Quantcast

Construction Project Quality Control Res...
Resumes | Register

Candidate Information
Title Construction Project Quality Control
Target Location US-TX-Austin
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes

Project Construction Manor, TX

Project Manager Commercial Construction Pflugerville, TX

Project Manager Construction Leander, TX

Project Superintendent Construction San Antonio, TX

Project Manager Construction Austin, TX

Quality Control Project Management Austin, TX

Project Management Construction Manager San Antonio, TX

Click here or scroll down to respond to this candidate
HIGHLIGHTSEXPERIENCEYears of experience: 13+Years.EDUCATIONMaster of Construction project management from Arizona State University ASU (Undergraduate)Bachelors degree in civil engineering of National Military Academy of Afghanistan (NMAA)  Graduated 2010.Istalif High School  Graduated  2003.CERTIFICATIONConstruction Quality Management for Contractors/SW9-03-23-00129 Certificate U.S. ARMY CORPS OF ENGINEERSOSHA  30 Hours Outreach Training ProgramCPR / AED / First Aid (Adult / Child / Infant / choking) Certificate.ID# 6415FBCD (Completion of May 04, 2023)Certificate of EM385-1-1 40 Hour.PCC workshop certificate Heather Smith USACE TSCAdvanced Project Scheduling Series Certificate (Dec-2010).PROFESSIONAL EXPERIENCE:Contractor Quality Control manager CQCM: Sep 2023March 2024ACE Consultant Specializing in Construction, Security and Training ServicesProject: W912QR21C0031, P2: 467417,ROTARY WING LANDING PAD CONROE ARMY RESERVE AVIATION BASE, CONROE, TXContractor Quality Control manager CQCM: Aug 2023Sep 2023ACE Consultant Specializing in Construction, Security and Training ServicesProject: [H2003323] W912QROD0026 and W912QR22F0199Davis-Monthan Reno B5247 47th Fighter Sq, Tucson, AZConstruction Project Manager PM Dec.2021-Feb.2023ROMSIT CONSTRUCT SRL, ROMANIA.List of projects which I worked with ROMSIT companies in Romania:Total price of projects was 67M Euro.Rehabilitation of TRAIAN VUIA building (50.5x18.5m in 4 Floor) Technic college.Rehabilitation of TEOLOGU building (31.5x28.4m in 3 Floor) High school.Renovations of portable water system of ARMATA POPORULUI street Single pipe of diameter 25cm.Renovations of portable water system of DOMNEASCA street double pipes of PEHD De 500mm and Teava PEHD De 250mm.Renovations of portable water system of UNIVERSITATII -AI CUZA-LAHOVARY, DE APA street Single pipe of diameter 25cm.New construction of tree floor building of Kindergarten of TIGLINA 2GENERAL SCHEDULER. 08/2018 to 08/2021SEPTIOGLU INS MAD LTD STI, AFGHANISTAN.Worked as a General scheduling and assistant PM for KHOST International Airport complex project, Afghanistan.The complex project was (in Multi Phases of contract, which included Runway, Taxiway, Apron, Parking, Control tower and airport Terminal) with a total cost of 113M.QC Engineer 12-2014 to 08/2018SEP CONSTRUCTION CO (TURKISH INTERNATIONAL COMPANY) AFGHANISTAN. Design and Construction of Parwan-e-two up to Qualey Khoja Bughra in 4 lines and 35 KM, including the design and construction of new water collection systems. The project price was 25 M USD.Contractor Quality Control Manager CQCM 01-2012 to 12-2014CLEVER CONSTRUCTION COMPANY, AFGProject #: W5J9LE12C0067, ANP BP Company HQ Tapa Khoran, Lash-e-Juwan District, FARA PROVINCE, AFGHANISTAN.Project DESCRIPTION1-GENERAL (Mobilization/Demobilization, Security - Static &Dynamic, (UXO) Removal, O&M Manuals)2-DESIGN PROGRAM: (Site Survey, Geotechnical Report, A/E Design, Record Drawings)3-SITE DEVELOPMENT: (Site Demolition/Preparation, Site Grading, Well drilling Casing and Screening, Potable Water System and Storage, Elevated Water Storage Tank, Well Pump, Wastewater Collection and Treatment System, Electrical Generation and Distribution System, Generator Fuel Tank, Communication System, Fuel Storage, Generator Canopy, and Vehicle Fuel Point, Vehicle Fuel Tank, Fuel Pump)4-FORCE PROTECTION: Perimeter Wall and Fencing, Gates, and Barriers.5-FACILITIES: (Administration Multipurpose Bldg, Open Bay Barracks, Womens Barracks, Gate House, Guard Towers, Guard Shack, Trash Collection Point, Warehouse, Secure Storage Building (ASP), Well House (U03), Composting Toilets)SITE QC ENGINEER 10-2010- 01-2012AZEEM CONSTRUCTION CO, AFGHANISTANSite QC Engineer for construction of Pojawah elementary school in Khenj District of Panjshir Provinces, and construction of Concrete footpath on Wardak provinces PRT.PHONE NUMBER AVAILABLE EMAIL AVAILABLEMir Firozuddin ShamsiC-QCM

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise