| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateCandidate's Name
Street Address Sterling Circle NW Apt.BBirmingham,Alabama Street Address
Cell: PHONE NUMBER AVAILABLEEducation:CHELSEA HIGH SCHOOLAdvanced High School DiplomaProjects:I-59/20 Bridge Replacement Project - Birmingham, AL (Survey Tech/Rodman)Technical Skills/Core Competencies:Excellent interpersonal, written and oral communication skillsAdept at computer aided design and actual layout/data collection solutionsincluding AutoCAD Civil 3D design software and Magnet Field softwareProficient with Topcon surveying equipmentOperating systems and software knowledge include: Windows 11, Microsoft OfficeProfessional package (Microsoft Word, Excel, PowerPoint, Publisher, Access)Teamwork, decision-making, self-motivation, integrity, result-orientationWork Experience:BHATE GEOSCIENCE ENGINEERING-BIRMINGHAM, AL(November 2023 to December 2023)Field Tech responsibilities were as follows: Test concrete per ASTM standardsSCHOEL ENGINEERING-BIRMINGHAM, AL(December 2022 to November 2023)Land surveying. Reading floor plans aswell as maps.Labor including cutting line in the woods. Setting points in rural and city projects.ATLANTIC AVIATIONPlane Refueler(February 2020 to December 2022)Following protocol when it comes to refueling and taking loads at the BHM site.JOHNSON BROTHERS CORPORATION - BIRMINGHAM, ALSurvey Technician/Rodman Full-time (July 2018 to February 2020)Acted as a rodman/survey technician for a field survey crew engaged in the daily activities of the I-59/20 Central Business District Bridge Replacement Project in downtown Birmingham, ALPerformed multiple heavy civil construction tasks such as construction staking, grading/excavating, setting footers, aligning bridge columns and caps, QA/QC of forms and elevations, and as-built surveyingAligned and adjusted precast pier and expansion segments, all while using the span-by-span construction method utilizing falsework towers for the bridges erection.Performed field surveying for roadways and bridges, including installing surveying construction stakes, tying out existing intersection ties, and locating orestablishing vertical and horizontal control, right of way, monuments, corners, and boundaries.Reason for leaving: Once the project was completed, Johnson Bros. Corp. left the area, and I chose to accept a position with a company in Birmingham.Professional References:Keltin Garrett (Project Manager Turnipseed International):EMAIL AVAILABLEoPHONE NUMBER AVAILABLEJason Anderson (Survey Manager Johnson Bros. Corp. I-59/20 Bridge Replacement Project):oPHONE NUMBER AVAILABLE |