Flour, Atkins, and KEO, I developed a good working relationship with my counterparts,Tasked to coordinate our site utility tunnels and underground networks (IE. Sewage, Storm Water, Potable Water, Fire Hydrants, and Chilled Water Systems) redesigning as needed for final coordination with our MEP Subcontractors.(9)Readiness Management Support L.C. (RMS), Al Dhafra Air Base, UAE 07/2001 - 01/2008Mechanical Engineer III / Acting RMS Engineering Manager, International (Contract Position)I was the Owners mechanical engineer for the United States Air Force (USAF) Base Civil Engineering Squadron, and, the support the U.S. Army Corps of Engineers (COE) Job Order Contract (JOC) projects, I provided the standard designs for numerous infrastructure projects located on the base, providing budgetary estimates (using COE Progen software), design drawings, construction support, Startup/Commissioning, and sustainment engineering level work,Lead design reviews and generated DOD procurement packages,Design and Construction Support, Mechanical Engineer for base facilities,oAdmin multi-floor office buildings, barber shop, laundry, base headquarters, post office, latrine, base housing quarters, office areas,oJet Fuel portable fuel systems with a fault- tolerant custom designed and constructed pumping systems using variable drives (VFD) fuel farm & cross-country flexible, pipeline systems,oGeneral building mechanical systems, including wet pipe, clean agent fire suppression systems, sewage networks, fire hydrant networks, pre-engineered, PEB, buildings. Also, HVAC systems for the computer room IT server areas, retail shopping areas, aerospace aircraft hangars and "Back Shops," explosion-proof fuel lab, fire detection central system for monitoring buildings with addressable fire alarm panels using fiber optic hardened networks,I utilized for my drawings AutoCAD 2002-07, specifications with MS Word, and detailed calculations with MS Excel programs. Also, I created project schedules using MS Project software,I managed the groups computer systems, including AutoCAD as P.C. workstation Computer Systems Administrator (CSA) for (6 years) supporting computer workstations AutoCAD, CAD standards, and network organization files. Also, I helped the base I.T. department as the first level of PC software, networking, and hardware support for our remote engineering design group for Six (6) years.Period of unemployment looking for the right opportunity 09/2000 06/2001Titusville FL. USAPAST ENGINEERING - WORK EXPERIENCE.(10)Bechtel, Aiken, SC via Aide, Inc., Greenville, SC 09/1999 - 09/2000Title: I&C Consultant Engineer (Contract Position)I was on assignment at Savanna River Site (SRS) in Aiken, SC.I designed and specified the Low Current instrumentation analog instrument loops, AS-I segments, devices, and solenoid racks design/ procurement drawings and related specifications,I Coordinated drawings with P&ID and electrical control schematics with stakeholders design reviews. Detailed design packages with Microstation SE, MS Word, and Excel programs,As an additional duty, I was the Bentley CAD administrator and CAD trainer for our group of six engineers using Microstation SE.(11)Westinghouse, Laverne, TN via Aerotek, Nashville, TN 06/1999 - 09/1999Air Conditioning Design/Manufacturing Engr. (Contract Position)I led the work effort as a Project Engineer in the Research and Development of a new line of air conditioners for the project "Millennium" - an international project for the Brazilian branch of the company. The design upgrades for both performance and energy efficiencyI discovered and then recommended corrective design solutions for three major design errors to improve the performance of the air conditioning units. Using "MS Microsoft Project" scheduling software,I delivered a schedule that indicated it could compressed by 30 days, which, after implementation, shortened the assembly line process by one month.(12)Bechtel, Aiken, SC via CDI, Columbia, SC. 05/1998 - 05/1999Process/ I&C Consultant Technical Engineer (Contract Position)On assignment at Savanna River Site (SRS) in Aiken, SC.:Performed engineering level work generating work packages, to existing nuclear process systems relating to Mech., I&C, piping, & process engineering disciplines,Work Package Engineer (WPE), completed the Mechanical and Instrumentation and Control (I&C) deliverables,Group leader for project estimating work in I&C and Mechanical areas,Generating piping and instrumentation drawings, P&ID, using Bentley CAD Microstation software,Alternate group supervisor in his absence.(13)Greene Engineers, San Jose, CA. Via National Engineering, Dublin, CA. 02/1998 - 04/1998HVAC Instrumentation and Controls Engineer (Contract Position)Set up company Mech. /HVAC control/ P&ID drawing standards based on Instrumentation Society of America, ISA, and recommendations. Provided instrumentation drawings associated with a Microelectronics FAB Campus Central Plant. Note: The assignment was cut short due to the projects status change to hold.(14)Hansen Lind Meyer (HLM) Engrs., Orlando, FL via Peak Tech. SVC., Philadelphia, PA. 06/1997 - 01/1998MEP Commissioning Consultant Technical Engineer (Contract Position)Provided construction commissioning of HVAC/Mechanical, Electrical, and Plumbing (MEP) engineering turn-over support associated with the Orange County Courthouse Project, Orlando, FL. (dollar value 350 Million) during the final closeout and activation period. I provided last-minute design modifications, performed field inspections for Startup/Commissioning, and resolved issues concerning contractor compliance with the Contract Documents. I detailed my drawings using Microstation 95 CAD software.(15)Raytheon Engrs. & Constructors, Birmingham, AL. NESCO SVC, Overland Park, KS. 01/1997 - 05/1997HVAC Consultant Technical Engineer (Contract Position)I Provided HVAC equipment layout design for a petrochemical project, including air handlers and related ductwork for the Class 10,000 Clean Room, Process exhaust ductwork, and equipment. I detailed my drawings using Bentleys Microstation (5.0) PC CAD software. Also, provided the design of HVAC equipment for the 3D PDS model.(16)Fluor Daniel, Greenville, SC. Via TRS Staffing Solutions, Inc., Greenville, SC 01/1996 - 12/1996HVAC Principal Technical Engineer (Contract Position)Mining & Metals and Biotech Division At Fluor Daniel worked as Lead HVAC engineer responsible for project scope of services and detailed engineering for industrial smelter ventilation systems, ductwork, and industrial HVAC commercial DX systems. Calculations were accomplished using custom spreadsheets along with industry-standard software. I generated P&ID drawings for the utility systems with AutoCAD DOS (R.12) and Microstation 5.0 CAD Software.(17) O Neal Engineering, Greenville, SC via Eastern Design, Greenville, SC 10/1995 - 12/1995Mechanical Consultant Technical Engineer (Contract Position)Performed field-engineering investigations to resolve HVAC problems associated with industrial air washers, ductwork, and chilled water systems. I generated a statement of work to upgrade existing chilled water systems by installing centrifugal chillers totaling up to 1,500 tons capacity using Refrigerant 134a.(18)Lockwood Greene Engrs, Spartanburg, SC via Allied Technical Resources, Charlotte, NC 06/1995 - 10/1995Mechanical Consultant Technical Engineer (Contract Position)While on assignment there I Was the HVAC design engineer for a large Micro-Electronics FAB Facility Complex responsible for the HVAC Control System P&ID drawings, Sequence of Events, Clean Room air handler details, for Ultra Clean Room, Class 1, systems, and HVAC and equipment specifications? I generated my drawings using AutoCAD and R12.(19)EG&G Florida, Inc., Kennedy Space Center, FL via Consultants and Designer, Cape Canaveral, FL 11/1994 - 05/1995Mechanical Technical Engineer (Contract Position)While on assignment there, I performed as the project engineer for energy management driven HVAC retrofit projects for NASA facilities at both the Kennedy Space Center and Cape Canaveral AFS, FL. Included in the jobs were electronic control systems, electrical design drawings, and asbestos material identification. I detailed my drawings using Microstation (5.0) CAD software.(20)Brown and Root Services, Inc., Cape Canaveral, FL 11/1990 - 11/1994Mechanical Resident Technical Engineer, (Direct position)My projects included the CX-36 Launch Control Blockhouse HVAC refurbishment of the chilled water HVAC systems, a fault-tolerant HVAC system, and the PLC and DDC control systems,I designed fire protection systems consisting of a Dry Pipe Double Interlock, Wet Pipe Systems related hydraulic calculation using Elite's "Fire" software,Followed all projects from conceptual design, the budgetary estimate for project funding, detailed design,Coordinated other disciplines during design, provided construction engineering support during final Startup/Commissioning, close-out, and startup,Detailed my drawings using AutoCAD DOS (R.12) software and completed all related calculations.SKILL BUILDING - ENGINEERING EXPERIENCE.(21)Martin Marietta Corporation, Cocoa Beach, FL 10/1985 - 11/1990Project HVAC Construction and Commissioning Technical Engineer, (Direct position)As the project HVAC Construction and installation-commissioning engineer for the Martin Marietta Company at Cape Canaveral:Responsible for the oversight and development for a variety of process HVAC related systems on Complex CX-41. Supporting the Titian IV Launch Vehicle (HVAC systems, Class 100,000 clean room, central chilled water plant/ PLC Control Systems),Generated specifications & supported procurement for chillers, cooling towers, custom air handling equipment, Clean Room A/C systems, and fault-tolerant, PLC electronic process control systems, the high value of HVAC equipment.(22)Pan American World Airways, Patrick AFB, FL 04/1984 - 10/1985Mechanical Maintenance Technical Engineer, (Direct position)As systems/ facilities maintenance engineer for rocket assembly buildings located at Cape Canaveral, FL. had engineering operations and maintenance responsibility for the HVAC and mechanical systems, Class 100K, Clean Room HVAC & related DDC Control Systems.GRASS ROOTS HAND ON - TECHNICAL EXPERIENCE.(23)Pan Am World Services, Cocoa Beach, FL Aug. 1981 - 03/1984Overseas HVAC /Plumbing Superintendent (Direct position)I supervised the local technicians for the HVAC and refrigeration equipment supporting a satellite tracking station on the island of Mahe, Seychelles Is., Indian Ocean.(24)Blue Springs Hospital, Blue Springs, MO., USA Apr. 1981 - Jul. 1981Plant Engineer (Direct position)I provided facility management and maintenance support for the hospitals Chilled Water Plant, Steam Central Plant, and other hospital facility systems shift responsibilities.(25) Blanton's HVAC and Refrigeration Service, Blue Springs, MO Dec. 1980 - Jul. 1981Part-Time Service Contractor, (Owner)Worked as a private Contractor servicing commercial/ residential HVAC and Refrigeration equipment, including supermarkets, restaurants, clubs, and retail shopping centers. |