Quantcast

Electrical Foreman General Manager Resum...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Electrical Foreman General Manager
Target Location US-SC-Myrtle Beach
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes
Click here or scroll down to respond to this candidate
Candidate's Name
Contact Number: PHONE NUMBER AVAILABLEE-mail EMAIL AVAILABLEOBJECTIVES:Seeking a position in the electrical field where I can perform and develop, in all, but not limited to my experiences and qualifications as well as contributing to the success of the company.PERSONAL INFORMATION:Permanent Address:3701 South Ocean Blvd. #207North Myrtle Beach, SC 29582Cell No. PHONE NUMBER AVAILABLEDate of Birth:July 27, 1971Place of Birth:Libis, TalisayCaloocan City, PhilippinesCivil Status:SingleNationality:FilipinoReligion:ChristianEDUCATIONAL BACKGROUND:College :BATAAN NATIONAL SCHOOL OF ARTS&TRADEBachelor of Science in Industrial TechnologyBalanga, BataanHigh School:BATAAN NATIONAL SCHOOL FOR FILIPINOCRAFTSMENOraani,BataanElementary : ORANI NORTH ELEMENTARY SCHOOLOrani, BataanVocational:NATIONAL MANPOWER AND YOUTH COUNCILMethodist Orani, BataaSEMINAR / TRAININGS:ARAMCO K.S.A : Work Permit Receiver/ Safety Procedures BECHTEL : P.P.E Safety Training & Electrical safety RescueEMPLOYMENT EXPERIENCE :December 4, 2023-present Electrician Assembler -install conduit and fabricating cable tray and wiring and cable termination Envirocep31 Aviation Blvd.Georgetown, SC 29440Angel Tilton - general managerEMAIL AVAILABLE Tel. PHONE NUMBER AVAILABLE Ext. 235 June 5, 2023-Dec. 1, 2023 Installer-installing awning and solar shades and shuttersShade and Shutter Expo3147 Fred Nash Blvd.Myrtle Beach, SC 29577Danny Fergus - owner/managerEMAIL AVAILABLE Tel. PHONE NUMBER AVAILABLEMarch 18,2 019-Sept.30/22 ELECTRICAL FOREMANJUNTEE PHILIPPINES INC.G/F UNIT 108 ESJCENTRE BURGOS ST.BRGY.VILLAMONTE BACOLOD CITY6100 NEGROS OCC.PHILIPPINESEstimate material to be used and taking off materials list, Report daily progress.installations of conduit pipe, cable tray.including cable pulling and termination of control cable and Medium voltage cables.Mounting switchgear panel and primary transformer involving allignment and erection of busduct bar from switchgear panel tto transformer.March 5,2018- Aug.10,2018 ElectricianTRUE NORTH MANUFACTURING SERVICESCORPIRATIONWork as a lead man electrical maintenance and estimating materials and taking off materials list plus lay outing and installation of conduit and cable tray for ligting and motors including cable and wire terminations.. August 05,2016 at October 04,2017 - ELECTRICIANTRPLE J SAIPAN,INC.P.O BOX 500487SAIPAN MP 96950Working as a maintenance in Sandy Beach Homes building as well as in the construction site. Lay outing and installing electrical conduit,lighting fixtures,circuit breaker,convenience outlet and termination of cables. Including carpentry and assisting in mason work.February 8, 2014- at Aug.2014 -L/M ELECTRICAL TECHNICIAN RMP-2 PETRONSUNGJUN INTL. PHIL.LAMAO, BATAANInstallation of lighting fixture, cable glanding and termination, mounting instrument transmitter and cable pulling. Perform pre-commissioning including motor solo run test. Report job accomplished and taking off material list.mounting air con window and split type,refill preon and termination of control cable for H.V.A.C December 2012- August 2013- ELECTRICAL TECHNICIANRMP2-PETRONBUMJIN INTL. PHILIPPINESB.O DUALE LIMAYBATAANRepairing welding machines as well as Tig torch welding. Monitoring generator set as well as maintaining of good condition of it and repair. Install surveilance cameras, and repairing grinder machine, drill machine and others. Installing lighting fixture and power supply from generators to power distribution board. Repairing of vevel and cutting machine for pipe. Lay out individual supply for aair conditioning and install split type air conditioning September 02,2012- November 02,2012 - ELECTRICAL TECHNICIAN Kentz Company Papua, New Guinea (PNG)Cable glanding and cable termination, installation of cable trays, pulling cable and panel installations.Layouting cable groundingLayouting Main Grid Cable and Welding and Fabricating support. Cable Glanding and Cable termination pulling cable, Loop checking and Insulation resistance test . -Working as a Leadman.March 13, 2010  September 20, 2010 - CHARGE HAND ELECTRICIAN BECHTEL COMPANYLNG, SOYO ANGOLAAFRICA.Cable glanding and cable termination, installation of cable trays, pulling cable and panel installations.November 20, 2008  May 14, 2009 - ELECTRICIANIMPREGILO LIDCOGENERAL CONTRACTING COMPANYHAY AL ANDALUS, AHMEDTAMIMI ST. P.O. BOX 2243TRIPOLI, LIBYAGeneral maintenance, lay-outing lightning and power circuit. Maintaining the camp safe and properly including the plumbing works, installing air condition indoors and split unit. Lay outing LAN cable for communication and do some carpentry works. July 2007  April 2008 - CHARGEHANDSOHAR ALUMINUM SMELTERPROJECTBECHTEL COMPANY LLCSULTANATE OF OMANCHANRGE HA ELECTRICIANTaking off materials needed and report completed works. Assigned in PRE OPS commissioning in GIS and doing cable termination. Perform and other duties and function as per order from supervisor Alignment of all GIS accessories. Install capacitor Bank, Post insulator, Surge Arrester for Harmonic Filter.May 2006  September 2006 - CHARGEHAND ELECTRICIAN BECHTEL / PFDTENGIZ, KAZAKHSTANOIL REFINERYWorked as acting Foreman in electrical works including cable glanding and cable termination as well as cable pulling.September 17, 2003  March 03, 2004 - ELECTRICAL TECHNICIAN/FOREMAN BRUNEL INTL. S.E.S. PTE LTD.BRUNEI / CLOUGHPNG OIL REFINERYNAPA-NAPA, PAPUA NEW GUINEAMounting of aligning of switch gear panel and erecting of bus duct from switch gear to panel thru transformer. Working as a Leadman for cable pulling and cable glanding plus termination.Worked in a commissioning for motor test, arranging document for electrical and assisting QA / QC paper works. Doing as built as per construction on site in electrical had been modified, some wiring termination.January 12, 2003  June 12, 2003 CONSOLIDATED CONTRACTORS INTERNATIONAL COMPANY (S.A.L)CHIYODA CAMP STATE OF QATARWorked as charged hand electrician in cable glanding and pulling cable as well as cable termination. Taking off materials for electrical fittings and others. Report completed electrical installation.Sept. 27, 1999  June 12, 2002 CONSOLIDATED CONSTRACTORS INTERNATIONAL COMPANY (S.A.L)P.O. BOX 70193HABSHAN, ABUDHABI, UAEMounting switch gear panel and termination of cables. Loop-checking and meggering cables including welding and fabricating support, injecting current in switch gear breaker through motor controls. Lay-outing conduit, cable tray and support. March 18, 1997  Jan. 11, 1998ELECTRICIANCONSOLIDATED CONSTRACTORSCOMPANY C.C.C.P.O BOX 34DHARAN AIRPORT K.S.A.July 15, 1999  July 11, 1999 ELECTRICIAN LEAD MAN CONSOLIDATED CONSTRACTORS CO.SAUDI FERTILIZERS CO. (SAFCO)C.C.C. P.O. BOX 10952JUBALIA31961K.S.AHad been an electrical charge hand SAFCO Project, Supervision and installation of conduit. Cable tray and fire alarm panel represent. C.C.C. in electrical construction and completed electrical installation. Taking off materials needed and report electrical installation. A term leader in lay outing and termination cables.CONSTRUCTION SPECIALIST FORSAUDI ARAMCO (R.T.R.U.P)UPGRADINGPROJECT/PORT CONTROLCOMMUNICATION PROJECT DIVISIONInstalling electrical panel board, lay-outing conduit, cable tray for lighting and motors.Assisting in electrical work and report completed work.Fabricating and welding support for panel board and others.A team leader in cable pulling, meggering and testing motors and termination of cables.Cable glanding and termination.Cable termination, loop checking, modification testing and commissioning.Installation of MOV.Repairs malfunctions by such methods as replacing burned out elements, fuses and replacing defective wirings, cleaning and repairing motors.Test electrical equipment, such as motors, heaters and controls for safety and efficiency, using standards test equipment and by observing functions.Mounting of switchgear panel, termination of control.Locates and determines malfunctions using test equipment. Jan. 15, 1996  Oct. 17, 1996ELECTRICIAN LEADMANPETRON / FAFCOSAUDI ELECTRO-MECHANICALCONSTRUCTION CO., LTD.P.O. BOX 806DAMMAN 31421KINGDOM OF SAUDI ARABIAONSHORE / OFFSHOREELECTRICIAN LEADMANSAUDI ARAMCO N.G.L. REFINERYUP-GRADING PROJECTAL-SINAIYAH, YANBUKINGDOM OF SAUDI ARABIAHas been assigned to be a permit receiver in all aspect of work.Upgrading and mounting analyzer cabinet and installation of instrument tubing.Installing of conduit, fire alarm equipment, panel board and loop-checking and meggering including termination of electrical and instrument cable and glanding cable.June 05, 1994  Jan. 14, 1996 ELECTRICIAN LEAD MAN PETCON / FAFCOP.O. BOX 806DAMMAM 31421KINGDOM OF SAUDI ARABIAONSHORE / OFFSHORESAFANIYA GOSP 4Has been working in Safaniya Gosp4 Offshore and Onshore.Mounting switch gear panel, pulling and termination of cables, commissioning and test motors.Installation and termination of smoke detectors including lightning.Lay outing rigid steel condiut with PVC coated.Installing cable tray.June 1994  May 31, 1995 ELECTRICIANPETCON / FAFCOP.O. BOX 806DAMMAM 31421KINGDOM OF SAUDI ARABIAIBN HAYYAN, PETROKEMYAJUBAIL, K.S.A.Maintaining workshop including lightning, outlet and repairing drill and grinder machine.Feb. 14, 1993  May 1993 ELECTRICIANPETRON / FAFCOP.O. BOX 806DAMMAM 31421KINGDOM OF SAUDI ARABIAInstall, maintain and repair equipment needed for electrical such as generator, welding machine, drill and grinder.Assist on commission and programming of all security and fire alarm.Lay-outing, pulling dressing and termination of electrical cables. Oct. 11, 1992  Feb. 1993 ELECTRICIANPETCON / FAFCOP.O. BOX 806DAMMAM 31421KINGDOM OF SAUDI ARABIAHADDED SAUDI IRONSTEEL PLANTJUBAIL, K.S.AHas been assigned to work for Daniele Co. Ltd., the work includes mounting and alignment of the motors. Installation and termination of fire alarm devices such as fire, smoke and heat detector.Assist on commissioning and loop=checking including maintenance.Lay-outing conduit and cable fabricating support. Sept. 1992  Oct. 1992 ELECTRICIANPETCON / FAFCOP.O. BOX 806DAMMAM 31421KINGDOM OF SAUDI ARABIAGeneral Maintenance: lay-outing some additional lightning pole and maintaining the compound safe and properly including plumbing works.Lay-outing conduit, such as PVC, rigid steel galvanized, electrical metallic tubing(E.M.T.) and rigid steel PVC coated.Works project documentation in preparation of the installation and maintain accuracy record of all works done.1990  1991 ELECTRICIAND.J. ROQUE CONSTRUCTION CO.LIMAY BATAAN REFINERYCORP. (B.R.C.)Assisting in electrical work, pulling, dressing and termination of cable.Installation of lightning fixtures, magnetic switch selector with Jog-R. CHARACTER REFERENCES :Mr.Mario ValentinoConst.Ops.Mgr./Sr.Supt.Triple J Saipan Inc.Email: EMAIL AVAILABLETel.# PHONE NUMBER AVAILABLECp# PHONE NUMBER AVAILABLEMr. Danny FergusShade and Shutter Expo3147 Fred Nash Blvd.Myrtle Beach, SC 29577EMAIL AVAILABLETel PHONE NUMBER AVAILABLEI hereby certify that the above information is true and correct to the best of my knowledge and belief. Candidate's Name 

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise