Quantcast

Climate Change Civil Engineering Resume ...
Resumes | Register

Candidate Information
Title Climate Change Civil Engineering
Target Location US-IN-Indianapolis
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes
Click here or scroll down to respond to this candidate
1. ProposedPosition:2. Name of Firm :3. Name ofExpert: Aung Ye HTUT4. Date of Birth : 24 October 1976 Citizenship: Myanmar 5. Completepersonalcontactdetails: 2111, Radcliffe Ave, Indianapolis, Indiana, USAPHONE NUMBER AVAILABLE; E: EMAIL AVAILABLE 6. Education :  PhD., Water Engineering & Management, Asian Institute of Technology, Bangkok, Thailand, 2015 M.E.,Civil Engineering Faculty, Yangon Technological University, Yangon, Myanmar, 2005 B.E., Civil Engineering Faculty, Yangon Technological University, Yangon, Myanmar, 2000 7. MembershipinProfessionalAssociations:  Professional Engineer (Water Supply & Sanitation) Forecasting Climate Change Scenarios of the Bago River Basin in Myanmar Journal of Earth Science and Climate Changehttps://www.researchgate.net/publication/272420954_Forecasting_Climate_Change_ Scenarios_in_the_Bago_River_Basin_Myanmar Modelling the potential impacts of climate change on hydrology of the Bago River Basin, Myanmar, International Journal of River Basin Management https://www.tandfonline.com/doi/abs/10.1080/15715124.2016.1164177?journalCode=trbm20 Land Use and Climate Change Impacts on the Hydrology of the Bago River Basin, Myanmar, Environmental Modelling & Assessmenthttps://link.springer.com/search?query=aung+ye+htut%2C+sangam+shrestha Uncertainties in SWAT extreme flow simulation under Climate Change of the Bago River Basin in Myanmar, ASEAN-EU STI DAYS in Paris, 2015 http://rcisd.eu/wp-content/uploads/2013/10/excellent_science_in_asean.pdf 8. OtherTraining(Indicatesignificanttraining sincedegreesunder 6.Education): ASEAN-EU STI DAYS in Paris,17-19 March 2015http://2015.stidays.archiv.zsi.at/index.htmlPartnerships in Water and Biodiversity for Sustainable Development, Young Researchers School(YRS) 2013 YRS, 9-20 September 2013http://prospernet.ias.unu.edu/projects/young-researchers-school-yrs/2013-yrsClimate, Energy and Food Security at United Nations University, 27 Sep 2012 to 25 Jan 2013 https://unu.edu/9. Countries ofWorkExperience: United Arab Emirates, Thailand & Myanmar10. Languages : Level of Proficiency (Mother Tongue, Excellent, Good, Fair, Poor) Language Speaking Reading WritingEnglish Excellent Excellent ExcellentJapanese Fair Fair FairThai Fair Fair FairMyanmar Mother Tongue11. EmploymentRecord: From (Year): 2021 (November) To (Year): 2023 (August) Employer:Position held:From (Year):TAMAS, United Arab EmiratesWater Infrastructure Engineer (Construction)2016 To (Year): 2021 (September)Employer: Nippon Koei Co., LtdPositions held: Hydrologist/Water Supply & Sewerage Engineer/Procurement From (Year): 2012 To (Year): 2016Employer: TEAM Consulting Engineering Co., LtdPositions held: Senior Water Resources Specialist/Business Development From (Year): 2011 To (Year): 2012Employer: Directorate of Water Resources and Improvement of River Systems Positions held: Senior Construction EngineerFrom (Year): 2008 To (Year): 2011Employer: Ministry of Construction (Bridge & Buildings Directorate) Positions held: Senior Civil EngineerFrom (Year): 2003 To (Year): 2008Employer: Naypyitaw City Development CommitteePositions held: Construction EngineerFrom (Year): 2000 To (Year): 2003Employer: Ministry of Construction, Directorate of Road Positions held: Civil Engineer12. Detailed Tasks Assigned 13. Work Undertaken that Best Illustrates Capability to Handle the Tasks AssignedName of assignment or project: Enhancement of Water Supply across Sharjah Year: 2 November/ 2021  11 August/ 2023Location: Sharjah, United Arab EmiratesClient: Sharjah Electricity, Water and Gas Authority (SEWA)/ TAMAS, United Arab Emirates Main project features: SEWA is doing to set up a project of a new desalination plant in Al Hamriyah region in which two water transmission lines. The plant is planned to boast 90 million gallons per day capacity to be completed in 2026. The water network will cover 3,300 km.Position held: Water Infrastructure EngineerActivities performed: Construction Engineer for Access road (14,011 m). Project Engineer (Grade 1) for Clear Water Tank (54,000 m3), Pump Houses, Control Rooms and 12 Pipe Bridges along Transmission Line. Name of assignment or project: PR WATER II Project MY-P17, WATER SUPPLY SECTOR UNDER REGIONAL DEVELOPMENT PROJECT FOR POVERTY REDUCTION PHASE IIYear: September/2018  September /2021Location: Naypyitaw, MyanmarClient: Japan International Cooperation Agency (JICA)/ Nippon Koei Main project features: The 22 subprojects in PR WATER II had been selected during the JICA Preparatory Survey. To improve and upgrade the basic infrastructures throughout the country, namely: Water Supply. This consulting service is for the Water Supply Sector of the Project (hereinafter referred to as PR WATER II). The 22 subprojects will be implemented in PR WATER II are distributed across 4 states and 5 regions of Myanmar, namely: 1) Rakhine State, 2) Kayin State, 3) Mon State, 4) Shan State, 5) Magway Region, 6) Mandalay Region, 7) Ayeyarwady Region, 8) Bago Region, and 9) Tanintharyi Region. Positions held: Water Supply Engineer/Procurement and Contract Administration Specialist Activities performed:1. Assistance to DRD/RDCs/SDCs in preparing standard technical specifications for construction and procurement work 2. Assist DRD in examining contracts and managing financial process of the project 3. Provide necessary advice to DRD/RDCs/SDCs/TDCs for smooth and efficient implementation of the respective sub-projects 4. Assist DRD in preparation of bid documents and review of other part of bid documents in terms of contractual consistency 5. Assist DRD in commercial evaluation of bid documents submitted by bidders 6. Assist DRD/RDCs/SDCs in preparation of contract documents between DRD and the contractor 7. Assist DRD/RDCs/SDCs in preparation of contract document between TDC and the contractor including technical operation training8. Assist DRD/RDCs/SDCs in planning and conducting procurement in compliance with the Contract 9. Assist DRD in monitoring and evaluation of the contractors compliance to the Contract for the Project 10. Assist DRD in preparation of periodical monitoring reports 11. Assist DRD in checking and reporting evidences including receipts, invoices, claims for payment 12. Assist DRD in operation on disbursement and replenishment 13. Regular monitoring of the financial situation and submitting financial reports quarterly and annually to DRD Name of assignment or project: Feasibility Study for Sewerage System Development in Yangon City Year: 11/2016  8/2018Location: MyanmarClient: Japan International Cooperation Agency (JICA) Main project features: Improving Waste Water Treatment Plant by means of Membrane Bioreactor (MBR), 5 main sewer lines installation and Backyard Drainage System (BDSs) improvement with separated sewer system in CBD are of Yangon. Positions held: Project Coordinator & Sewerage Engineer Activities performed: Responsible for preparing Design Bid Documents and technical specifications for procurement work and construction to YCDC. Design Work of preliminary design for new WWTP MBR Type (112,000 m3/day), Design retaining wall with outlet pipe (effluent) on the Yangon River side, Design new BDS system (storm water and both of black & grey water are separated) indicating depth of storm water ditch, thickness of concrete pavement, diameter of sewer pipe and size of chamber/manhole, and Sludge Treatment Process (Thickening, Dewatering & Mechanical Dying) with Sludge Final Disposal. Planning 5 main sewer lines by Open Cut& Pipe Jacking Methods. Implementation a rough project schedule. Cooperating with AutoCAD operators to provide drawings and designs for FS report. Calculating a rough cost of MBR, BDSs and main sewer lines. Cooperation with Local Consults (REM, Asia Air & Geotech) for Environmental & Social Survey, Topography Survey and Soil Survey. Analysis of Resettlement Action Plan including Consulting Meeting inside existing WWTP. Review reports of ENVIRONMENTAL AND SOCIAL CONSIDRARIONS SURVEY (IEE LEVEL SURVERY), Geo Survey and Topography Survey. Coordinator for all meetings of Progress/Technical with Chief/Deputy Engineers/Secretary and Yangon Government.Name of assignment or project: Infrastructure Improvement of Min Dhamma Year: 09/2017 - 11/2017Location: MyanmarClient: Japanese Government (not JICA. Other Japanese government fund) Main project features: Improving Drainage Channel for new infrastructure & flood diversion and Artificial pond for storm water managementPositions held: Water Resources EngineerActivities performed: Responsible for technical specifications for procurement and construction works. Calculating drainage design(rectangular shape) with collecting rainfall data and previous flood data. Design artificial pond to store storm water. By using GIS, provide catchment area and discharge capacity inside study area. Supervision AutoCAD works to provide drawings and design. Name of assignment or project: Updating the Strategic Urban Development Plan of the Greater Yangon Year: 08/2017 - 09/2017Location: MyanmarClient: Japan International Cooperation Agency (JICA) Main project features: Improving drainage channel for creeks namely Thamine Chaung, Kyaikkasan Chaung, Kunnapinlain Chaung, Theybu Chaung and Ywa Thit Chaung. Design of retaining wall where necessary. Positions held: Data Collector/Surveyor/Drainage/Flood Engineer Activities performed: Responsible for Bidding Documents for Design, Site surveying along those creeks and questioner survey of floods and river erosion. Using ArcGIS, provide catchment area. Calculating discharge capacity at outlets. Preliminary design of trapezoidal and rectangular shapes of drainage channel. Calculating Reinforced Concrete Retaining Wall in some parts. Coordinator for all meetings with YCDC Road & Bridge Department, Township Administrative and YCDC Secretary. Supervising GIS works including training to YCDC staffs.Name of assignment or project: Yangon-Taik Kyi Road Improvement Year: 03/2017 - 05/2017Location: MyanmarClient: MAX Highway / financing agencyMain project features: Expanding road with drainage facility from Mingalardon from Taik Gyi Positions held: Data Collector/Surveyor/Highway Engineer Activities performed: Responsible for design of highway with 4 types. Using Arc GIS, provide catchment area and calculate discharge capacity. Cooperating with local consults for topography and soil survey. Review reports of Geo and Topography surveys. Name of assignment or project: East Asia & Pacific (EAP) Comparative Study of the Legal & Institutional Frameworks for Dam Safety& Disaster ResilienceYear: 01/2017  12/2017Location: MyanmarClient: World BankMain project features: Finding data for a reportPositions held: Data Collector/Investigator/Surveyor Activities performed: Responsible for meeting with Irrigation Department, Hydropower Department and Private. Finding necessary data and write a draft report.Name of assignment or project: Detailed Design on Bago River Bridge Construction Project, Myanmar Year: 09/2016 - 01/2017Location: MyanmarClient: Japan International Cooperation Agency (JICA) Main project features: Detailed Design of new Thanlin Bridge across the Bago River Positions held: Hydrologist/Construction PlannerActivities performed: Responsible for Bidding Documents, Bid Evaluation and Contract Documents to Ministry of Construction, Technical Specifications for Construction Work, and Cooperating with Local Consults for river channel/bed survey. Review reports of river channel/bed survey. Using rainfall data, ArcGIS and HARAS Hydrological model, project the flow direction. Coordinating with Myanmar Port Authority, Navy and Department of Meteorology & Hydrology. Assist Tender Documents. Supervising all GIS works for the whole project. Cooperating with AutoCAD operators for construction planning. Estimating a cost for construction planning. Name of assignment or project: The Project for Capacity Development of Power Transmission and Distribution System (Phase I)(Baseline Survey), MyanmarYear: 08/2016 - 09/2016Location: MyanmarClient: JICAMain project features: Questionnaire for Baseline survey regarding Human Resource Development in MOEE Positions held: Team LeaderActivities performed: Responsible for site surveying related to Power Transmission and Distribution System in Pathein, Loikaw, Mawlamyaing, Pha un and Naypyitaw cities. Collecting data with the correspondent high offices. Translate into English version for a draft report.Name of assignment or project: Feasibility Study of Dawei Phuhnamron Road, Myanmar Year: 06/2015 - 07/2015Location: MyanmarClient: Ministry of Construction (Myanmar), Gov. of Myanmar / NEDA Main project features: Feasibility Study for NEDA LOAN Project of a road from Phuhnamron to Dawei Positions held: Water Resources SpecialistActivities performed: Responsible for the site investigation of road and bridges (temporary) along the road. Calculating design of drainage (rectangular/trapezoidal) along the road, flood diversion canal (trapezoidal type) (where necessary and small bridges (steel0 on the road. Using rainfall data, GIS and Mike 11 hydrological modelling., provide catchment area and discharge capacity. Meeting with Ministry of Construction in Naypyitaw. Supervising AutoCAD and GIS works. Name of assignment or project: Environmental Survey for Hanthawaddy International Airport, Myanmar Year: 09/2015 - 10/2015Location: MyanmarClient: JICAMain project features: FS for Environmental and Social Survey including health in Hanthawaddy International Airport located in Bago, MyanmarPositions held: Water Resources SpecialistActivities performed: Responsible for collecting data for water quality, rainfall and flood data. Survey for groundwater, water shortage, water supply and water scarcity to review old report. By using hydrological modelling SWAT (Soil & Water Assessment Tool) and GIS, calculating discharge capacity of Bago River. Using CLUE-s Land Use Model., provide the land use map of future. Meeting with Bago Regional Government.Name of assignment or project: Study on Development Plan under the Project for Promotion of Economic Development and Connectivity in the Western Region (Dawei SEZ), Myanmar Year: 05/2015 - 10/2016Location: MyanmarClient: JICAMain project features: Review of Feasibility Study of improvement of Dawei Special Economic Zone. Positions held: Water Resources EngineerActivities performed: Responsible for preparing procurement documents and review of the results of the feasibility study on ITD report including hydrology and meteorology, flood dike, flood management design, retention pond and flood drainage canal. Modify new drainage design and flood diversion channel by using AutoCAD, GIS and SWAT Hydrological modelling. Coordinating with Dawei Regional Government, Italian Thai and local residents for field survey. Planning a reservoir for water supply. Name of assignment or project: Feasibility Study of East-West Economic Corridor Eindu-Kawkareik Road Improvement (68.4km), MyanmarYear: 05/2015 - 07/2015Location: MyanmarClient: Asian Development BankMain project features: Pre-Feasibility Study Road Improvement (68.4km) for Eindu  Kawkareik inside Myanmar Positions held: Flood Management SpecialistActivities performed: Responsible for collecting available meteorological and hydrological data to write a report. Meeting with Ministry of Construction and ADB in Naypyitaw. Preliminary design of drainage along its road. Planning bridges where necessary. Estimating a draft cost for construction.Name of assignment or project: Master Plan Myiek Industrial Estate, Myanmar Year: 06/2015 - 07/2015Location: MyanmarClient: MAKROMain project features: Master Plan of the whole industrial estate in Myeik, Thanintharyi region. Positions held: Water Resources EngineerActivities performed: Responsible for field investigation, review of available meteorological and hydrological data, water drainage canal, flood drainage canal and flood management design. Meeting with Myeik Government and MAKRO.Using GIS, provide maps in master plan. Collecting all necessary data (secondary data) and translate into English. Name of assignment or project: Master Plan of Pathein Industrial Estate Development Plan, Myanmar Year: 01/2015 - 03/2015Location: MyanmarClient: Ayarhninthar Co.,LtdMain project features: Master Plan of Industralia Estate in Pathein Positions held: Flood Management SpecialistActivities performed: Responsible for site investigation, collecting meteorology & hydrology data, design flood dike, pumping stations where needed and flood canal by using AutoCAD and GIS. Coordinator with the client. Estimating a rough cost for the whole project. Name of assignment or project: Constructing Flood Dikes, Myanmar Year: 01/2011 - 12/2012Location: MyanmarClient: Directorate of Water Resources Implementation and River Training Main project features: Construction Supervision for the whole project Positions held: Project ManagerActivities performed: Responsible for constructing River Dikes (Concrete sheet piles, 10 km) in Twante area, Yangon and 11 km Concrete sheet piles in Bago. Supervising AutoCAD, and Finance. Estimating total cost for the whole project. Meeting with Ministry of Transportation.Name of assignment or project: Infrastructures Improvement, Myanmar Year: 2008 - 2011Location: MyanmarClient: Ministry of Construction (Bridge & Buildings Directorate) Main project features: Construction Supervision/Commander for the whole project Positions held: Project LeaderActivities performed: Responsible for constructing 58 Buildings (24 m 18 m), 32 RC Stores (30 m 20 m), 500 & 700 bedded hospitals& Fiber Optic Cables (80 km) for Locals. Responsible for budget management. Supervising approximately 102 engineers(civil/mechanical/electrical) working in Kachin State. Advising technical of civil works (bridge/stadium/concrete roads) to main office of the Ministry. Supervising AutoCAD operators for the whole project. Name of assignment or project: Naypyitaw Urban City Road Improvement, Myanmar Year: 2003 - 2008Location: MyanmarClient: Naypyidaw City Development CommitteeMain project features: Construction Supervision for Concrete Highway Positions held: Team LeaderActivities performed: Responsible for supervising surveying (local company) and constructing 6 Lane concrete road (40 km), Supervising 36 engineers (civil/mechanical/electrical) and 133 Truck, Dozer and Excavator operators. Rectangular shaped surface drainage canals (80 km) & Slab concrete bridges (2 bridges) (60 meters). Managing Concrete Batching Plant for the whole project. Name of assignment or project: Rural Road Improvement, Myanmar Year: 2000 - 2003Location: MyanmarClient: Ministry of Construction (Road Directorate) Main project features: Construction Supervision for rural development project Positions held: Team LeaderActivities performed: Responsible for surveying and constructing Dirt & Gravel Roads (100 km) & Asphalt Roads (50 km) in rural area. Supervising approximately 8 Dozers and survey group. Negotiating with local people to work in their area. 14. Certification:I certify that I have been informed by the firm that it is including my CV. I confirm that I will be available to carry out the assignment for which my CV has been submitted, in accordance with the implementation arrangements and schedule set out in the proposal. Aung Ye HTUTFull name of authorized representative:Dr. Aung Ye Htut(Whatsapp: PHONE NUMBER AVAILABLE, Mobile: PHONE NUMBER AVAILABLE)

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise