| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateResumeCandidate's Name
General Superintendent/SuperintendentStreet Address La Costa Ct..Sanford Fl. Street Address
EMAIL AVAILABLEPHONE NUMBER AVAILABLESummary of Experience and Profile:Over 35 years of field experience: Major Highway, Airport and Earthwork experienceConcrete/Asphalt Paving experience,Heavy Earthwork operations, major site developmentsUnderground Utilities, RCP large diameter pipe,Major Earthwork Projects California/Florida/Louisiana/GeorgiaBridge and overpass experience, Calif, Florida, Miss. and La.De-watering experience, Florida, Georgia Louisiana and AlabamaDOT experienceP-3, Excel,MSE Walls & Wire WallEstimating RoadwayI Currently work for Mercon Construction, at Universal StudiosDec 2021 to Oct 15th 2023 present Masci ConstructionRoadway Superintendent. Left Masci for personal reasonSGL Superintendent Sept 2017 Nov-2021Earthwork/Storm Water, Pond ExcavationJune 15th 2012 to Sept 2017D.OBrian Construction llc General Superintendent/EstimatingCompany specializes in Earthwork, White and Black Paving, Underground UtilitiesSmall Bridge and Bridge Deck RepairFeb 2011 to June 13th 2012JB James Baton Rouge LA Superintendent10,000,000 Street Remediation Project Chalmette LA.43,000,000 Major Bridge/ Hwy I-10 New OrleansEarthwork / Concrete Paving / UtilitiesJune 2008 to Dec 2010Ajax Paving Inc USA Project SuperintendentI-75 joint Venture ACCI & ACI 31 miles N/B & S/B 3 lane expansion 465 million US.Schedule Daily field crews and Paving operationDirect Plant operationTruckingMaterial procurementEarthwork and finish grade operations project relatedNov 2007 to May 2008GTC Transportation Overseas ExperienceAbu Dhabi, United Arab EmiratesSite ManagerSite Manager for a Major Highway and Bridge Project 29 million USJohn Carlo Inc.Feb, 2002 to Nov 2007Project Superintendent 2002 to 2004Project Manager / General Superintendent 2006 to late 2007Southwest Florida International AirportMarch 2002 to Aug 2005 113,000,000 US Fort Myers Fl.SuperintendentDirectly responsible 29 kilometers of 2,4 and 6 lane roadwayElevated roadway Bridge12,500ft new Runway9 new TaxiwaysTarmacs both Asphalt and concrete PavingAll earthwork activitiesAll Concrete related activities, curb, sidewalks, gutters, and all poured in place structuresEquipment procurement113-acre Parking lot13-acre Employee parking lotJohn Carlo Inc Airport Project Taxiway 6-24Aug 2005 to Dec 2005 Fort Myers, FloridaGeneral Superintendent 6.5 Million USAsphalt pavingLarge Diameter PipeEarthwork Sub-grade and finish grade operationsJohn Carlo Inc. Goodlette Frank ProjectJan 2006 to Aug 2006 Collier County Fl. USGeneral Superintendent/Site Manager 17,000,000 USI was asked to take over as Project Manager; the project had 68% of the revenue spent but only 28% of the project completed.John Carlo Inc.Aug 2006 to Nov 2007 Immokalee Rd & Rattlesnake HammockGeneral Superintendent Projects Fort Myers Fl. USA57,000,000 USBoth projects were Highway expansion and underground utility projects. The projects were considered by the municipality as the two most difficult projects to date forCollier County, FloridaSEC Engineering 91/210 freeway interchangeJanuary 1998 to Jan 2002 San Bernardino Ca. USSuperintendent 14.500,000 USoDirected field crews in paving operationsoBridge RepairoAsphalt and Concrete Paving experienceoUnderground utilitiesoStorm seweroEarthworkPRM Corporation Highway and Earthwork Projects1990 to Dec.1997Crew Leader, ForemanHeavy equipment operatorConcrete FinisherCurb and GutterPaving crew leaderEDUCATION:Continuing Education: Everglades University Boca Raton Fl. Construction ManagementAssociates of Arts, Cypress College, Cypress, CA. 1981 1983Graduated from Pacifica High School, Garden Grove, CA 1980Professional License: Held a General Contracting License B-1 (354271) 1985- 1989CertificationsIntermediate and Advanced M.O.T training Good through 2020 FloridaAdvanced Swift Mud Certifications, Florida 2020Confined SpaceFirst AidCPRRigging and ShoringElectrical SafetyHazardous wasteAsphalt Paving 1 & 2Haz. Mat. CertificationsOsha 10 hr & Osha 30 hr. |