| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateCandidate's Name
Construction Electrical Field EngineerEmail address: EMAIL AVAILABLETel. No. Mob PHONE NUMBER AVAILABLEEducation: B.S., Electrical Engineering, University of Houston, EIT Certificate,SUMMARY OF EXPERIENCE:Over Thirty years of experience in power, Oil and Gas in Electrical/Control engineering design and construction, System Completions and construction testing. Projects included LNG, oil and gas Pipelines, production facilities, oil refineries, and petrochemical plants, pump stations, compressor stations, offshore platforms and nuclear power generating plants.Offshore platforms and FPSOs- Functioned as electrical consultant for a Gas Compression and Production platform. Reviewed detailed design and purchase specifications at the Contractor's Engineering office. Worked offshore on a 28/14 rotation.Pump Stations - Functioned as electrical engineering and detail coordinator for oil pump stations in Bogot, Colombia. Responsibilities included electrical load analysis, short circuit and motor starting studies, vendor drawing reviews and inspection of facilities of local electrical suppliers/manufacturers. Other duties included preparation of one-line diagrams, review of electrical specifications and preparation of material requisitions.Oil Refineries - Functioned as lead electrical engineer for gas/oil separation facility. Responsible for preparation of project proposals and electrical engineering/design man-hour estimates.Petrochemical Plants - Functioned as lead electrical engineer for a rubber expansion project, MTBE and Butadiene modernization project. Participated in the start-up and energization of a 5-cell cooling tower.Power Generation Plants - Functioned as area engineer for Nuclear and Fossil Power Plants. Responsible for Electro-Hydraulic Controls (EHC) on the Main Turbine, Boiler Burner management system controls, 480 Volt one-line diagrams & development of schematic and wiring diagrams.SIGNIFICANT EXPERIENCE:October 2023 to May 2024 Saxon Global/Dominion Energy working under Dominion Energy Engineering Department at the VC Summer Nuclear 1 Power Station in Jenkinsville S.C. Responsible for developing Engineering requests to replace existing motors older than 10 years. Other responsibilities included coordination with HV and LV motor manufacturers such as GE, Westinghouse and Electrical Machinery. Walkdowns to review and document existing installation was also included.April 2023 to September 2023- took time off and job searchingNovember 2021 to March 2023 Global edge cons. Working for Bechtel Power as Sr. Electrical Field Engineer. On the Vogtle 3&4 Nuclear Power Plant Project. Duties include verification and inspections of Electrical raceway (conduit and cable tray) and to verify lengths and installation is according to project standards, as well as NRC requirements. Also, responsible for completing inspections involving cable and wire terminations and inspection of installation of stress cones on MV cables and Work Package closure. Assisted Project Completions group in completing and closing work packages.September 2019 to Oct 2021 General Electrical superintendent. Working for Gulf Coast Growth Ventures (GCGV) A joint venture company made up of ExxonMobil and Sabic Industries. The project consists of Modular construction of a plastics manufacturing facility located in San Patricio County in Texas.The project successfully achieved Construction Mechanical completion in September 2021. Nearly two months ahead of schedule. The project was of Modular design. Modules were manufactured in China and transported by barge/ship to Ingleside, Texas Port.Responsible for working with construction contractor to ensure all Engineering Design and specification are properly and timely executed. The project consists of 35kV feeders to various Local Electrical substations. The project also consists of installation of Underground Electrical Duct banks. Power. Control, Instrumentation and Fiber Optic cables are installed inside the duct banks. The Electrical Buildings consist of 13.8 and 4.16kv Arc-resistant Switchgears as well as 480V Switchgear/MCCs. Include in the project is the installation of Adjustable Speed Drives and Silicon controlled rectifier (SCR) units and Uninterruptible Power Supplies (UPS) units.Duties also include Project completions and Commissioning turnover ready for start-up, as well as keeping up with schedules and progress reporting. Perform completions walk downs of construction turnover systems.October 2018 to March 2019 Company and Project are of Confidential nature, working as Electrical Field Superintendent responsible for Electrical Subcontractors execution of the electrical works. Project consists of electrical equipment installations, including twenty-eight (28) 2400kVA generators and 27kV switchgear.Nov 2017 to September 2018 unemployed due to company losing the Construction management contract at Vogtle Unit 3 and 4.January 2017 to Nov 17 Electrical Lead Superintendent, Vogtle Unit 3 Generator Turbine Building. Responsible for providing work status input and progress on the Projects work schedule. Provide Support for Initial Energization activities. Other responsibilities include coordinating and assigning electrical work packages to General Forman (Electrical Craft) for work execution. Ensure full attendance from electrical craft during safety tool box talks. Provide electrical construction progress reports. Participate in weekly safety walk downs. Insure craft compliance with Lockout-Tagout (LOTO) procedures.January 2014 to July 2015 Electrical and Instrument Construction Lead on the Froth KEP Project (contract with Imperial Oil Canada. (Kearl Oil Sands Jobsite) - Assigned to the Kearl Oil Sands jobsite Fort Mc Murray Alberta Canada.Work included field inspections and the physical ability to conduct field inspections which require the following activities: extensive walking in and around a construction site, climbing ladders and scaffolding, working on elevated platforms, working on uneven surfaces and working in small or confined spaces.Facilitate E&I punch lists walk downs at mechanical completion. Review and sort out the punch list items identified during the systems' walk downs and ensure the information is inputted correctly in the ORBIT Completions and commissioning management system.Participated in commissioning/startup schedule forecasting and preparing of completions activities. Expedited the review and signing of the completed punch lists by the personnel so as to ensure the completion of the systems and subsystems in a timely manner. Support the completions teams in identifying any possible schedule impacts as a consequence of delays in getting the punchlist sign-offs. Interface with and updated the Systems Completions Tool ORBIT, as required.January 2011 to December 2013 Electrical and Instrument construction and design consultant to Imperial Oil Canada (Edmonton, AB Canada) - Assigned to the Edmonton Contractors modular yards (Kiewit, PCL and HCBI). The project employed a modular approach to its execution, which included the assembly of large, complex and heavy Process Modules, Electrical buildings, as well as simple and relatively light Pipe Rack Modules.Responsibilities included but were not limited to code compliance and engineering drawing verifications during module fabrication. Ensuring that work being performed is within scope of services and within budget.Also, responsible for supervising the installation of Electrical equipment such as 5kV Switchgear and Motor control centers, High voltage Variable frequency drives and 600V Motor control centers inside the Electrical buildings. Coordinated activities with QC representatives for approval on work as it is accomplished. Performed inspections and completed documentation of all electrical and instrumentation work in progress on a continuing basis. This also included review of Heat Tracing Isometric drawings and identifying material required.Assisted project manager and project controls in preparation of short-term schedules related to Electrical and Instrumentation activities. Trouble-shoot engineering design, resolved issues with engineering and/or fabricator.Computer literate; Microsoft Office suite. Conversant with Turnover software (WinPCS, ORBIT).January 2008 to December 2010 Electrical testing and commissioning Lead on Ras Laffan Qatargas 2 LNG Project, consisting of two liquefied natural gas (LNG) trains each with a capacity of 7.8 million tones per annum (mtpa) and 0.85 mtpa of Liquefied Petroleum Gas (LPG), 140,000 bpd of condensate, three storage tanks, power utilities and water injection systems.Electrical commissioning Engineer responsible for overseeing the pre-commissioning and commissioning/testing (functional testing) of three (3) 44 MW Steam turbine driven electrical generators and one (1) Frame 6, 35MW, Gas Turbine generator. Power was generated at 11kV and stepped up to 66kV with use of step-up transformers. Duties required development of the testing procedures for the generators using an external, mostly resistive 25MW Load Bank. Activities included review and testing of the transformer and generator protection, the synchronizing of the three STGs and GTG with each other and synchronizing to an existing plant. Other duties included coordinating the electrical completions work effort with various process system disciplines. WinPCS sofware package was used for project completion and turnover.FLUOR DANIEL, INC., Sugar Land, TX 2001 to January 2008PRINCIPAL DESIGN ENGINEEROctober 2007 to December 2007 Electrical Site Lead Engineer assigned to the Fluor Field office for the Common Off-plots project in Ras Laffan in Qatar. Responsibilities included review and coordination of turnover and completion documents. Other duties included resolving field problems and leading activities for system completions.April 2007 to September 2007 assigned to the Fluor Engineering office in Lagos, Nigeria as Electrical Lead Engineer. Responsibilities included the training of Nigerian engineers/designers. The training program included familiarity with NEC and IEC standards. Held training sessions with Nigerian engineers to become failiar with Fluor Corp's Design practices as well as development of Area classification drawings using NFPA and IEC standards. Other responsibilities included man-hour estimates for project proposals related to Oil and Gas installations in Nigeria.July 2006 to Present Assigned to Chayvo, Russia on Sakhalin Island to perform the final Hook-up and Commissioning of the electrical systems for ExxonMobil's OPF Project for. Electrical Commissioning Lead Engineer. Responsibilities included starting and commissioning of 10/6Kv and 400V motors and completion of electrical testing check sheets. Other duties include responsible authority for enforcing Lockout-Tagout (LOTO) proceduresMarch 2004 to July 2006 assigned to Ulsan, Korea Offshore Production Facilities (OPF) Project Module fabrication. Electrical Commissioning Lead Engineer. Responsible for pre-commissioning and commissioning of 10kV, 50Hz Swgr, 400VAC switchgear and UPS electrical equipment.July 2002 to March 2004 assigned to Ulsan, Korea Kizomba A and Kizomba B FPSO Project for ExxonMobil. Responsible for coordinating the electrical engineering turnover packages for development of fabrication shop drawings. Participated in the commissioning of 5/15kV switchgear with vendors assistance.Houston Office April to July 2002, Kizomba A FPSO Project. Responsible for the coordination of equipment Inspection and witness testing at vendors facility. Duties included Witness testing of the generator and the excitation control panel at Jeumont, France, a 7000HP electric motor in Berlin, Germany, a 5000HP motor in Campinas Brazil, the Pedestal crane kick-off meeting in Molde, Norway. Participated in the Inspection and FATs of the Firewater Pump, Essential Generator and Instrument air compressor skids. Also responsible for coordinating Electrical equipment Access and removal requirements for the material handling specification.Jakarta, Indonesia December 2001 through March 2002. - Assigned to the ExxonMobil Banyu Urip CEPU project in Jakarta Indonesia to perform technical evaluation of Large Turbine Generators (25mW) and 11kV switchgear. A pre-assembled switchgear building to house the switchgear and Motor control centers was also included in the technical evaluation. Other duties include the technical evaluation of the EPC-A contract. Evaluation consisted of review of Contractors Bids for compliance with ExxonMobil technical requirements.Houston Office - Lead Electrical engineering specialist for offshore platforms assigned to Bohai Bay Phase I China project. Responsible for evaluating bids for electrical equipment such as Medium Voltage Variable Frequency drives, dry type transformers, Medium Voltage Subsea Cable, Switchgear and Motor Control center and. Equipment to be installed on a Wellhead Platform.BECHTEL CORP, Houston, Texas, (1997 - 2001)ENGINEERING SUPERVISORAssigned to the Cantarell project offshore on a Crane Barge. The Cantarell Oil Field project is located in the Gulf of Mexico off the coast of Campeche, Mexico.Responsible for the inspection and supervision of construction contractors Electrical and Instrumentation activities on offshore oil production and gas compression platforms for Pemex, the Mexican Oil company.ELECTRICAL SUPERVISORYucatan Peninsula Gas Pipeline Project. - Assignment in Mexico.Responsible for the engineering and design of the electrical equipment needed to support operations of a 24, 680Km gas pipeline, including a gas compressor station and three delivery stations. Initially assigned to Mexico City, Mexico to oversee the electrical subcontractor and ensure the project complies with Bechtels design criteria as well as industry standards and the National Electrical Code. Local Mexican standards were also followed, where applicable. Relocated to Merida Yucatan, Mexico, to continue the monitoring and develop a construction subcontract scopes of work. Moved to Macuspana, Tabasco, Mexico, to supervise the electrical construction activities as well as the electrical construction subcontractor of a gas compressor station. Responsible for the pre-commissioning and commissioning of all the electrical aspects of the project as well.FLUOR DANIEL, INC., Sugar Land, TX (1990 - 1997)ELECTRICAL SUPERVISORClients Electrical Engineer / Consultant / Lead Electrical Engineer.Central Compression platform, White Tiger Field project, PetroVietnam - Offshore platform Republic of Vietnam.The project consisted of five Solar Mars Compressors and three Centaur 40 engines driving an electrical generator on an offshore platform. Acted as electrical engineering consultant responsible for client reviews, recommendations and applying international and American Standards to Contractor's engineering specifications and detail design drawings. Detailed design was performed in New Delhi, India (Nov. 1995-May 1996). Equipment inspections were performed in Singapore (6.3 kV Switchgear) and Australia (380V Switchgear/MCC's). The project then moved to South Korea (May 1996- March 1997) for fabrication of the platform. There, responsibilities included equipment installation inspections and later on witnessing site pre-commissioning of the electrical equipment. Duration of assignment was 16 Months.La Amistad Power Project, Quito, Ecuador. BHP (1995 - 1995)Participated as electrical consultant and translator (Spanish/English) in the negotiations with the local electrical utility government. Assignment included business trips to Quito, Ecuador.Revamp-Methanol/Restart Project, Hoechst Celanese, Clear Lake, TXResponsible for equipment sizing, requisitioning, and electrical equipment revamp on site. Responsible for the coordination of home office and onsite activities to refurbish existing motors and lighting systems, as well as existing switchgear and motor control center.Los Llanos Central Upgrade of Pump Stations, British Petroleum Exploration, Bogot, ColombiaResponsible for engineering and detail design coordination for pump station at Miraflores, El Porvenir and Vasconia. Other duties included preparation of material requisitions and inspection of facilities of local (Colombian) electrical suppliers.105 MW Power Plant, Enron, PhilippinesResponsible for cathodic protection, system grounding and lightning protection, 230kV substation design coordination and preparation of material requisitions for 480V switchgear and motor control center enclosed in a steel frame modular type building.Cusiana Field Development, B.P. Exploration, Colombia, South AmericaFunctioned as area engineer. Responsible for sizing the plant's gas turbine driven electrical generators, sizing the 15 kV and 5 kV switchgear and total electrical load tabulation.Lead Electrical Engineer, Marjan Onshore Project, Aramco, Saudi ArabiaResponsibilities included electrical studies, equipment sizing, specifications and material requisitions. Other duties included development of the electrical section of the project proposal, man-hour and material estimate, plants operation manual and start-up specification.BECHTEL CORPORATION, Houston, TX (1987 - 1990)LEAD ELECTRICAL ENGINEERButadiene and MTBE Modernization Project for TXResponsibilities included electrical studies, one-line diagrams, material requisition for five power control buildings and transformers. Other duties included equipment sizing, 13.8 KV overhead line and start-up and energization of a 5-cell cooling tower.Rubber Manufacturing Project, PolysarResponsible for preparation of the electrical man-hour and material detail estimate and manpower loading.Bisphenol BPA-4, Shell, Deer Park, TXFunctioned as area engineer responsible for equipment sizing, electrical studies, equipment specifications and material requisitions. Also responsible for the coordination of the heat tracing material and design with the vendor.BECHTEL ENERGY CORPORATION, Houston, TX (1982 - 1987)AREA ELECTRICAL ENGINEERSouth Texas Nuclear Power Project - HL&PResponsible for development of 4.16 KV one lines and schematic diagrams for HVAC systems, steam turbine controls, electro-hydraulic controller and UPS sizing. Other duties included field assignment for coordination of system turnover schedules, and site support engineering for the operations group.JACOBS ENGINEERING, Houston, TX (1981 - 1982)Strategic Petroleum ReserveResponsible for electrical studies, including short circuit and relay coordination, vendor coordination, schematics and layout drawings.BECHTEL POWER COMPANY, Houston, TX (1980 - 1981)ELECTRICAL ENGINEERINGDuties are to prepare schematics from logic diagrams and connection wiring diagrams and to review vendor drawing accordingly.Responsible for the electrical design of such systems as Boiler Control and Burner Control.Systems, 13.8KV SWGR and Motor Control Centers. Also coordinate the design with othergroups and disciplines, vendors, and field engineers.EBASCO SERVICES, INC. Houston, TX (1979 - 1980)ASSOCIATE FIELD ENGINEERSt. Lucie Nuclear Power Plant Unit #2.Responsibilities included: Preparation of Field Change Requests (FCR's) which involved changes to safety and non safety related electrical equipment.Investigated non-conformance reports on safety related equipment with a manufacturer representative. Assisted in the design of a control wiring diagram.BROWN & ROOT, INC. Houston, TX (1978 - 1979)ELECTRICAL ENGINEERPower Division, Electrical Engineering Department. I went through the company's training for new engineers, which consisted of familiarity with the company's standards, technical courses and three month field training at Comanche Peak Nuclear Station 1 & 2. Other duties included the design of logic diagrams, development of control wiring diagrams and review of vendor drawings. These duties were applied to both fossil power plants and nuclear power plants. |