| 20,000+ Fresh Resumes Monthly | |
|
|
| Related Resumes Information Technology Power Bi Jacksonville, FL Information Technology entry-level student Jacksonville, FL Front Desk Entry-Level Middleburg, FL Power Bi Sql Server, SQL Developer, ETL Engineer, Data Architect Jacksonville, FL Customer Service High Level Gainesville, FL Solar Power Pipefitter Jacksonville, FL Project Management Senior Level Jacksonville, FL |
| Click here or scroll down to respond to this candidateCandidate's Name
Hollywood, FL Street Address
EMAIL AVAILABLEPHONE NUMBER AVAILABLETo continue to move my Street Address + year telecommunications career forward in a positive way by doing my best to support a larger team.Authorized to work in the US for any employerWork ExperienceLevel 4 DC Power TechnicianNational Power - United StatesMay 2018 to November 2022Job duties included the installation of fuse alarm panels (FAPS), BDCBBs, iron work, fiber duct, grounding, etc. I also was responsible for customer coordination for any issues related to access, installation layout, quality audits, hot cuts and any job completion documents requested. Primary customer was Comcast. Level 4 DC Power Installer3G Network Systems Services - US NE-SE Regions / Barbados April 2015 to November 2017Job duties included the installation of a wide range of DC power distribution equipment and batteries systems. Equipment manufacturers included GE, Emerson and Alpha. Primary customers were at&t, Verizon, Comcast, Globenet and Flow Communications (Barbados).Alpha TechnologiesProject ManagerWindstream Communications - US Mid-West and NE-SE Regions January 2013 to April 2015Job duties included the coordination between Alpha, customers engineering teams and outside vendors in the installation of Alpha Technologies DC power equipment of various sizes. Primary customer I worked with was Windstream Communications.Level 4 DC Power InstallerDataStream - SE FloridaJanuary 2012 to December 2012Job duties included the installation of DC power distribution equipment and battery systems in both indoor and outdoor cell site platforms. I was part of a2-3 man crew not a lead. Installation included the modification/addition of AC power circuits for new rectifiers along with DC distribution circuits to all cell site equipment on site. Equipment manufacturers were GE and Alpha. Primary customers were T-Mobile and at&t. Level 4 DC Power InstallerAFL Network Services - US / SE RegionJanuary 2010 to January 2012Job duties included the installation of DC power distribution equipment and battery systems in central office environments typically part of a 2-5 man crew, 50% as a lead and 50% not. This included the addition of PBDs, rectifiers bays, BDFB/BDCBBs, battery strings/stands, battery test records (standard at&t), CO grounding systems, ironwork (zone 1) opening/closing wall and floor penetrations with 3M and Hilti fire stop systems, controller programming/software upgrades, alarming through customer network and hot cuts/transition work. Equipment manufacturer installed was Lineage. Primary customer was at&t wireline. DCPRO PowercomLevel 3-4 DC Power InstallerAugust 2008-December 2009/ US / Western Region including HI As a lead my job duties included managing a crew of up to 10 installers, working with engineering, project managers and the customer to meet installation progress dates/expectations. Installation included the addition DC power distribution equipment, and battery systems in a central office environment. This included the addition of two 10,000-amp DC bus duct systems, PBDs, rectifiers bays, BDFB/BDCBBs, inverters, battery strings/stands, spill containment systems, battery test records ( limited Midtronics exp.), ironwork (zone 4), CO grounding systems, opening/closing wall penetrations with 3M fire stop system, controller programming and alarming through customer network. Equipment manufacturer wasLineage. Primary customers were Verizon Wireless and Qwest. Tyco ElectronicsLevel 2-3 DC Power InstallerApril 2001-July 2007/ US / NE SE Regions / Puerto Rico Job duties included the installation of DC power distribution equipment, and battery systems in central office and cell site environments. This included the addition of one 10,000 amp DC bus duct system, PBDs, rectifiers bays,BDFB/BDCBBs, inverters, battery strings/stands (flooded and VRLA), spill containment systems, battery test records (limited Midtronics exp.), ironwork(zone 1-3), CO grounding systems, opening/closing wall and floor penetrations with 3M fire stop system, controller programming, alarming through customer network and hot cuts/transition work. Equipment manufacturer was Tyco Electronics/Lineage. Primary customers were VZW, Verizon, Verizon GNI, BellSouth, at&t long distance, Cingular and Level 3 Communications.Level 1-2 DC Power InstallerLucent Technologies - US / SE FloridaJuly 1999 to April 2001Job duties included the installation of DC power distribution equipment, and battery systems in central office environments. This included pulling and sewing cable, the addition of a PBDs, rectifiers (ferro and switch mode), BDFBs, inverters, battery strings/stands (flooded-round cells), spill containment, cable terminations, battery test records, transition work, ironwork (zone 1), CO grounding systems, fiber duct, wire wrapping and alarming through the customers network. Equipment manufacturer was at&t/Lucent. Primary customer was BellSouth.Electrician (Journeymen)Territo Electric Inc. - US / FloridaJanuary 1995 to December 1999Standard electrical installations in both residential and commercial environments. Electrician/ApprenticeEnnen Electric Inc. - US / FloridaJanuary 1990 to December 1995Standard electrical installations in both residential and commercial environments. EducationStandard high school diplomaSheridan Technical CollegeJanuary 2018 to January 2018Skills Ask Your/Supplier Awareness for at&t volunteer work Local food bank in Broward County Florida Microsoft Word Microsoft Outlook Microsoft Excel Microsoft Power Point Experience as a lead in the installation of DC power distribution equipment, batteries (flooded and VRLA), spill containment systems, grounding, ironwork, controller programming and alarming in both the +24V and -48V platforms located in cell sites, central office and data center environments. I also have 9 years of AC electrical experience in the residential and commercial areas. Crew management Adobe Acrobat Telecommunication Data center experience Project management Supervising experience Construction Computer networking Customer serviceCertifications and LicensesAsk Yourself/Supplier Awarness at&tJanuary 2023 to January 2024Driver's LicenseJune 2023 to June 2027OSHA 10June 2023 to June 2024AssessmentsAttention to detail ProficientDecember 2022Identifying differences in materials, following instructions, and detecting details among distracting informationFull results: ProficientMechanical knowledge ProficientDecember 2022Understanding and applying mechanical concepts and processes Full results: ProficientCustomer focus & orientation ProficientDecember 2022Responding to customer situations with sensitivity Full results: ProficientBasic maintenance and repair ProficientDecember 2022Performing basic repairs and maintenance for apartment complexes, office buildings, and other facilitiesFull results: ProficientIndeed Assessments provides skills tests that are not indicative of a license or certification, or continued development in any professional field. |