Quantcast

Control System Systems Resume Leesburg, ...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Control System Systems
Target Location US-OH-Leesburg
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes

Computer Systems System Software Williamsburg, OH

Software Engineer Management System Mason, OH

Product Development System Integration Lewis Center, OH

Systems Analyst It Manager Troy, OH

Customer Service Business Systems Hilliard, OH

Customer Service Quality Control Springfield, OH

Quality Assurance Control Reynoldsburg, OH

Click here or scroll down to respond to this candidate
Resume of Candidate's Name
Street Address  Bridges RdLeesburg, Oh Street Address  09/23/2021EMAIL AVAILABLE PHONE NUMBER AVAILABLE CellEXPERIENCE:Senior design specialist for Areva Nuclear at the Bellefonte Nuclear Station. Design lead for the Balance of Plant and Safety Auxiliary control systems. Developed logic from legacy design to institute in the DCS control system. Conversion of analog system to digital control.Senior Instrumentation and Controls Designer. Chemical and Petro-Chemical Engineering for Chemstress Consultant Company in Akron, recently involved in designing DCS control system and all field inputs for large chemical plant upgrade and well as small projects for local oil refinery. Assembling detailed planning packages for Instrumentation.Construction site Area Manager for I&C and Electrical. $120M upgrade. Responsible for interfacing with electrical contractors. Ensuring work was done safely and in a timely manner. Addressing any request for information, RFI, and providing direction to contractor. Was on site in this capacity for seventeen months. Directed / supervised craft electricians as necessary to complete design to control systems.Test Engineer for all startup phases of Nuclear Power Plant. Pre-operational test writer to I&C Technician, performing calibrations and loop checks. Walk down of systems in preparation for startup. Verifying P&ID drawings against actual plant configurations. Worked PWR and BWR.Procedure writer for I&C system procedures and surveillance. Lead writer for special project at Wolf Creek Nuclear Plant.Procedure writer for I&C workgroup 15 years. Wrote system procedures and surveillances. Made corrections to work group procedures.Performed planning and scheduling duties for engineering workgroup for ten years. P6 trained and certified.04/20/2017 to 06/15/2020: Fastenal- Hillsboro, Ohio.Part time sales associate: Receiving parts, filling orders, making deliveries of parts.05/02/2016 to 6/6/2016: Enercon Federal Services, Kennesaw, GaConstruction Coordinator: At a DOE site in Piketon, OH Working with submittals between construction companies and plant document control.09/02/2013 to 01/17/2016: Chemstress Consultant Company, Akron, OhDesign: Senior I&C Design Specialist for chemical and Petro-Chemical design. Involved in estimates, design engineering, and site commissioning. First seven months spent in the office. Was on industrial site for seventeen months as Area Manager for Electrical and Instrumentation. $120 million plus, plant upgrade. Time spent verifying contractors installations and resolving issues of electrical contractor and design team from home office. Worked extensively with ABB DCS.11/01/2010 to 07/17/2013: Bellefonte project for Areva in Hollywood, Al.Design: Lead, I&C System Design Engineer for Balance of Plant and Safety Auxiliary control systems. Working to remove all original controls and upgrade to digital platform. Upgrading multiple platforms to the Areva TelepermXS for Safety Related and Siemens T3000 DCS for Non-Safety. Many of the 10% design packages have been completed. Performed design and provided oversight to others in preparing logic drawings that represent the control logic for control system circuits.08/10 to 10/10: Wolf Creek Nuclear Power Plant, Kan-SealProcedures: Lead Writer. Updating and revising Maintenance procedures for Single Point of Entry System. Reviewed two thousand plus procedures. Made changes to several hundred for SPOE and NRCs Letter RIS 2005-20 Degraded and Nonconforming Conditions affecting Systems, Structures, and Components.02/10 to 03/10: D. C. Cook Nuclear Power Plant, Sun Technical ServicesInstrument and Controls Technician at unit one, 23rd refueling outage.7/89 to 2/10: Perry Nuclear Power Plant: As permanent staff employee.Procedures: Developing, revising, and upgrading procedures used by work-group for sixteen years. Administrative, Surveillance, Maintenance, and Calibration procedures. Writing Pre-operational test procedures.Maintenance: Performed instrument calibrations and surveillance instructions for maintaining systems. AOVs during outages. Fisher Flowscan qualified. Seismic and Meteorological subject matter expert.Modifications: Involved in the install / test and completion of the Foxboro IA, Digital Feedwater Control System upgrades. During major upgrades to plant computer system; was key player involved with installation and testing of I/O systems. Transmitter replacement project, over one hundred transmitters replaced. Meteorological tower upgrade.Planning and Scheduling: for work group. Performed planning and scheduling duties for engineering workgroup for ten years. Worked full time as Electrical PM planner in preparation for Refueling Outage Five in year prior to outage.Plant Computer: Repair and maintenance of plants mainframe computer system. Repair and maintenance of Security computer system.System Specialties: Meteorological Monitoring, Seismic, Plant Computer, Foxboro IA Digital Control System, Security Computer System, Reactor Protection System, Radiation Monitoring.Fiber Optic: Performed five thousand plus terminations and splices, planning and installing fiber-optic backbone for PNPP.Training: Responsible for development, training, and supervising of newly hired technicians.Spare Parts: Ordering of parts, doing field returns, and out going shipment authorizations. Interfaced with vendors when required to resolve calibration or spare part issues.Condition Reports: Writing and answering Condition Reports utilizing the CREST system.7/87 to 7/89 Instrument and Controls Technician at PNPP. Duties Included calibration and repair of instruments and instrument loops. Electronics, pneumatics, hydraulics and electromechanical systems. Texas Instruments and Allen Bradley PLC's.6/82 to 7/87 Instrument and Controls Technician. Worked as a consultant at variousother startups in nuclear power: Midland, Calloway, Plant Vogtle,Grand Gulf and Perry.6/79 to 6/82 Controls Mechanic, Dayton Power and Light. J. M. Stewart and

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise