Quantcast

Safety Manager Environmental Resume Jack...
Resumes | Register

Candidate Information
Title Safety Manager Environmental
Target Location US-FL-Jacksonville
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes
Click here or scroll down to respond to this candidate
T I M O T H Y P A R R, C H S T Street Address
PHONE NUMBER AVAILABLEEMAIL AVAILABLEExperience: 30 YearsEducation: University of Texas  Austin and Dallas, Various Safety Electives University of Florida, Various Safety Electives University of South Florida, Various Safety Electives Specialized Training & Certifications: CHST, CHST-C2671 EM 385-1-1 40 Hour EM 385-1-1 8 Hour Refresher Environmental Compliance Assessment, Training and Tracking System (ECATTS) First Aid/CPR/AED Train the Trainer Qualified Storm Water Pollution Management Inspector (SWPPP) MSHA Instructor OSHA InstructorKey Project Experience:SOF Watercraft Maintenance Facility  Key West, FL Project Description: Construction of a new maintenance facility for the repair of SOF hard-hulled and soft- hulled watercraft, including electrical, mechanical, plumbing, and fire protection utilities. Work includes demolition of the existing bunker, KW-800, which is currently used as a climate-controlled exercise facility. It also includes construction of a new vehicular entrance ramp and exit ramp to the maintenance facility. Role & Responsibilities: SSHO/Environmental Manager/Trainer. Perform risk identification and management. Periodic training of employees. Conduct, review and recommend approval/disapproval of the construction contractors safety/accident prevention plans and document safety, SWPP, environmental inspections and training. Maintain proper construction contract document files according to NAVFAC standards.Dates worked on project: January 2022  January 2023 Value: $16MP009 Police Station and Emergency Operations Center  Jacksonville, FL Project Description: Construction of a new two-story policy station and EOC facility within MCSF Blount Island. Facility construction consists of masonry with a metal roof, special foundations and emergency power circuits and will feature sustainable technologies. Role & Responsibilities: Safety Manager/SSHO/Environmental Manager. Perform site safety and environmental inspections and reports. Training as necessary for progression of work. Compliance of NAVFAC/EM385-1-1 & company regulations. Dates worked on project: February 2021  December 2021 Value: $10MT I M O T H Y P A R R, C H S T 3455 Brahma Bull Cir N., Jacksonville, FLORIDA 32226 PHONE NUMBER AVAILABLEEMAIL AVAILABLESaint Vincents Southside Hospital Exterior Faade Restoration  Jacksonville, FL Project Description: The projects scope includes the demolition of 148,500 SF of existing precast skin, replaced with an insulated metal panel system over a new vapor barrier, and all new hurricane-rated windows and HVAC louvers. The project also includes interior modifications at each window opening and envelope improvements at two medical office buildings on campus. Role & Responsibilities: Project Safety Manager/Environmental Manager/Trainer. Oversee the promotion of a safe work environment while creating a culture that maintains a safe, healthy, and injury/incident-free work site. Conduct and document safety, SWP3, environmental inspections, and training for compliance with Gilbane Safety Manual. Perform risk identification to management, incident reporting and investigations. Dates worked on project: December 2020  November 2021 Value:Wharf Echo Heavy Weather Moorings - Mayport Naval Station  Jacksonville, FL Project Description: Drilling and installing of 120 x 10 rebar cages. Deposing of hazardous waste from military base.Role & Responsibilities: Safety Officer/SSHO/ Environmental Manager/Trainer. Periodic training of employees. Conduct, review and recommend approval/disapproval of the construction contractors safety/accident prevention plans and document safety, SWPPP, & environmental inspections and training.Dates worked on project: June 2019  October 2020Value: $8.5MShoreline Stabilization of Area 1, MCSF Blount Island  Jacksonville, FL Project Description: Project included clearing and grubbing, excavation, security fencing and relocation, steel sheet pile bulkhead wall with tie-back system, geotextile fabric, crushed aggregate road, backfill and compaction, sodding, planting and establishment of trees and other work incidental to project completion. Role & Responsibilities: Safety Officer/SSHO/ Environmental Manager/Trainer. Perform risk identification and management, incident reporting and investigations. Periodic training of employees. Conduct, review and recommend approval/disapproval of the construction contractors safety/accident prevention plans and document safety, SWPPP and environmental inspections and training. Dates worked on project: March 2018  May 2019Value: $11MI-75 Florida Turnpike Wildwood Interchange Design-Build  Wildwood, FL Project Description: Project included widening from two to three lane interstate with new construction of four complete bridges and three fly-over bridges/ramps. Role & Responsibilities: Safety Manager/Trainer. Provide training, site inspection, progress meetings, ensure policies and procedures are followed on job sites. Dates worked on project: June 2016  December 2017 Value: $130MDFW Terminal A Renovation  Dallas, TXProject Description: Expanded existing retail space, passenger waiting area, jetway, installed terrazzo flooring. Role & Responsibilities: Safety Manager. Oversee mechanical subcontract work consisting of demolition and renovation of airport terminal.Dates worked on project: November 2013  April 2014 Value: $15MT I M O T H Y P A R R, C H S T 3455 Brahma Bull Cir N., Jacksonville, FLORIDA 32226 PHONE NUMBER AVAILABLEEMAIL AVAILABLECarswell Naval Air Station - Fort Worth, TXProject Description: Construction of a new Marine administration building, hangar refurbish, parking garage, air traffic control tower. Work comprised of civil work including grading, wet/dry utility installation, soils testing/ sampling, earthwork, dewatering. All phases related to new building construction i.e., plumbing, electrical, mechanical, drywall, roofing etc. Role & Responsibilities: Division Safety Manager/Trainer. Oversee various subcontractors relating from underground utilities to top of structure. Provided training, site inspection and progress meetings to ensure policies and procedures are followed on job site. Dates worked on project: June 2007  November 2009 Value: $46MArmy Medical Reserve Training Facility  Seagoville, TX Project Description: Work comprised of civil work including grading, utility installation, soils testing/sampling, earthwork, de-watering and water suppression vault installation. All phases related to new building construction i.e., plumbing, electrical, mechanical, drywall, roofing etc. Role & Responsibilities: Division Safety Manager/Trainer. Provided training, site inspections and progress meetings to ensure policies and procedures are followed on job site. Dates worked on project: June 2007  November 2009 Value: $20MToyota Truck Plant  San Antonio, TXProject Description: Work included earthwork, underground wet and dry utilities, reuse water treatment plant, process equipment and plant building construction. Wastewater treatment plant included concrete structures, process piping, equipment, electrical, controls and all related work. Role & Responsibilities: Project Safety Manager. Provided training, site inspections and progress meetings to ensure policies and procedures are followed on job site. Dates worked on project: July 2010  November 2010 Value: $60MTexas Instruments  Richardson, TXProject Description: Grading, Infrastructure, Underground utilities (water, gas, storm etc.), paving and curb/gutter for Texas Instruments plant improvement project. Included grading and installation of retention ponds for stormwater and landscaping.Role & Responsibilities: Project Safety Manager Safety/Trainer and Medical Supervisor. Provided training, site inspections and progress meetings to ensure policies and procedures are followed on job site. Performed preemployment and random drug screening. Dates worked on project: July 2004  June 2005Value: $35MSeminole Indian Hard Rock Caf Hotel and Casino  Tampa and Hollywood, FL Project Description: Project involved new construction of a 14-story hotel {Tampa} and a 12-story hotel{Hollywood} both with restaurants; a 4-story parking garage, a 5-story parking garage; a new casino and a new casino built around an existing and operating casino. Role & Responsibilities: Project Safety Coordinator Safety. Safety representative for the Indian Council.Dates worked on project: January  2002  April 2003 Value: $180MT I M O T H Y P A R R, C H S T 3455 Brahma Bull Cir N., Jacksonville, FLORIDA 32226 PHONE NUMBER AVAILABLEEMAIL AVAILABLEWestern Zirconium Subsurface Barrier Wall, Work Pad Construction and Soil Stabilization  Ogden, UT Project Description: Construction of a 10,000 linear foot subsurface barrier wall, dike, working pad and access road around multiple wastewater evaporation ponds to satisfy requirements of the RCRA corrective action process for the State of Utah. The work pad was stabilized by soil-cement mixing 30% of the subsurface soils to a maximum depth of 5 feet using a cutter wheel. Grout mix design proportions had to be continually monitored and adjusted when necessary to account for soil contaminants, which affected the unconfined compressive strength of the in-situ soil-crete mixture. The project also included rerouting of existing underground utilities which required coordination not to avoid service interruption for more than 3 hours. Constant monitoring of soil and air to ensure proper PPE was utilized depending on conditions.Role & Responsibilities: Regional Health and Safety Manager/Trainer. Provided training, site inspections and progress meetings to ensure policies and procedures are followed on job site. Performed random drug screening.Dates worked on project: May 2012  November 2013Value: $40M100-Year Levee Remediation, Cutoff Wall Improvements  Dallas, TX. Project Description: Construction consisted of the installation of cutoff walls along the east and west levees of the Trinity River to reduce under-seepage and to meet documented USACE seepage criteria for the 100 years of flood control. The length of the cutoff walls amounted to approximately 15,700 linear feet along the east levee and 2,600 linear feet along the west levee using a soil -bentonite (s-b) or cement-bentonite (c-b) backfill. In areas of crossing utilities, windows or gaps were jet grouted after the cutoff wall installations to reduce potential damage to existing utilities, while providing cutoff to address seepage. The cutoff walls totaled more than 800,000 square feet. Cutoff wall excavated soils or backfill spoils were compacted into areas within the floodway where existing riverside maintenance roads have sunken below the adjacent floodway floor ground surface. Work also included the installation of thirteen (13) pairs of inclinometer and piezometers to monitor ground and subsurface conditions during cutoff wall construction. Additional features of work included the rehabilitation of three(3) outfall structures, 5,000 linear feet of a 16-foot-wide maintenance path, utility location, wetlands mitigation, and final restoration.Role & Responsibilities: Regional Health and Safety Manager/Trainer. Provided training, site inspections and progress meetings to ensure policies and procedures are followed on job site. Performed random drug screening.Dates worked on project: May 2012  November 2013Value: $22MIBWC - Presidio Lower Levee Remediation  Presidio, TX. Project Description: This project is the second phase of a flood control program to strengthen and repair the existing levee system from effects of the flooding events of August 2008. This levee protects the lower end of the Presidio and Ojinaga Valley on the United States side of the Rio Grande River which includes nearly 5,200 acres of agricultural and farming areas. The scope of work includes the construction of 25,500-LF of a Toe Drain, 3,420-LF of soil-bentonite cutoff wall(206,000 SF) to a maximum depth of 65 ft. with a maximum permeability of 1.0 x 10-7 cm/sec, placement of over 120,000-cy of earthen fill to repair levee failures and severe erosion, placement of 17,500 cubic yards of riprap, placement of 54,000-sy of flex-base, irrigation gate-well restoration and final restoration.T I M O T H Y P A R R, C H S T 3455 Brahma Bull Cir N., Jacksonville, FLORIDA 32226 PHONE NUMBER AVAILABLEEMAIL AVAILABLERole & Responsibilities: Regional Health and Safety Manager/Trainer. Provided training, site inspections and progress meetings to ensure policies and procedures are followed on job site. Performed random drug screening.Dates worked on project: May 2012  November 2013Value: $20MDART Orange Line - Irving, TX.Project Description: Maintained positive control and accountability for safety performance of project. Conducted and documented daily safety inspections, conducted and documented weekly safety tours with supervisors, foremen and select craft employees. Responsible for compliance with DART Safety Manual, contract specifications and company safety policies and programs on project and performs risk identification and management, incident reporting and investigations.Role & Responsibilities: Project Safety Manager. Provided training, site inspections and progress meetings to ensure policies and procedures are followed on job site Dates worked on project: December 2010 - May 2012Value: $800MBelton Lake Dam Renovation  Belton, TX.Project Description: Worked inside the dam and gatehouse consisted of a wet environment and access via small boats over the spillway and through the tunnel to the gates termination point of the dam. Work necessitates the use of fall protection; air monitors; personal flotation devices; waders; welding (hot work permits completed); communication via hand-held radios; cranes (222 Manitowoc 100-ton crawler and overhead cranes) used in moving equipment; and 28-to 30-ton flood control gates. Role & Responsibilities: Project Safety Manager/Trainer. Conducted and documented daily safety inspections. Responsible for compliance with the USACE EM 385-1-1 Safety Manual. Performed risk identification and management, incident reporting, and investigations.Dates worked on project: December 2010 - May 2012Value: $11MEagle Pass Border Fence - Eagle Pass, TX.Project Description: Project involving earthwork, concrete work and erection for international border wall with footer & border fencing posts, panels and gates, with demo of four existing abandoned houses and two stores.Role & Responsibilities: Project Safety Manager. Conducted and documented daily safety inspections, was responsible for compliance with the USACE EM 385-1-1 Safety Manual. Performs risk identification and management, incident reporting, and investigations. Dates worked on project: December 2010 - May 2012Value: $5MWest Bank Vicinity -09a Levee & Pump Station - New Orleans, LA. Project Description: Project involving mass earthwork for levee and pump station with demo of existing abandoned FEMA trailer park.Role & Responsibilities: Project Safety Manager. Conducted and documented daily safety inspections, was responsible for compliance with the USACE EM 385-1-1 Safety Manual. Performs risk identification and management, incident reporting, and investigations. Dates worked on project: December 2010 - May 2012T I M O T H Y P A R R, C H S T 3455 Brahma Bull Cir N., Jacksonville, FLORIDA 32226 PHONE NUMBER AVAILABLEEMAIL AVAILABLEValue: $34MHurricane Ike Debris Cleanup and Infrastructure/Levee Repairs-Crystal Beach, TX. Project Description: Project involved mass earthwork and cleanup of community post hurricane from Placement Areas along Galveston Inter-coastal Water Way for the US Army Corps of Engineers. Also included rebuild of damaged levee. Role & Responsibilities: Project Safety Manager. Responsible for crews health, welfare and hydration.Dates worked on project: April 2010  July 2010Value: $16MProgress Energy - FL, NC, VAOrlando Utility Commission - Orlando, FLSouthern Power - Athens, GAProject Description: Installation of water and process piping, wastewater piping and associated utilities for existing nuclear & coal burning power plants. Work included new infrastructure and utilities, as well as the maintenance of existing pipe, valves and equipment, lead and asbestos abatement. Role & Responsibilities: Regional Safety Manager/Trainer. Provided training, site inspections and progress meetings to ensure policies and procedures are followed on job site with supervisors, foremen and craft employees Dates worked on project: April 2005  April 2007Value: $100K - $3MEmployment History2020  2023 SSHO/TrainerEG-DesignBuild, LLCKey West, FL2018  2019 Safety Officer/SSHO/TrainerRush Marine, LLCJacksonville, FL2018 Safety Director/TrainerBurgess Civil, LLC., 2018Tampa, FL2017 Safety Manager/TrainerMiddlesex Construction, Inc.Orlando, FL2015 - 2017 Safety Supervisor/TrainerOrion Marine Construction, Inc.Tampa, FL2014 Area Health & Safety Manager/TrainerHayward BakerTampa, FLT I M O T H Y P A R R, C H S T 3455 Brahma Bull Cir N., Jacksonville, FLORIDA 32226 PHONE NUMBER AVAILABLEEMAIL AVAILABLE2012  2013 Regional Health & Safety Manager/Trainer Magnus Pacific, LLCRoseville, CA2010  2012 Project Safety Manager/TrainerKiewit InfrastructureDallas, TX2010 Project Safety Manager/TrainerThe Conti GroupChambersburg, PA2009 Project Safety Manager/TrainerKEAR Civil Corp.Hobbs, NM2007  2009 Division Safety Manager/TrainerWalton ConstructionDallas, TX2005  2007 Regional Safety Manager/TrainerBrock Specialty ServicesHomosassa Springs, FL

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise