| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateCandidate's Name
Beech Island, SC Street Address
EMAIL AVAILABLEPHONE NUMBER AVAILABLESeeking a position that will recognize my Construction and Engineering Experience. This position will allow me to train personnel and implement sound construction practices while meeting field installation requirements during construction activities. Ability to read and interpret Architectural. Civil, Electrical, Equipment, Rebar, Structural Steel, and Piping Isometric Drawings. Knowledgeable and have implemented during construction activities with adherence to the following National Codes/Specifications ACI, NEC, NFPA 70, ASI, and Site Specific. Implementation and Adherence to Project Specifications, Procedures, Codes, and Work Ethics. As well as ANSI/ASME standards. Generate Work Packages for Civil, Electrical, and Mechanical construction activities. Extensive background in vertical and horizontal controls for building layout. Pre-pour inspection of base-matt (s), foundations, wall placements, and roof slabs. Align and set to horizontal elevations - motors, vessels, tanks, and process equipment. Perform topographical, route, and construction survey work. Compile as-built data of installed items - concrete, embeds, sleeves, block out(s), and structural steel. Perform mathematical calculations for quantities and adherence to tolerances. Basic knowledge of CAD (ability to modify) and Project Scheduling (Primavera). Project Controls - Review of Manpower, Material, and Equipment restraints. Configuration Management and Start Up. Perform Walk downs of assigned systems. ACI Post installed anchors and torque requirements. Trained to M. & T. E. program requirements. Calibrate and Maintain Optical Alignment Equipment. Held classes as an Instructor for Field Engineering (line and grade) while employed in Florida. Computer literate with extensive experience in Filenet, Word, and Excel Work ExperienceField Engineer/SurveyorGA WEST-Huger, SCOctober 2023 to PresentSupervise and direct employees providing datum lines for use by other crafts during construction activities.ElectricianCarolina Construction Services-Graniteville, SCJune 2022 to Presentinstall electrical raceways, pull various circuits, install equipment, terminate circuits. Test equipment for correct voltage and amperes.Electrical General ForemanAustin Industrial-Beech Island, SCApril 2022 to June 2022Electrical/Mechanical GF - Responsible to the PM for directing both disciplines during installation of PO and routine maintenance activities at the Kimberly Clark Facility in BeechIsland. Field EngineerG.A West-Mobile, ALDecember 2020 to January 2021assigned to 140 million Kimberly Clark expansion in Corinth Miss. Responsible for providing layout of building controls of foundations and utilities. Provide support of heavy equipment GPS controls. Field EngineerOverland Construction-Kings Mtn, NCApril 2020 to September 2020Provide layout of utilities, roadways, and components for the installation of a 200 acre solar field for Duke Power located in NC.Project SuperintendentPangea Group-Aiken, SCJanuary 2020 to April 2020Responsible to the Proj. Manager for direction of crafet personnel, sub-contractors, Attending Project Scheduling meeting, maintaining contact with client representatives for the Dept. of Energy. The project was a slab-on grade 400' by 80' for the storage of high level nuclear waste. Structure itself was of light weight steel and exterior of a high mil plastic. Shut down with Covid 19 in April. Field EngineerRobinson Constructors-Bloomfield, MOSeptember 2019 to December 2019Bloomfield, MOQuality Professional - Responsible for inspections (Pre-Pour) of embedded items, reenforcment, formwork, dimenions. Also provided a dual functuon as Field Engineer providing layout for crafts. Setting of equipment, structual steel, and miscellaneous items. Field EngineerDavis Erectors-Greenville, SCDecember 2018 to April 2019Davis Erectors primarily work to erect and assemble pre-cast structures. Primarily the structures are parking garages, included are stadiums and buildings as well. I provided the layout of columns and metro walls as well as other pre-cast item to guarrantee an accurate layout of the componets. an accuracy of .06' for overall placment.QC/Survey Manager - The West Rock Pulp & Paper Mill Spirit Construction-West Point, VAApril 2018 to November 2018added two new wood yards as well as 900 feet of underground tunnel. My responsibilities were to review Design Specifications, Generate Pour Cards, Perform Inspections of rebar, formwork, and embedded items. Review layout documentation and as-built data by the Surveyor Field EngineerCA Murran & Sons-Savannah, GAJuly 2017 to April 2018Provide layout of 24" main Fire Protection Line as well as 8" & 10" branch lines to Hydrants and Roms. Provide elevations of Finish Grade for completion of installed components. Compile and submit as-built data. Elba IslandField EngineerFluor-Jenkinsville, SCJune 2015 to July 2017Survey Level 3 - Assigned to the MAB (Modular Assembly Building) providing datum lines and reference points for the fabrication of Nuclear Island Modules. Later assigned to various areas for periodic support of crafts for installation of embedded items or components prior to concrete placement. Field EngineerChicago Bridge and Iron-Waynesboro, GASeptember 2013 to April 20153 (Survey Dept.) - Assigned to Unit 4 during pre concrete placement of base matt. Provide vertical and horizontal layout of rebar, embeds, and embedded piping. After concrete placement assigned to Modular Assembly Building assisting and providing vertical and horizontal datum lines for Reactor Structural Assemblies.Sr. Field EngineerBaker Concrete Construction-Aiken, SCNovember 2008 to May 2013Field Engineer2008 to 2010transferred to P-Reactor April of 2010. Reassigned to WSB in August of 2010 during the major phases of concrete placements. Promoted to a position of Project Engineer responsible for the Work Control Department and to generate, revise, and maintain work packages. Survey Field EngineerWelbro Construction Services-Maitland, FLMay 2004 to March 2006Assigned to Shingle Creek Convention Center - a heavy tilt up construction project consisting of 900,000 sq ft of convention center and support facilities. Also, worked Light House Keys and Fairfield Resort at Disney World. Welbro recognized the need for Field Engineers where I taught Blue Print Reading, Geometry, and Survey Field Engineering. Note: Voluntarily Quit to care for my brother terminally ill with brain cancer. Reemployed after his passing in 2008. Sr. Survey Field EngineerHardin Construction Co-Atlanta, GAApril 2003 to May 2004Assigned to a joint venture of Hardin and Ledcor for the construction of a condominium complex consisting of a 18 and 15 story building(s) with a four story parking garage. Foundations termed as deep foundations consisting of trimy pipe caissons, elevated slabs were post tensioned. Concrete Field SuperintendentBell Technologies Inc-New York, NYFebruary 2002 to November 2002Assigned to Tritium Extraction Facility a NQA1 project where I was responsible for directing craft personnel during construction, ordering equipment and materials. Review and implementing of design documents, procedures, and specifications. Performing Safety walk-downs, inspection of completed work, identifying design deficiencies.Maintenance MechanicBaxley Mechanical Inc-North Augusta, SCMarch 2001 to February 2002Primarily employed at Pactiv Plant in Beech Island where I performed routine maintenance on manufacturing systems. Fabricate sheet metal ductwork for HVAC systems, vacuum piping, extruders, install screw pipe, pipe insulation, and fabrication of supports and hangers. Field EngineerM.B. Kahn Construction Co-Columbia, SCSeptember 1998 to April 2000Assigned to SMI rolling mill where Kahn installed a new melter and completed phases of the new rolling mill with inclusion of a warehouse. Assigned to the new John Deere plant considered as big box construction. Later assigned to the Kimberly Clark wet tissue expansion in Beech Island. Final project for Kahn was the Owens Project in Chester.Party ChiefBesson & Gore PLS-Augusta, GAApril 1996 to September 1998Primarily hired to work the expansion of the Augusta Mall. The expansion included the addition of Dillards, roadway around the mall, overflow parking areas and new storm drain systems. Worked the revetment project for the Corp of Engineers on the Savannah River. Performed topographical and route surveying. SuperintendentA. J. Kellos Construction Co-Martinez, GAJuly 1995 to April 1996Assigned to the VA Hospital for the demolition of the cafeteria and upgrade to the food court. Responsible to the Project Manager for supervising sub-contractors and craft personnel. Interacting with Engineering Dept.Construction EngineerBechtel Savannah River Inc-Aiken, SCApril 1992 to June 1995Assigned to E&PD. S- Area I was assigned to the Electrical Engineering Department for the task of resolving 154 NCR's after Cold Water Runs. Submitted Engineering responses through walk-downs of the supports or affected components. Later assisted in the Electrical Support Cookbook. Generated Work Packages and performed as a Electrical Construction Engineer for assigned DCF's. Assigned to F- Area to Configuration Management for the implementation of the new bar coding system of installed systems and components. On loan to Westinghouse for the start up of RTF, resolving post construction issues. Field EngineerM.K. Ferguson-Aiken, SCAugust 1984 to April 1992Assigned to S221 for one year during construction of the base matte, installation of cell liners, and process piping and nozzles. Later assigned the S210, Bulk Frit building, Low Point Pump Pit, and Cold Chemical Feeds. Assigned to RTF during the mechanical phase for installation of glove boxes, process piping, and HVAC. Upon completion of RTF I returned to S-Area where I was promoted to Civil Field Engineer for completion of mechanical and process supports. In 1989 I went on loan to BSRI as a Construction Engineer for Reactor Restart. Assigned to L-Area for Disassembly HVAC upgrades and K -Area Detention Basin. Reassigned to P-Reactor on second shift for the seismic upgrades of the Control Room and Stack Area. Skills Project engineering NEC Primavera Electrical engineering Electrical experience ASME codes & standards Geometry Mechanical knowledge Data collection Analysis skills Quality control |