Quantcast

Quality Control Project Manager Resume W...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Quality Control Project Manager
Target Location US-DC-Washington
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes

Project Management Quality Control Baltimore, MD

Project Managers Quality Control District Heights, MD

Quality Control Project Management Arlington, VA

Project Management, Systems Engineer, Testing,Quality and Acquis Upper Marlboro, MD

Project Management Quality Assurance Baltimore, MD

Financial Analyst, Government Contracting, project control colla Sterling, VA

Quality Assurance Project Management Reston, VA

Click here or scroll down to respond to this candidate
Candidate's Name
west columbia, sc. Street Address
EMAIL AVAILABLEPHONE NUMBER AVAILABLESuperintendent/QC Manager-Four TribesApril Street Address  to PresentFort Jackson,S.C.1) Quality Control Reports Daily2) Plan and layout projects3) Plan projects with crew4) Schedule work with sub contractors5) Write AHA'S and safety procedures6) Daily RMS reports7) Order material8) QC all work daily9) Train new employees10) Work with Project manager on progress11) Payroll12) SSHOElectrical Superentendent/QC Manager-IESSept. 2019 to April 20211) QC daily reports2) Monthly site meetings3) Plan and layout daily work4) Make nessary changes to prints5) Schedule inspections6) Underground - transformers- lighting7) Meter panels and balance loads8) Site daily reports9) Material list10) Electrical Engineer11) QC electrical, HVAC, fire alarm and data12) Trouble shoot13) Run 4 projects at one time14) SSHOElectrical Superintendent/QC manager Fordham Electric Jan. 2019 - Aug. 2019 plan and layout project make necessary changes to prints schedule subcontractors fill out daily reports, send to main office make material orders SSHO check with the installation of electrical, hvac, fire alarm and data Quality control trouble shoot meet with general contractor on changesElectrical Superintendent/QC Mamager -- I.E.S. March 2018 - Jan. 2019 plan and layout project schedule subcontractors schedule SCE&G schedule inspections payroll, daily reports, order material Electrical Engineer SSHO quality control, trouble shoot start up hvac units. repair sheet rock.connect hot water tanks, start up heaters. install switch gears, panels, lighting control, fire alarm. Maintance --- Greenbriar units Aug 2017 - March 2018 Quality Conntrol Manager maintain units, 23 buildings, 2 pools and laundry buildings given work orders through the day, they will contain, plumbing, electrical, hvac, painting, sheetrock, carpet, floor tile, appliances... etc. install new air units, run lines, install freon and set thermo stats. repair units if possible. repair or replace hot water tanks, water lines. kitchen sinks install and repair. toilet replace or repair. repair or replace cabinets. wall trimming repaired or replaced. repair or replace doors, locks...etc repair all electrical, panels, fixtures, lights and outlets. repair sheetrock, paint repair any floors, carpet tile...etc repair or replace appliances, frig, ovens, garbage disposals, washers and dryers repair or replace data systems at office, reprogram maintaine pools, ph, salt, pumps, cleaningDirector of Operations/QC Manager -- Rosemark Commercial Management Services Sept 2015 - Aug 2017 Manage everything in 68 buildings replace or repair all hvac, install new units, install freon, progran controls to motors and system. trouble shoot chillers and reprogram. plumbing-- repair or replace all equipment. floor drains repair. bathroom equipment, kitchen plumbing, barracks plumbing. electrical-- replace repair all electrical eqipment. panels, motors, fixtures. kitchen equipment-- repair or replace mixers, oven, grills, freezers and refer units. ice machines. any sheet rock or painting repairs masonary repair. brick, concrete SSHO fire alarm. repair or replace panels, devices. reprogram. install new data systems or repair anything that pertains to building, had to repair or replace follow up with corps of engineers on all repairs perform quality control QC daily reports Meet with Project manager for weekly progresd.Lead Man -- Intergrated Electric May 2015 - Aug 2015 install ridged and emt conduit istall conveyor belt photo eyes, limit switches pull data cables to and istall 500 vfd's. dress up vfd's and plc's. program install and program exray machines trouble shootSupervisor/QC Manager - MSI june 2014 - may 2015 layout and perform projects engineer changes install plc's and run data cable. daily reports, payroll SSHO install hvac units, electrical panels, data and low voltage. program. connect new chillers and programSupervisor - Kudzu Feb 2014 - june 2014 install hvac units, run control cables and program for Johnson controls. install chillers, motors, plc's program. install new hvac controls for water treatment plants and chillers for air force in charleston. install any electrivcal needed for equipment to operate. Berg Electric - Quality Control Manager- Safety Director Oct 2012 - Dec 2013 install all electrical, fire alarm and data controls, lighting controls and hvac controls. Pumps for plumbing perform inspections and prepare for corps of engineers inspections. quality control, make sure proper material is used and installed correctly. SSHO design lighting control and lighting. write AHA'S for corps of engineersSenior Project Manager/QC Manager - I.E.I. Jan 2012 - Nov 2012 write government submittals write aha's for corps of engineers do work for army top secret project. over see all projects company had design new fire alarm ststem for Fort Jackson hospital install hvac and program SSHO corps of engineers pulled me off this project and put me on Berg electric project Superintendent - Lewis Electrical Mar 2011 - Dec 2011 layout project, electrical, fire alarm, security,and lighting control payroll, ordering material, train employees SSHO design controls 30 vfd's, install and programSuperintendent /QC Manager- Emory Electric Jun 2010 - Mar 2011 layout out project SSHO payroll, order material, daily reports fire alarm and security systems install and program. lighting control systems installed and programed install all electrical systems, panels, transformers Foreman - CLP Nov 2008 - Jun 2010 install fire alarm systems in 2 new buildings at allen university. run conduit, pull circuits, install devices and program install and trouble shoot electrical systems, lighting control Project Manager/Superintendent - Fountain Jan 2006 - Feb 2008 2 tower 7 floor high end condos with 8 floor parking deck with party deck layout complete project, electrical, hvac, plumbing, paiting, wood floors, carpet, fire alarm electrical- designed, installed. lighting controls SSHO install security system and program do repairs to hvac, plumbing, sheetrock, floors, appliances, fire alarm. security systems payroll, daily reports, p and l reports. safety reports. make changes on condos with the request of owners Electrical Engineer Mr. fountain wanted 10% profit, he received 12%Associate Degree in Electrical EngineeringOsha 30Osha Confined SpacesCorps of Engineers Construction Quality Management For Contractors- Certificate Certified Electrician DiplomaSupervisor Certificatecomputer savy

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise