Candidate Information | Title | Seasoned, versatile, productive and Successful Construction Proj | Target Location | US-IL-Springfield | | 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateSUMMARYExperienced and Successful construction and engineering project management professional with over 30 years of experience. Beginning my career as a dirt laborer over the summer of my 13th birthday and throughout my teenage years where I learned the basics of concrete, masonry, pipe laying, and excavation & grading. I worked hard soaked up everything I could from the other guys who mostly had 30 years of experience under their belts. I began developing my skills as a craftsman in multiple trades, and continued to work on a part-time basis throughout my high school years when I wasnt playing football, running track, or fulfilling the requirements of an enlisted Marine awaiting shipping out to basic training.I continue to build on my knowledge through both formal education, as well as professional development training to help me rise through the ranks to Field and Operations Management on large-scale and high profile projects across the nation.*After many years of traveling for contract and project based positions, which was never my desire especially as the single father of my 2 sons, that I had custody of from the time they were ages 2 and 5. However due to the aforementioned and being displaced by the local economy in my long time field of heavy civil engineering, bridge & road, and site-work I had little option. I am ONLY seeking long term stable employment with an outstanding organization.Certificates, References, and other Supporting Documents can be given in .pdf format upon requestWORK EXPERIENCEApril 2000-CurrentOwner Operator - Consulting, Management, Journeyman Experienced Multi-Skilled TradesmanAW Engineering And Consulting ( Formerly AW General Contracting Starting 2000) Springfield, Illinois, United StatesSmall Business, Part Time, Sole-ProprietorshipMunicipal, Multi Family, Retail, Commercial and Residential Construction, Repair, Remodel, Masonry, Site work, Management and Consulting of small to medium size projects.March 2022-August 2022Project SuperintendentTanderen CompanyOrlando, Florida, United StatesLarge Site work and underground utilities projects in and around Metro Orlando area*Geneva School- Casselberry, FL*UCM School Addition- Winter Garden, FL.*Orlando Regional Realtors Assn- Orlando, FL2019-December 2021Project SuperintendentGC WorksGatlinburg, Tennessee, United StatesUS Department of Transportation, Nation Parks Service. Removal and Replacement of Asphalt: Estimated Cost:$6,000,000This project consisted of removal and replacement of 25 miles of asphalt roads in Smokey Mountains National Park near Gatlinburg Tennessee In addition to roads, there were also 4 large parking lots. Some additional areas of the project required crack sealing, ditch regarding, misc. seeding, bridge expansion removal and replacement, concrete sidewalk removal and replacement, signage, detailed traffic control.October 2018-April 2019Utilities ForemanBlythe DevelopmentCharlotte, North Carolina, United StatesCity of Charlotte, NC Municipal Utility District Lilly Mill Storm Drainage Improvement Project: Estimated Cost: $9,200,000 The Lilly Mill Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood and address stream erosion to provide a more natural, stable stream system. The project is located within a drainage area of approximately 100 acres. Includes Underground Utilities, Milling/ Paving, Concrete Curb/ Gutter and Sidewalk, Box Culverts, Clearing and Grubbing, Grading, and Seeding.June 2018-October 2018Utilities SuperintendentCarolina Specialties ConstructionHendersonville, North Carolina, United StatesUnderground utilities installation, Excavation, Grading, and Concrete Placement, on commercial and industrial projects.Project Valuations typically $100,000 to $1,000,000November 2017-June 2018Project SuperintendentTLC Diversified IncPalmetto Bay, Florida, United StatesPinellas County, FL Boca Ciega Bay Subaqueous Water Line ;Estimated Cost: $48,000,000Jack and bore 4,100 lf under Boca Ciega bay and install 24" C905 fused waterline. Excavation, grading, valve and structure installation. Asphalt and Concrete pavement. City of St. Petersburg, FL Sludge Lines;Estimated Cost: $12,000,000Project consisted of installing plant equipment in the NE and NW plants, as well as running approximately 20 miles of fused HDPE piping with structures, and odor control stations to the SE and SW plants to reduce the volume of solids in the northern plants.March 2017-November 2017Project SuperintendentKennedy Construction ServicesOrlando, Florida, United StatesCommunity Presbyterian Church School:Estimated Cost: $1,750,000Excavation/ Grading, Concrete, Masonry, Paving, and Site work in the construction of the new Presbyterian School inCelebration, FLAugust 2016-March 2017Project SuperintendentState of Louisiana Bayou St. Louis BridgeMorgan City, Louisiana, United StatesEstimated Cost: $2,500,000Clearing/ Grubbing, Excavation, Grading, Pile Driving, Concrete Paving, and Concrete structure construction of a 7 span bridge with columns, abutments, approaches, barriers, and bridge members over the Bayou St. Louis in Houma, Louisiana for the new state highway which was being installed.October 2015-August 2016Project SuperintendentFHPMiami, Florida, United StatesCity of Miami, FL Flagler Street Beautification:Estimated Cost: $28,000,000Demolition of Existing asphalt roadway, and Sidewalks. Removal and Replacement of underground utilities (Storm, Water,Sanitary). Placement of new Concrete Sidewalks with Curb and Gutter (colored and stamped/ seeded), Placement of Asphalt Roadway, Installation of Landscaping and Amenities. City of Miami Beach, South Pointe Park:Estimated Cost: $3,000,000Demolition of existing park (concrete) and water features. Excavation and Grading, concrete placement (seeded with coquina, and colored), Installation of marble fountains, Installation of Mister canons, installation of Coral Banding, Installation of pumps and piping. Installation of Landscaping and Amenities.March 2015-October 2015Construction ManagerO'Day Equipment LLCMinot, North Dakota, United StatesManager of Civil Construction in Petroleum Industry.November 2014-March 2015Civil Structural ForemanJames Construction GroupNew Orleans, Louisiana, United StatesState of Louisiana Westbank Elevated Expressway:Estimated Cost: $4,000,000,000Construction of approximately 10 miles of elevated expressway on the Westbank of the Mississippi River in Jefferson Parish. Mass excavation and Grading for paving and structural concrete placement. Forming for and placement of concrete for mass bridge structures, and pavement. Grading and Asphalt Placement for surface streets. MOT.January 2014-November 2014Project EngineerHalverson ConstructionSpringfield, Illinois, United StatesUnion Pacific High Speed Rail:Estimated Cost: $750,000,000Structural construction and repair of bridges and other structures; excavation and grading of railway to ballast; for the construction of the High-speed rail from St. Louis Missouri to Chicago Illinois. (Phase 4)October 2011-2013Heavy Civil SuperintendentMountain Creek ContractorsCatawba, North Carolina, United StatesNCDOT Camden County Box CulvertsEstimated Cost: $2,000,000Consisted of 3 cast in place box culverts in the swamp. Each built in 2 phases as to keep traffic flowing. Work consisted of excavation and demolition; forming of concrete footings, slabs, walls and wing walls, and lids; Driving of wooden piles to keep the road and culvert from sinking or floating in the swamp; heavy dewatering; and backfill. Approximate sizes were 120' L X 6' H X 12' W.April 2010-March 2011Heavy Civil/ Bridge Project Manager/ Estimator/ Field SupervisorMiller Contracting GroupOttoville, Ohio, United StatesAllen County, OH Berryman 1252 Drainage Improvement:Estimated Cost: $450,000Consisted of 3,222 linear feet Storm Sewer, Waterway Re-grading, Residential Driveways Cut and Repair, Soil Retention Blankets, Seeding, and Fertilizing.City of Lima Ohio South Main Street Bridge:Estimated Cost: $480,000Hydro demolition of the entire surface of the bridge deck to 2.5 inches, Hydro demolition of monolithic sidewalks and curb, Replace deck with micro silica overlay, installed new bridge expansion with asphalt modified filler, Repaired abutment and pier cracks with epoxy injection, repaired spalls in abutments with thin patch.Henry County Ohio M7.75 Bridge:Estimated Cost: $1,000,000Demolition of existing structure, Clean-Up of river below adding filter fabric and rip-rap and excavating river bed to increase flow ability, Construction of a longer span box beam bridge, paving and striping of approximately 1 mile of asphalt.Bowling Green State University Infrastructure Improvements:Estimated Cost: $2,500,000Consisted of new storm sewer, underground box structures, water, sanitary, sidewalk, curb and gutter, asphalt paving, miscellaneous structures, and amenities.April 2007-December 2009Heavy Civil Project Manager/ Estimator/ Field SupervisorACE Contracting of Illinois, Inc / JK5Springfield, Illinois, United StatesRochester Illinois High School Athletic Complex:Estimated Cost: $1,000,000Demolition of Structures, Excavation and Storm, Sanitary, and Water installation, Concrete and Asphalt Paving.Dwight Illinois State Correctional Facility Asphalt Paving:Estimated Cost: $360,000Removal and Milling of Existing Asphalt Paving inside Facility. Excavation and Grading. Placement of Asphalt roadways and parking lots.City of Galesburg Illinois, Lincoln and Silas Willard Schools:Estimated Cost: $750,000Demolition, Excavation for and Construction of sidewalks, drives, asphalt paving, and storm sewer with detention basins.City of Sullivan Illinois Elementary School Parking Lot Replacement:Estimated Cost: $750,000Approximately 1500 CY of concrete replacement for the asphalt lot that we demolished and removed. Included demolition, grading, concrete placement and striping.March 2006-April 2007Heavy Civil Superintendent/ Inspector, QA/QC, Safety (Owner's Rep)Ferrovial AgromanChesterton, Indiana, United StatesState of Indiana I-80 Toll Road Reconstruction:Estimated Cost: $2,000,000,000I worked on Phase 1 of 3 in this design build project between mile post 10.6 and 20.27. Each phase included pavement and structure enhancements to accommodate an additional driving lane. Bridges Included the Hobart Bridge, Clay Street Bridge, And Martin Luther King Bridge, as well as several storm sewer structure projects. Bridges were all totally modified and used a latex overlay.April 2005-January 2006Project SuperintendentTLC DiversifiedPalmetto Bay, Florida, United StatesWater & WWTPs Construction, Upgrade, and Maintaince for Various Municipal Organizations throughout FloridaMarch 2004-February 2005Field Engineer/ Operations ManagerThomCo Enterprises, IncTampa, Florida, United StatesPROMOTEDGovernment/Civil and Commercial General Contractor)Promoted and Charged with Entire Operation of Tampa, FL OfficeField Engineer (Project Manager and Superintendent/ Estimator)Concrete and Asphalt Paving, Site-work, Excavation, Underground Utilities, Demolition, Commercial;Tampa Housing Authority JOC Contract,HillsboroughCounty Parks and Rec.US Army Corps of EngineersGSAFEMA,**Managed Disaster Crews Following Hurricanes Charley, Frances, and Jean in Western and CentralFloridaOctober 2003-April 2004QC/QA Inspector/ SafetyThomCo Enterprises, IncRock Island, Illinois, United StatesFinished as Project and QC/QA Manager)US Army Corps of Engineers MATOC Projects on the Locks and Dams in the Rock Island District. USACE Mississippi River Lock and Dam Security Projects:Estimated Cost: $2,500,000Security fencing and technology upgrades on Lock and Dams 15 to 22.PROMOTEDJanuary 2000-October 2003Heavy Civil SuperintendentCrystal Cascades Civil EngineeringLas Vegas, Nevada, United StatesRoads, Bridges, Site-work, Excavation, Utility/ Underground, Heavy Civil, Tunneling, Boring, Blasting, Demolition, Concrete, MasonryBridges, Flood Channels, and other large and diverse civil projects.US Army Corps of Engineers F-1 and F-2 Flood Channels, Las Vegas, NV:Estimated Cost: $5,000,000,000This project was the most challenging project of my career. In a joint venture with Wiser Construction we constructed 2 - 3 mile long flood channels with residential bridges and confluences in untouched Federal BLM land right into Red Rock Canyon. We poured approximately 500 cubic meters of concrete a day for a little over a year in walls and channel bottom, along with the excavation and blasting in the Rocky Mountains. Blasting of the mountains to create a detention basin to hold all of the water. I recently went back to this once undisturbed land to see that it had been developed to its maximum potential.Alexander Street Bridge, Las Vegas, NV:Estimated Cost: $1,200,000This project was a new construction project on the new 215 Freeway on the west side of Las Vegas. This soffit filled bridge was the first soffit filled bridge I ever constructed and consisted of working with American Asphalt and Paving. The construction of this bridge was also in conjunction with our installation of several flood channels and residential bridges over them. I also worked as an assistant superintendent on several other bridges in this expansion.Flamingo Wash, Las Vegas, NV:Estimated Cost: $3,000,000Construction of another concrete flood channel for Clark County with a residential bridge and spillway. Excavation and construction of a 30 foot wide concrete flood channel with 16 foot walls, and slope paving. The Flamingo wash was destroyed by the "100 year flood" and the bridge sat closed for about 5 years until the reconstruction.C-1 Flood Channel City of Henderson, NV:Estimated Cost: $2,000,000Construction of another concrete flood channel for Clark County with a residential bridge and spillway. Excavation and construction of a 30 foot wide concrete flood channel with 16 foot walls, and slope paving.Duck Creek Wash, Las Vegas, NV, Clark County:Estimated Cost: $2,000,000Construction of another concrete flood channel for Clark County with a residential bridge and spillway. Excavation and construction of a 30 foot wide concrete flood channel with 16 foot walls, and slope paving.NDOT Torrey Pines Bridge at US 95, Las Vegas, NV:Estimated Cost: $6,300,000Demolition and Construction of the first bridge in the US 95 expansion through Downtown Las Vegas. The bridge was demolished and rebuilt in two sections as to leave one section constantly open. The expansion was from 6 lanes to 14 lanes and required 24 hour construction.Trades Experience:(Prior to management)Prior to field and project management was a multi-skilled tradesman and also worked as a tradesman while between professional employment positions. From the age of 13 started working in concrete. Typically worked as a foreman, but regardless is hands on. Worked as a concrete finisher, laborer, rod buster, equipment operator, form carpenter, and pipe layer primarily, has Union and Non-Union Experience and has worked on Residential projects such as sidewalks and driveways (including stamping and ornamental); commercial projects such as big box, high rises, and multi-family; industrial projects such as process, and agricultural; highway and civil projects such as roads, flood channels, box culverts, bridges, water and waste-water treatment. Worked on high profile projects such as paving and masonry for stars and studios such as Sylvester Stallone, Warner Bros. and worked on projects for companies such as ADM and Tate and Lyle, and worked on small projects as well.EDUCATION2021-CurrentLaw and Legal StudiesUniversity of Maryland GlobalSome College Coursework in Law TransferUniversity of Maryland Global-Some College Coursework in Business Administration/ Project Management Law1997-2023PrelawLincoln Land Community College Springfield, Illinois, United States Pre-law2019-2020Business AdministrationSouthern New Hampshire UniversityManchester, New Hampshire, United StatesSouthern New Hampshire University -Some College Coursework in Business Management Business Management2012-2013Engineering ManagementGrantham UniversityKansas City, Missouri, United StatesSome College Coursework in Engineering Management Engineering Management1993-2010Industrial ManagementLewis and Clark Comm. CollegeGodfrey, Illinois, United StatesIndustrial Management1999-1999Certificate of Completion Masonry Trades TrainingInternational Masonry InstituteChampaign, Illinois, United StatesInternational Masonry Institute - Champaign, IL Masonry/ BricklayingSKILLSGeneral Contracting Excavation Blueprint ReadingBluebeam Change Orders Demolition Piping PRE-Construction OSHA Commercial Projects Structural Concrete Municipal Underground UtilityWastewater Treatment Water Treatment Plant Asphalt Paving Railway Bridge ConstructionStorm Drainage Civil Engineering Budgets Estimating Take-Offs Construction Management OSHA 30OSHA 10 Design Build Erosion Concrete Stamping Union Experience Industrial ProjectsField Engineer Project Engineer Petroleum Telecommunications Landscaping MasonryHeavy Equipment Scheduling Finisher Project Manager Government Contracting Operations QACPR Microsoft Office Microsoft Project Roadway Construction Safety ManagementConcrete Form Carpentry Layout Concrete Finishing Concrete Placement RebarConstruction Heavy Equipment Operator Procurement Contracts Negotiations Underground UtilitiesAutomotive Repair and Maintenance Block Masonry Concrete Formwork Concrete RepairConcrete Inspection Primavera P3 Primavera P6 Primavera CM13 Heavy Equipment/Vehicles Heavy BidHeavy Job Xactimate Mentoring Training/Teaching Quality Assurance Quality ManagementSanitary Sewer Storm Sewer Fire lines Water Main Reinforced Concrete Barrier WallPrecast Concrete Dewatering Lift station Pumps AGTEK Software Microsoft WordMicrosoft PowerPoint Microsoft Excel Microsoft Outlook Instruction Primavera SureTrak Google AppsProcore Proposal Development Skid Steer Loader Wheel/Front-End Loader Milling Machine High reach ForkliftsMan lifts Backhoe Loader Hydraulic Excavator Mini Excavator Road Roller Cutting Torch SubmittalsContract Management Contact Management Subcontractor Management Cash ManagementMaterials Management Vendor/Supplier Sourcing Compactor Hand Tools Fiber Optic CableSecurity Fencing Competitive Bids Asphalt Placement Stamped Concrete Concrete ColumnsHardscapes Tractor Equipment Safety Small Tools Power Tools Pneumatic Tools Builders LevelTotal Station Painting (Facilities and Maintenance) Excavator Customer Relations Drainage RoofingHeavy Civil Engineering Site Evaluation Insurance Repair Team Building Underground ExcavationCERTIFICATIONSTWIC Card*Needs RefreshedCertificate in Masonry Trades Heavy Equipment Operator Cert(Indicates all of the multiple pieces of Heavy Equipment I am proficient at operating Confined Space Cert.OSHA 30 hr.Excavation and Trenching Cert Fall Protection Cert.OSHA 10 Refresher ASCEMultiple Professional Development Certifications from American Society of Civil Engineers ACIMultiple professional development certificates from the American Concrete Institute.HONORS & AWARDSDean's ListGrantham UniversityLANGUAGESEnglish - FluentEXTRACURRICULARSMember ACIMember ASCEMember NSPEUS Army Corps of Engineers CQMUS Army Corps of Engineers SafetyOSHA Certified 1999 and 2019First Aid & CPR 2010Desert Tortoise TrainedHabitat for Humanity VolunteerEngineers Without BoardersFormer Carpenters Local #16, Collinsville, IL (Carpenter)Former Laborers International Union of North America #477 Springfield, IL (Laborer/ Finisher)Former Bricklayers and Allied Craftworkers Local #8 Springfield, IL (Bricklayer)American LegionWORK AUTHORIZATIONI am authorized to work in the following countries: United States |