| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateResume of Candidate's Name Page 1CERTIFICATIONSSKILLS SUMMARY Plumbing Utilities Facilities Maintenance. ExcavationMechanical:Heat Exchanger Piping, ChillWater Lines, HVACCommercial Piping, Plate HeatExchanger, ThreadedSprinkler Pipe, Ductwork, DayTank & Tanker Heat CoilSteam Lines, Dust ControlSystems,Candidate's Name
Concrete/Rebar RFI/RFQs Safety Orientations Electrical/ConduitElectrical:Conduit Placement,Flexible and Rigid, WirePulling, 3-Phase MotorWiring859-3 Progress Meetings Pile Driving Piping Shoring/Lagging Sub-Contractor Interface Equipment Installs Infra-StructureFabrication:Electrical Cabinets, WoodStoves, Sheet metalskirting, Marine/bargecomponents, Shippingcontainer conversions,Testing:Size Particle, SieveScreen Analysis,Asphalt Mixes,Concrete, SoilProctors, ASTMHeavy equipment re-builds Procedures,Hi-lift truck body assembly Coal-Oil-WaterVehicle/Trailer Mixturescomponents . James D. Patton Vocational School Two Year Welding Certificate, Crestview Hills, KY Hobart School of Welding Comprehensive Blueprint Reading Course, Cincinnati, OH Certified 6G Pipe Schedule 40 QC Labs, Hollywood, FL Asphalt Testing Level One Flexible Pavements, Columbus OH CDL Haz-Mat Forklift Safety Training, Napier Truck Driver Training, West Chester, OH OSHA 40 HR Safety Certificate PBCS, Cincinnati OH CPR Training, Good Samaritan Hospital, Cincinnati, OH EDUCATIONNorthern Kentucky University, Highland Heights, KY Technical Graphics Communications Music Metallurgy Public Speaking (speech)Morehead State University, Morehead, KY Mechanized Welding Systems (Classroom & in-plant education) James D. Patton Vocational School, Fort Mitchell, Kentucky Two Year Welding Program Blueprint Reading Machining Skills Sheet Metal Oxy-Fuel Cutting Flux-Core GMAW GTAW SMAWResume of Candidate's Name Page 2Vocational Co-op Experience:R.C. Durr Farms, Richwood, KY & R.C. Durr Construction, Walton, KY Stick and arc welding (semi-automatic) of Caterpillar parts including, rebuilds of idlers, track-pads Welding custom component parts for equine equipment and farm implements. Assist mechanics in engine rebuildsMetal Craft Inc., Florence, KY2ndyear co-op opportunity Welding/assembly of Omega wood-stove blower inserts, tire-changers and aluminum lighting fixtures. EMPLOYMENTTruck DriverHighway and Skyways, Hebron, Kentucky Feb 2021-Present Pick-up and Delivery of Domestic and International Freight. Straight truck and tractor trailer. Warehouse duties include: stocking and retrieval on manufacturing parts for aerospace manufacturing and chemical dry ingredients.Thaman Rubber, Cincinnati, Ohio August/2014-February/2021 Inside Sales/Truck Driver Produce quotes and recommend products to customers Explanation of technical capabilities of engineered products Assist customers and outside sales reps with orders and request Expedite orders using LTL or delivery by commercial truck Purchasing product for stock and special ordersScott Gross Companies, Cincinnati, Ohio May/2013-May/2014 Inside Sales Sales of Miller, ESAB, Lincoln and Hobart equipment and spare parts Inventory and pricing of consumables and hard goods. Pre-route management of industrial, food-grade and medical gases. Fielding incoming phone calls for orders. Assisting outside salespeople in lead generation and appointments Metro Lift Propane, Walton, Kentucky, USA Jan/2007- Oct/2012 Route Sales/Truck Driver Pre-Route planning/Lead Driver On-site billing and invoicing using handhelds. New customer setup/orientation. Safety Training- CTEP Completion of Haz-Mat certification Training of new drivers and support personnel. Servicing beverage, industrial/manufacturing and printing packaging industries Resume of Candidate's Name Page 3Foster Wheeler Zack, Clinton, New Jersey, USA Oct/2005 - Feb/2006 Contract Welding Inspector Inspection and re-build of Babcock-Wilcox coal-fired boiler. Implemented sketches/drawings for proper weld reporting Procurement Assistance Inspection of plant air, soot-blower, gas-supply, water, chemicals, chemical lines, 1-18 diameter thin wall to heavy wall, steam piping. Coordinated subcontractors for x-ray and post-weld heat treat activities. Maintained input and progressive documentation of hours, logistics and technical data. Practical knowledge of AWS specifications. Pro-active inspection of outer encasement of boiler and economizer tubing, buck stays, wind-ties and recirculation gas/flue duct inspections internal/external and final walk down for release of insulation installment. Worked cooperatively with project management/engineering for punch list activities and for turnover. Documentation and monitored boroscope, nondestructive NDE hydro-testing of boiler wall tubes, header & supply tubes inside wind boxes. Progress tracking & VT inspection of welds for release of x-ray testing, follow-up of re-works activity. Engineering walk-downs with owner representatives. Rumpke Recycling, Cincinnati, Ohio, USA Aug/2003 April/2005 Corporate Maintenance Division, Welding, Millwright, Civil Assisted in the tear-out of HRB bailer floor and rebuild of heavy wall floor for extended production life. Design-build, plant lay-out, fabrication of glass pulverization plant in Dayton, Ohio utilizing new/used equipment to keep construction cost in-line to start-up/production. New Plant construction plant lay-out, design-build of MRF (Material Recycling facility) in Louisville, Kentucky. Retrofit production lines to maximize production by implementing the fabrication of support structure-conveyor lines, rubber belt, steel belt, pneumatic Eddy Current magnet systems, storage bins & weather wind containment of garbage-small debris control. Procurement of used equipment and pre-fabricated structures Concrete work for pier column installs for silo support Fabrication of pre-engineered concrete push walls and installation work Cincinnati MRF (Material Recycling Facility). Extensive experience in start-up, testing and flow adjustment of material flow to processing equipment.Fluor Constructors International Inc., Greenville, South Carolina, USA Nov/2001 Mar/2003 Senior Site Quality Inspector Projects: PSEG Energy Facility Lawrenceburg, IN, Chevron Clean Fuels Project, Pascagoula, MS. Civil & Mechanical inspection of commercial concrete structures for General Electric steam & gas turbines. Anchor bolt placement, pile caps, auger-cast pile inspection. Work authorization upon completion utilizing sign-off evaluation documents. Prepared reports of daily activities and critical issues that arose. Vendor audits and site inspection of pipe pre-fab components. Resume of Candidate's Name Page 4 Administered surveillance & nonconformance reports with pictures for damage repairs. Parsons Brinkerhoff (PB OHIO) Construction Services April/1999 April/2001 Cincinnati, OH, New York, NY, USA (HR Contact) Senior Level Inspector/Quality Assurance Representative Fort Washington Way, I-71/75 reconfiguration program. Performed inspection and oversaw numerous contracts. Oversaw the installation of vandal screens, light fixtures, architectural bridge/steelwork on main trench and platform bridges over FWW. Resolved plan error issues in field by notifying the client, resident engineers and architects, if needed. Heavily involved with road and utility relocation at Artimus Traffic Control Center. Oversaw pump-house including concrete wall construction, piping, layout, electrical, lighting and overall test phases to ensure proper operation. Worked with as-built drawings and schedule claims as it pertained to wall construction, bridge, and overall progress throughout project within the three year construction time line. Monitored demolition activities of pre-existing bridges and structures. Monitored careful excavation of fiber optic and telephone lines for relocation of the Artimus Traffic Center in downtown Cincinnati. Monitored pile driving of auger- cast, H-Pile and concrete encased tube piles for bridge applications. Coaliquid Inc. McDonell Douglas Energy Systems Dec/1982 Feb/1987 St. Louis, MO & Louisville, KY, USA Welder/QC Plant Technician/Field Technician Served as QA Manager for over five years starting in Shelbyville, KY with pre-engineered fabrications for pilot plant construction for Mulberry Florida. Upon completion and start-up, challenges include retrofit tanks, piping and pumps to successfully burn coal oil water mixture (COWM) in dryer kilns to process phosphate fertilizer. Close monitoring and documentation of in-house boiler temperatures to gun Reported how test burn performed and the capacity of saving client fuel costs vs. using bunker c oil. Additional duties included maintenance of plant processing equipment where coal pulverization and size classification equipment were used. Assumed overall responsibilities over the QA Lab (Florida plant) and conducted research and feasibility studies experimenting with coal sludge water, cooking fat coal-water slurry with stabilization additives. Tested raw materials before process, coal, #6 oil, water and tested load shipments utilizing wet bench chemistry (ASTM methods). Extensive travel was involved throughout the five year term for construction, test-burn set-ups and troubleshooting activities. Hands-on help in wiring three phase motors and transformers. Welded in-line steam heat transfer systems leading to Forney combustion guns to atomize fuel properly. |