| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateDear Sir/Madam!I offer my services for this post as Civil Engineer.I am confident enough to enclose my CV along with this letter of application and I am sure my qualification and experience meet your requirements; I hope my background will meet your requirement and give you a solstice impression to call me up for an interview/test. You can reach me through e-mail EMAIL AVAILABLE or via phonePHONE NUMBER AVAILABLE or PHONE NUMBER AVAILABLE and all calls will be answered. Yours faithfullyCandidate's Name
RESUMME Personal Details: Name: Jalat Khan Nasery Father Name: Abdul Hamid Place of Birth: Kabul Afghanistan Gender: Male Marital Status: Married Mobile: PHONE NUMBER AVAILABLE Email: EMAIL AVAILABLE Education and Qualification: From1990 to 2003: Kabul University Engineering Faculty Civil Department. From 1993 to 1998: Qala-e-Moradbic High School (Baccalaureate degree) 21-25/01/2006 : Water Supply Work Shop CARE Kabul 20-24/12/2005 : Management Work Shop CARE Kabul 2731/3/2005 : PRA Work Shop CARE Kabul 16-17/02/2005 : Community Empowerment Work Shop CARE Kabul 16-17/01/2005 : NSP Implementation Management Work Shop in CARE 27-30/09/2005 : Afghan Germen Waste Water Management Work Shop Employments: Site engineer in Sallyport global. from 01, Nov,2016 to Now. Monitoring and Evaluation of Projects. Construction Verification of Projects. Utility Serving of MOD (ministry of Defense and MOI ministry of interior Projects). making hand sketch and drawing it in AutoCAD. Drawing of site plan and floor plan for MOD & MOE project in Auto cad. Check and control of the water Treatment system, Power plant, and waste water treatment system. Check and Monitor of Power plant and waste water treatment system with all data. Preparing daily, weekly and monthly Report and work plan to the office. Assist in preparing of proposals and tendering Thinking creatively and logically to resolve design and development problems Checking the work of constructors according to specifications. Resolving of any technical problem arising in the site. Perform other duties as requested by supervisor. Assessment engineer in AMEC/EMR from 01, Apr,2011 to 30, Mar, 2016. Monitoring and Evaluation of Projects. Construction Verification of Projects. Utility Serving of MOD (ministry of Defense and MOI ministry of interior Projects). making hand sketch and drawing it in AutoCAD. Drawing of site plan and floor plan for MOD & MOE project. Check and control of the water Treatment system Check and Monitor of Power plant and waste water treatment system with all data. Preparing daily, weekly and monthly Report and work plan to the office. Assist in preparing of proposals and tendering Thinking creatively and logically to resolve design and development problems Checking the work of constructors according or appropriate engineering documents and specifications. Resolving of any technical problem arising in the site. Perform other duties as requested by supervisor. Assessment engineer in MACTEC lnc. from 01, Jan,2010 to 30, March, 2011. making hand sketch and drawing it in AutoCAD. Drawing of site plan and floor plan for MOD & MOE project. Check and control of the water Treatment system Check and Monitor of Power plant and waste water treatment system with all data. Taking of site Sketch and draw in Auto CAD program. Implementation of Hydro technical structures projects (dam, intake, irrigation canals, micro hydro power, irrigation drainage and cross drainage structures, etc.). Assist in design of small and medium scale dams and implementation of them in the site. Managing the progress, cost, time, quality, quantity, environmental and other parameters of the project in the site. Estimation of daily consumption of construction materials for each day. Assist Senior Engineers in design and preparing of drawings, documents (drawings, Quantities, work plans). Assist design Engineers in changing the design as per site requirements. Preparing daily, weekly and monthly Report and work plan to the office. From 2008 to 2009 Work as Technical Engineer ministery of emigration Preparing Project Documents for Project controlling and Monitoring . Daily report and weekly report to main office . Preparation of Auto Cad Drawings of building and other structures . Looking after of Construction Projects as per specifications. Manage, Plan, develop, organize, and control engineering program related activities. Estimate the cost of projects necessary tools and equipments. Make site visits, supervise, monitor and ensure that the needs of the engineering/ construction projects are met and implementations of the agreed plans are carried out in a timely and appropriate manner . Undertaking technical and feasibility studies and site investigation. Produce detail and documentations for the construction and implementation of projects. Organize delivery of material, plant and equipment needed for the construction project and supervise labors . To make daily work plan and work as team Member . Thinking both creatively and logically to solve design and developments problems. From 01-02-2007 to 2008 worked As Project Supervisor IAM/DMPHEWS-Kapitsa Preparing work plan, time line, estimation, and financial duties . Keep control of budgets booth in community and district level. Ensue to avoid any over expenditures. Prepare community wide work calendar and specify resource required to undertake the plane . Ensure that the plan is shared with the communities and therefore is attainable and have the endorsement of the community. Explain the project objectives to the communities and ensure project ownership by the participation communities. Ensure a high level of community participation and contribution. Ensure that the whole community members are involved in the decision-making. Provide condition in which the unskilled labors can receive on the job artisan training. Conduct a good performance management. Demonstrate a good team work. Involve others in decision-making and keep them informed of affairs . Provide all logistical and technical support to the field engineers as and when needed . Select project based on community needs and priorities. Participate in the process of setting baselines and conduct baseline surveys. Ensure that technical designs are as per standard and with a high add safe quality. Ensure that the cost estimation are realistic and with-in the boundary of less than ten percent variation. Submit community/ project progress and completion reports to Project supervisor on time and as per standard formats with a high standard of accuracy. Use standard and official monitoring forms during project visits. Make use of site journal, record comments and observation on projects . Insure that the community is undertaking the work and are involved in monitoring. Insure that the workers are getting paid on time and in a professional way. Ensue that the vulnerable sector of community is considered for employment; especially those who cant be benefited form the projects . From 01-03-2005 to January 2007: As Technical Facilitator in CARE International having responsibility for following jobs: Supervising the irrigation project in Balkh River Basin, which have construction progress on irrigation structures in different places of Balkh districts Managing the construction activities in Saripul province, which were the irrigation structures such as; intake, siphon, aqueduct, concrete lining and retaining walls. Preparation of work plane for all approved projects Preparation of necessary design and estimation for approved project. Participation in any engineering relevant meeting. Being responsible for coordination construction activities with other relevant department on regional base From 09-05-2004 to 2005: As Field Engineer in CARE International being responsible for Following duties Preparation of daily reports through QCS software Preparation of product data for submittals Preparation of contractor invoice for payment Checking of materials Controlling the requirement of materials . Responsible for quality and quantity of the project Supervision of the project Arrange the testing of concrete sample of Nayebabad Monitoring the Nayebabad power station construction project Conducting monitoring visit to the road construction Preparation technical data and information for the company based on instruction of the director and Requirement of the firm. Languages Language Reading Writing Speaking Dari Fluent Fluent Fluent Pashto Fluent Fluent Fluent English Excellent Excellent o Excellent Computer skills:MS Office.Auto-CADTyping Pashto, Dari, and English (50) cap.ReferenceEng Mohammad naser AkhtaryMobile No : PHONE NUMBER AVAILABLE/pre> |