| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidate10411 Woodview CircleCharlotte NC Street Address KAY PHILLIPSPHONE NUMBER AVAILABLEEMAIL AVAILABLESUMMARYBilingual (English-Spanish) coordinator with extensive experience in many aspects of engineering system applications including marketing data review, bill of material management, purchasing, production scheduling, inventory control and product launch schedules. High aptitude to analyze and make evaluated decisions for proper implementation and cost effective management of component inventory.EMPLOYMENTEngineering Change Coordinator &Deviation SpecialistCarrier November 2023 Present Maintain the processes (ECNs) for New Part Creation, Bill of Materials Management, and regular updates based upon deviations to ensure accuracyEngineering Change Coordinator Britax November 2018 February 2023 Create, release and update BOMs in the PLM system and push into the ERP system. Assures the integrity of controlled documents. Facilitate weekly ECR meetings. Maintains and updates project summary status. Responsible for familiarity of standard concepts, practices and procedures of operations and engineering. Drives ongoing improvement of ECR/ECN process and data management procedures. Assists in the maintenance and update of process documents.Document Control/EngineeringChange CoordinatorWilbert Plastic Services April 2010 December 2017 Load new bill of materials, changes in bills of materials. Piece price cost analysis (increases/decreases). MPR system maintenance, new parts, current parts, revisions, updates,prints. Track and log engineering changes from receiving to implementation (average of 85 per week). Temporary Product ContentSpecialistLowe's Corporate Support Center August 2009 November 2009 Responsible for maintaining, updating and validating supplier product data in Lowes system. Review data exchanged between Lowes and vendors. Completed major tasks such as: Approving new and updated products. Requesting changes from vendors. Updating GTIN (Global Trade Item Numbers) that identify the products, services and vendors. Involved in Lowes.com Cleanup Project: Analyzed Lowes.com product information to identify and update negative or inaccurate information as well to ensure a positive customer experience while navigating Lowes.com. Project/Transfer Support Analyst John Deere Southeast Engineering Center March 2007 November 2008 Analyzed supplier bill of materials and transferred information into John Deere software system. Audited and corrected the bill of materials from several products involved in transfers. Identification of new parts as well as current ones from supplier bill of materials. In charge of ordering prototypes. Obtained, analyzed, formatted in MS Excel and updated information from different sources (master scheduler, purchasing, sourcing, accounting, and engineering) and systems related to future scheduling, suppliers, costs, and prints. Responsible for maintaining the preliminary print database. Created, adopted, modified, and revised part numbers and bill of materials using PDM, SAP, WISE systems. Created and tracked engineering changes using several John Deere systems as well as the implementation of engineering changes.Homemaker and School Translator March 2001 February 2007 Provided translation services for the Latino population at my son's schools. Independent Direct SalesConsultantMary Kay Cosmetics January 1994 December 2001 Product marketing and sales one-on-one, in groups, online, catalog and phone. Provided personalized skin care and beauty advice giving answers to customer beauty needs. Engineering Change Coordinator Componentes John Deere August 1999 March 2001 Responsible for the coordination of all areas involved in the implementation of engineering changes, processed deviations to use up excess or interchange components to minimize obsolescence. Processed seven-month backlog of engineering changes in two and a half months while maintaining status of currently required engineering changes. Required the processing of thousands of items in the manufacturing and engineering software. Created a report (Engineering Change Bulletin) for managers and company directors for visual tracking of engineering changes. Development and implementation of Deviation Tracking System. Created and developed the design of documents/formats for the distribution of information between departments: engineering, purchasing, accounting and material control. Created an automated Item loading process system to obtain relevant information from all departments for implementation of new part numbers. This system involved 4 Shift and PM. Developed and structured the Document Control Department (formats, flow charts, procedures) Created the ISO9000 Formats/Flow charts and processes for the EC and Document Control Departments. Purchaser / Product Planner White Rodgers Division Of Emerson Electric CompanyFebruary 1999 August 1999 Responsible for placement of production part orders for several products. In charge of scheduling and programming of the products, in very close coordination with production, quality, and receiving and shipping departments. Responsible of processing deviations involved in engineering change implementation. Production Control Specialist Altec/Visteon January 1998 February 1999 Responsible for the follow up of the production parts in current models, using JIT and Kan-ban concepts, Coordination of the Engineering Change meeting with all affected departments. Daily review and analysis with suppliers of shortage/critical parts to avoid line shutdowns. Evaluation of suppliers, including close direct working relationships to improve their performance on quality and delivery of components. Tracked, analyzed, and controlled excess loss and gains in inventory with coordination of cycle counts. Analyzed rejected parts with quality that affected part inventories. Reviewed and analyzed engineering releases sent to suppliers on a daily basis. Processed deviations in the engineering software system. Analyzed and coordinated engineering changes that affected the products, calculated possible scrap or obsolescence, established implementation date involving corporate levels in the process. Performed physical audits to the bill of materials periodically. Responsible for transferring production to facilities in South America. English Teacher Instituto Tecnologico De Chihuahua November 1997 September 1998 Taught required senior level college English course to Mexican students Customer Service / Sales Supplier Development Incorporated September 1995 January 1996 Introduction of new customers to the company, look for potential customers Preproduction Analyst Altec/Visteon September 1989 September 1993 Responsible for engineering changes, deviations and launching of the new models. Analyzed new components affecting new or current models, prototype parts and/or tooling with suppliers. EDUCATIONChihuahua, Mexico Instituto Tecnologico de Chihuahua Fall 1986 Spring 1990 B.A., Industrial Relations/Human Resources Full Academic Scholarship |