| 20,000+ Fresh Resumes Monthly | |
|
|
| Related Resumes Project Management Electrical Engineer Southfield, MI Account Manager Project Birmingham, MI Onsite Senior Project Manager Romulus, MI Project Engineer, Automation, PLC programming, Electrical, Proce Commerce, MI Project Manager Customer Service Dearborn, MI Project Manager Management Plymouth, MI Construction Manager Project Management Grosse Pointe Woods, MI |
| Click here or scroll down to respond to this candidateCandidate's Name
PHONE NUMBER AVAILABLE/PHONE NUMBER AVAILABLEEmail: EMAIL AVAILABLEEDUCATION:Master of Science in Manufacturing Engineering (MSME)Lawrence Technological University, Southfield, MIBachelor of Science in Electrical Engineering (BSEE)Lawrence Technological University, Southfield, MIProfessional Experience:Senior Electrical Engineer/Project Manager (6/21 to7/22)Roush Industries/Performance Driven Workplace, Livonia, MIMade quality decisions (accepted or rejected) based on provided quantitative outlines, performed routine quality inspections on industrial and commercial items while implementing 5S protocol, monitored operations output and associated production standards, maintained and organized all records, documentation and other files associated with quality engineering and inspection tasks, removed and documented all rejected product samples in the appropriate log books.Distribution Project Manager (8/00 to 12/2020)Detroit Media Partnership (Detroit Free Press and Detroit News), Detroit, MIManaged a regional-wide sales force in metro-Detroit, where I was responsible for hiring, training and placing employees at locations to yield the highest sells.Electrical Design Release Engineer (7/01 to 4/03)Exemplar Manufacturing Company/Aerotek Livonia, MIBased on the companys Product Directional Letter (PDL) that outlines future vehicle changes, responsibilities entailed the design of the vehicles electrical wire harnesses, power distribution and electrical components along with supplier integration of automotive parts and schematic revisions. I released parts and services into Fords WERS software system thus denoting cost and timing for company approval. Supported Exemplar wiring launches in Mexico that involved demonstrating to line workers the correct routing of various harnesses. Conducted end-of-line testing and diagnostics to determine and resolve any wiring issues. Supported all prototype build events to ascertain & correct any problems that may impede assembly in the final stages of production launch.Lead Engineer-Material Cost Reduction (MCR) (9/98 to 8/00)Ford Motor Company/Aerotek, Dearborn, MIManaged the electrical team that consisted of Core Engineering, Wixom Assembly Plant-PVT & Vehicle Operations (VO), suppliers, buyers and cost estimators to generate cost saving opportunities for items such as wiring, body modules, batteries, connectors, alternators, etc. The savings were generated via Total Cost Management methods, Value Analysis (VA/VE) and brainstorming workshops. Responsibility, also, entailed: tracking average cost vs. target, performing prototype investigation through plant trials, design validation and durability test to confirm cost reductions saved money without degradation of component or vehicle quality, document engineering changes, release parts into WERS and ensure assembly plant implementation timing. |