| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidatePage 1 of 3Candidate's Name
1472 Dobson Square North Columbus, Ohio 43229. +1 614 779 8886. EMAIL AVAILABLE I am an experienced Electrical and Instrumentation Supervisor with over 15 years of experience working in the Mining, Mineral Processing Plants, Power lines and Power Plant sectors. I have played various roles in constructing, installation and commissioning of high and low voltage electrical power systems and infrastructure. Skilled in cable termination, installation and high voltage switching operations. Efficient personnel and resource management and work supervi- sion. Proficient in analyzing, planning, and executing tasks in timely fashion. Possess excellent written and verbal communication skills.EDUCATIONShrink Polymer Systems, UK - Certificate of competence in 24 volts 33KV HV Cable Termination & Installation. June 2011, August 2016The Faraday Centre Ltd, UK - High Voltage switching and Operations Certificate. July 2016Kumasi Polytechnic, Ghana - Electrical Technician level 3. May 2009 June 2012Kumasi Technical Institute, Ghana - Vocational Certificate in Electrical Machine Rewinding & Repairs. September 2004 June 2008Electrical and Instrumentation SupervisorECG Engineering/Lycopodium - Goulamina Project, Mali November 14, 2023Construction Supervising of a team up to 100 personnel.Safety and personnel management to ensure ongoing acceptance with the client safety management.Supervising of High Voltage and Low Voltage Cable installation, Terminations and TestingSupervising of 6 Km, 11KV Overhead Power Line with OPGW and Transformers installation workSupervising of Crushing Circuit (Primary, Secondary, Tertiary) installation work Acting Power Station Superintendent.Independent Contractor - Orezone Project, Burkina December 06, 2022 February 03, 2023To monitor the Progen Generators at Bombore and report.Manage a small operations and maintenance crew in the power station for daily works.Liaise with African Power Services (APS) who are providing the primary power generation from a separate power station at Bombore.Attend daily meetings in the process plant.Manage the power supply to Camp, MSA, OCR, Process Plant and the TSF at Bombore Gold Mine.Page 2 of 3Installation of New Transformers and Maintenance of the powerline. Acting Power Station ManagerECG Engineering/Lycopodium Orezone Project, Burkina October 10, 2022 - October 26, 2022To monitor the Progen Generators at Bombore and report.Manage the Construction and Maintenance of the Power station. (GENSER ENERGY and PROGEN ENERGY).Attend daily meetings in the process plant.Electrical and Instrumentation SupervisorECG Engineering/Lycopodium - Orezone Project, April 23, 2022 October 10, 2022Supervision of 7 Km, 11KV Overhead Power Line with OPGW.Electrical installation of TSF and OCR.Senior Electrical Supervisor Construction and Maintenance Power Systems Service - West African Project, August 2012 - April 22, 2022.Maintenance of 19.2 MW Caterpillar Generator (MaK) Power Plant at West African Resources Sanbrado. (Burkina) Date June 2020 April 2022.Construction of 19.2 MW Caterpillar Generator (MaK) Power Plant at West African Resources Sanbrado. (Burkina) Date Dec 2019 -June 2020.Construction of 24.4MW Caterpillar Generator (MaK) Power Plant - Teranga Gold, Wahgnion (Burkina) Aug 2018- Dec 2019.Construction of 4.6MW Caterpillar Generator (MaK) Power Plant Nantou Mine (Burkina) Dec 2018 Mar 2019.Construction of 11KV Overheard Power line with OPGW at Perseus Mining. Sissingue(Cote DIvoire) Oct 2017 Feb 2018.Construction of 11KV Overheard Power line from site to Camp at Taparko- Nordgold.(Burkina) Jul 2017- Aug 2017.Construction of 2.8MW Caterpillar Generator (MaK) Power Plant at Taparko- Nordgold.(Burkina) Dec 2014 May 2015.Construction of 33KV Overhead Power line with OPG and Assembly and Installation of 2 20MVA Transformer, from Power Station to Bouly-Bissa Nordgold Site Burkina. Jan 2016 Apr 2016.Construction of Camp accommodation and Offices at Bouly-Bissa Nordgold Site. (Burkina) July 2016 Aug 2016.Construction of 3.6MW Caterpillar Generator (MaK) (Expansion of Bissa Nordgold Power Plant) (Burkina). July 2016 Dec 2016.Installation of 4 1250KVA transformers, 2 x Ring Main Units (RMU),11KV Cables and Termination at West hills mall Accra (Ghana). May 2014 Aug 2014.Upgrading of Camp accommodation at RoxGold Burkina. Jan 2014 May 2014.Electrical Installation of Heavy Vehicle Workshop and Offices at Bissa Nordgold. (Burkina) Sep 2013 Dec 2013.Construction and Maintenance of 20.8MW Caterpillar Generator (MaK) Power Plant at Bissa Nordgold. (Burkina) Sep 2012 May 2013.Duties:Construction Supervising of a team up to 40 personnel. Page 3 of 3Safety and personnel management to ensure ongoing acceptance with the client safety management.High Voltage and Low Voltage Cable installation, Terminations and Testing.High Voltage switchboard installation.High Voltage Switching.Transformer installation and Testing.Training the Electrician on Mak Generator installation.Commissioning of the Caterpillar Generator (MaK) Power Plant.Caterpillar Generator (MaK) Power Plant maintenance work.Technical management of design at site level to integrate from a designed status to installation and through to as-built status. (When I was the Site Manager).Technical modification and requirement for site variation.Daily reporting to the Project manager at UK on schedules, potential delay, and construction activities.ElectricianKinross Gold Chirano Mine- Ghana April 2010 August 2012. ElectricianRed Back -Chirano Gold Miner (Ghana) February 2009 April 2010 ElectricalE n I Electricals Ghana - Goldfield Tarkwa Mine July 2008 February 2009. Industrial Internship.Komfo Anokye Teaching Hospital (Electrical Maintenance) (Ghana) August 2006 july2007.RefereesMr Adrian BurkeProject ManagerPower Systems ServicePHONE NUMBER AVAILABLEEMAIL AVAILABLEMr. Joshua ButterworthElectrical SuperintendentECG Engineering Pty. LtdPHONE NUMBER AVAILABLEEMAIL AVAILABLEMr. John ScottPower Station SuperintendentOrezone Bombore SAPHONE NUMBER AVAILABLEEMAIL AVAILABLE |