| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateCandidate's Name
Princeton, NJ PHONE NUMBER AVAILABLE EMAIL AVAILABLESummaryVisionary Engineer with 15+ years of experience specializing in large capital projects. Experienced in both project management and construction management. Proficient in complete project execution including: capital budgeting, scheduling, procurement, installation specifications, logistic improvements, contractor negotiations, and construction site safety enforcement. Known for driving innovative and significant solutions for project challenges. Develops excellent relations with both external and internal customers.Work ExperienceOwner/PresidentJPS Cryogenics, Inc. - Princeton, NJFebruary 2006 to PresentEfficiently leading a team in the simultaneous installation of two liquid nitrogen plants in Central America by meticulous scheduling and driving excellent execution.Sold, dismantled, refurbished, upgraded, transported, and supervised the installation of an U.S. industrial gas facility to Africa. Increased plant production capacity by 15%.Dismantled, refurbished, and upgraded a 750 ton/day oxygen plant for a major international mining company. Savings were >$30,000,000 and one year duration versus a new plant.Chosen as the engineer to refurbish and upgrade an oxygen producing plant located inside of an oil refinery with extremely limited space. Added equipment to increase safety and production reliability within the allocated space.Innovatively dismantled two rectification columns to enable the transportation to new, limited access sites. The columns were successfully cut into sections and delivered without damage.Selected as preferred plant relocation project contractor for major industrial gas company in Canada due to safe and efficient project execution while reducing duration and costs.Selected to disassemble, move, and install a hydrogen reformer in the state of Mississippi.Auditor for comprehensive safety valve inspection project for a companys Northeast plant locations. Provided as built process and instrumentation schematics for these locations.Provided a pipeline plant relocation study. Delivered innovative re-installation plan at new site to utilize existing foundations and structure. Resulted in savings of over $300,000.Removed an oxygen plant from Syracuse, N.Y. to a site in Georgia for the New York Energy Company.Additional Work ExperienceDesigned and installed a companys first two carbon dioxide recovery and liquid production facilities. Introduced a new, state-of-the-art analytical system confirming the plants beverage grade product compliance.Successfully led engineering teams in constructing three air separation plant facilities, totaling $50,225,000. Specified and purchased all major mechanical and electrical equipment.Project Manager for a companys first on-site hydrogen reformer installation. Concurrent with the installation of a new gaseous pipeline /merchant liquid nitrogen plant.Implemented a novel approach to a plants foundations installation on a hazardous soil site (saving over $1,500,000). Designed the new plant layout to fit onto only 1.5 acres with automatic truck loading ability.EducationMaster of Arts in Business FinanceSeton Hall UniversityBachelor of Science in Mechanical EngineeringRutgers UniversityCore CompetenciesProject Management Team Leader of EngineersCapital Budgeting Cost Reduction StrategiesProject Risk Reduction Project SchedulingSite Safety Enforcement Innovative Problem-SolvingConstruction Management Financial Sensitivity AnalysisEquipment Installation Specifications Customer Liaison |