| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateCandidate's Name
Street Address Nolen LaneCharlotte, NC-Street Address
Cell: PHONE NUMBER AVAILABLEEmail: EMAIL AVAILABLECareer Objective:Seeking a challenging position in the field of Mechanical Engineering, performing Piping & Valve Stress Analysis, and Construction support. Certified as Six Sigma Green Belt, Agile/Scrum Master, and trained in Project Management Professionals (PMI approved Training Vendor). Federal Emergency Response (FEMA) Official (FERO) and Project Manager.Summary of Experience:Experience in Nuclear & Fossil Power generation, Industrial Manufacturing Plants.Specializing in the stress, deflection, thermal, and vibration analysis of fossil and nuclear power plant components (Penetrations, piping & Valve) according to ASME III NB, NC, ND, NF (Class 1, 2 & 3), ASME VIII, WRC107. B31.1, B31.3, B16.34, and B16.5.Familiar with Plant Operating systems.Review on safety piping systems modification for 10CFR 50/59 evaluations, and Mechanical Modifications.Construction Management, Project controls and Project management.Quality Assurance (QA) and Quality Controls (QC) audits and Inspections per ASME NQA-1&d ASME NCA-4000.Steam Generator Replacement, extended power uprate (EPU) Projects, and Major Equipment modifications.Combined Cycle Power Generation Design and Construction.Engineering Computer Software Experience Design and Management:AutoPipe, Caesar II, PipeStress (PepS), ME101, NuPipe, Superpipe, T-Pipe, SmartPlant Reviews and Plant Design Review (PDS), Navisworks, Primavera 6.0, MS Project, Oracle, SAP, Enovia.Education:B. Sc (Mathematics, Physics, and Chemistry), Osmania University, India.Diploma in Environmental Engineering, Northeastern University, Boston, MA.MS degree courses from UMass Lowell and Tufts University, Boston MA in Environmental Sciences.Employment History:Enterprise Asset Management Consultant (International Projects in India) 01/2018 to 03/2020Assessments of fossil fuel power plants, Industrial and manufacturing plants for reduction in operating costs, manage capital expenditures, and improve asset use and productivity, and reduction in Environmental Pollutions.Complete solution for achieving optimal condition of assets with the least amount of costs and the best possible asset performance for Clients. Owner Management on capital expenditure, reduce operating costs, improve asset utilization, and collaborate with engineering and maintenance.The Steam Generator Team (System One) (SGT): Charlotte, NC 08/2016 to 12/2017Contract Systems EngineerAssigned to Watts bar Unit II Steam Generator Replacement (SGR) task, Rereview of all the Piping connected to Steam Generators for Mechanical Modifications. Piping/Tubing (Signal Processing Tubing) analysis, Nozzle qualifications, Valve qualifications with the Project procedures and Codes.General Electric (Oil & Gas) Avon, MA 06/15 to 01/16Consulting Control Valve Design EngineerAssigned to Staff Engineering Group (Control Valve design- Commercial and Nuclear) group. Performing Control Valve design analysis including seismic per ASME Section III, ASME B31.1 and B16.34 Code requirements. Responsible for preparation of Corrective Action Reports (CARs), Notice of Violations (NOVs), Non- Conformance Reports (NCRs), Critical Characteristic Records (CCR) and Critical Component Evaluations (CCEs).Westinghouse Nuclear LLC (WICI/System One), Cranberry, PA & Waynesboro GA 02/10 to 02/15(Except 06/2011 thru 03/2012, and 06-01-2014 thru 09-02-2014)Consulting Design/Construction EngineerAssigned to AP1000 Standard Plant Construction support, Piping Design (Flex Frames, and Mechanical Modules), Construction design coordination with Field Engineering & Westinghouse partners on various design non-conformance and disposition of RFIs, DCPs, N&Ds and E&DCRs.Enercon Services Inc., Parsippany NJ 07/14 to 10/14Mechanical Consulting EngineerPerformed Pipe Stress analysis per NRC Order EA-12-049 FLEX (Fukushima) Modifications on TMI Project. Review of plant modification and verification of stress calculations performed by plant design group.Bechtel (WICI), Jensen Beach, FL and Fredrick, MD 06/11 to 03/12Mechanical Field Engineering ConsultantAssigned to FPL (St. Lucie Project). Class 1 and 2 Piping analysis on EPU (power up rate), and review of ECN, CRs, NCR, DCPs. Construction support modifications on Piping and Pipe Supports.Shaw Group/ Caliper Inc.), Charlotte, NC 03/09 to 01/10Contract Mechanical EngineerAssigned to Duke Energy Cliffside Modernization Project, 800 MW Coal Fired Power Plant Pipe Stress Analysis per ASME B31.1 Code requirements.Parsons Engineering, Aiken, SC/Quality Technical services and HKA 03/08 to 02/09Lead Mechanical/Pipe Stress EngineerAssigned to Salt Waste Process Plant (DOE). Responsible for PC-1 (Class 2 & 3) Piping analysis per ASME B31.3 Code requirements.Shaw Group (Stone & Webster Engineering), Stoughton, MA 04/05 to 02/08Principal Engineer/Construction support LeadAssigned to Lungman, Taiwan Project (BWR). Emphasis on qualification of equipment nozzle loads, and valve accelerations.Westinghouse Electric Corporation, PA 05/04 to 05/05Principal Engineer/Construction Support EngineerAssigned to Comanche Peak Steam Generator Replacement task, and evaluation of Design Change Notifications (DCNs). Performed Class 1 & 2 piping systems analysis.Shaw (Stone & Webster) Construction Engineering, MA 01/03 to 04/04Construction SupervisorAssigned to Tennessee Valley Authority at Browns Ferry Unit-1, 2, 3. Mechanical modification packages. Reviewed and evaluated Design Change Notifications (DCNs). Also, responsible for Piping and Pipe Support Modification Packages. Also, Responsible for Review of Construction Procedures.Bechtel Engineering Services, MD 04/02 to 10/02Senior Piping and Construction Support EngineerTennessee Valley Authority at Browns Ferry Unit-1. Evaluation of pipe stress and support calculations using T-PIPE program. Preparation of Support modifications and resolving CARs on Anchor/Stud Bolt installations, base plate, and embedded plate installations. Supporting Unit 2 and 3 operating issues, initiation, and disposition of DCNs. Assisting TVA for preparation scope of work and relevant procedures. Also preparing design change modifications and resolving conditional reports. |