| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidate Candidate's Name
EMAIL AVAILABLE PHONE NUMBER AVAILABLE
Martinez, GA Street Address
I have a broad range of experience in heavy industrial construction, nuclear, petrochemical, pharmaceutical, commercial and maintenance. I have held positions in construction estimating, management and engineering. My expertise is quite diverse ranging from QA/QE, non-destructive testing of metals to include welding, piping, tanks, pressure vessels, mechanical equipment, HVAC, structural and re-enforcing steel along with civil soils, concrete and underground utilities. I ve also held qualifications as a radiation worker training instructor, scaffolding and excavation competent person. My highest security clearance held was a "Q" clearance at the DOE's Savannah River Site.Well Versed in The Following2010 Edition ASME B&PV Code SynopsisQSI 18.12-V R0 (Vogtle) Quality Assurance Site SurveillancesCPP-GW-PVP-001 R0: ASME Section 3 ValvesCAPAL Tabular LayoutPP-AP1000-13-012 R0 AP1000 ASME Sec IIIFHE&CM 12.1.1 R2 Control of IM&TEAPP-GW-P0-008 R6 AP1000 Specification for Field Fabricated Piping and InstallationNQA1ASME I and VIII Part 9 R01 Nondestructive ExaminationCausal AnalysisASME III Section 10 R02 Welding and Brazing ControlASME III Section 11 R00 Bolted and Other Mechanical JointsPAP-RES-12.1 R1 Control of Inspection, Measuring & Test EquipmentASME III Section 13 R02 Fabrication and Installation InspectionASME III Section 14 R01 Nondestructive ExaminationND-RA-001-009 Version 1 SNC - ITAAC Maintenance Screening and ReportingASME III Section 16 R00 Control of Measuring and Test EquipmentFAI-IG-1.1 R4 Documentation RequirementsASME III Section 22 R01 Pressure TestingCorrective Actions ProgramASME III Section 27 R00 Supply of ASME III MaterialRoot Cause AnalysisASME III Section 4 R01 TrainingApparent Cause AnalysisASME III Section 7 R02 Procurement ControlGWS-1 R5 ASME General Welding SpecificationLimited Cause AnalysisVisual Examination ASME III NF NG (Nondestructive)Radiographic Examination for ASME ApplicationsCommon Cause AnalysisComputed Radiographic Examination Using Phosphor Imaging ASMECommon Cause AnalysisQuality Assurance SurveillanceCorrective Action Review BoardLevel 2/3 Issue Owner Rev 1Issue Review Committee Member Training Rev 1Common Cause Analysis (CCA) Team LeadEffectiveness Review Team LeaderApparent Cause Investigator (ACI)CAP Issue Owner OverviewQS 17.01 R05 Quality Assurance Records SystemProfessional ExperienceSYSTEM ONE/Savannah River Site 7/17 to 5/19Savannah River SiteSenior Quality EngineerMember of the SRNS ESH&Q MOX transition team concentrating on QA records generated during 12 years of construction activity.Assessing the compliance and completeness as relates to NQA1 and design criteria.Certified level II welding and piping inspectorResponsibilities include performing inspection and testing on various systems at SRS. Also, the generation and maintenance of inspection and test reports.Performed inspections in high radiation areas to include, piping dimensional, welding, hydrostatic testing and pipe supports.Worked with SRR Millwrights, Machinists and Engineers on specialty equipment supports for the DWPF sand filter system. These supports had several parts where the tolerances were highly critical to the operation of the equipment.Inspected modification to the glass cannister storage facility. These inspections required the use of remote measuring devices.Performed various inspections in support of various DWPF maintenance projects.System Start up- Testing- InspectionSavannah River Site TrainingHazardous energy control for support holdersRadiological worker training 2Initial general/supervisor respiratory trainingInitial negative pressure respiratorInitial plastic suit and hoodLevel II InspectorAudits and Surveillance experience.NQA-1; ASME N45.2.23QA Audit Team Lead.FLUOR CONSTRUCTION CO. 11/16 to 2/17Plant Vogtle Reactors 3&4Waynesboro, GA.PM Compliance Procedure CoordinatorResponsible for the review and acceptance of equipment maintenance procedures.Qualified corrective action program Corrective Action Plan issue owner level 1,2 and 3Mechanical Maintenance experience.Qualified ITAAC.CAP Level IIIMS Office and ExcelScreen MeetingsALLNEX/TECHUSANorth Augusta, SC. 10/15 to 05/16Resins PlantPlanner/ Buyer/TemporaryPerformed planning and purchasing for maintenance dept. utilizing Maximo system during plant conversion to SAP.GEORGIA PACIFIC 3/15 to 9/15 McCormack, SC.Maintenance Planner/Buyer/TemporaryFilled in for maintenance planner/purchaser utilizing MP 2 system.GREENWOOD Inc.NUTRASWEETPlanner/Scheduler - 12/2013 to 12/2015Responsible for generating work orders for preventative and corrective action projects. Also, with the purchasing of materials and contract services, all utilizing the SAP system.Responsible for administering, directing and coordinating all maintenance, capital projects, and/or other plant services performed by outside contractors and on - site company personnel. Serves as company's point of contact on site for the customer's maintenance, capital construction projects, turnaround and other department manager's needs.GREENWOOD Inc.GENERAL CHEMICAL Corp. -10/2004 to 12/2013Contract Project Manager/Site Technical RepresentativeResponsible for all aspects of capital construction projects and maintenance activities requiring specialized work order development. Duties include project scope development for bid purposes, project estimates, contractor qualifications, materials and equipment purchasing, planning, scheduling, safety site training and oversight, budgets, manpower and material controls for numerous projects throughout the company. Seven years experience with the Maximo system for work order development, purchasing and inventory. Developed inspection plans for piping systems, code vessels, secondary containment systems, and civil infrastructure system.Designed a lifting system for product loading. This wench and pulley system greatly benefited operator safety and shortened loading time.Established a liaison with the lead engineer on the ASME board for temperature monitoring devices. We were able to devise a thermowell design that has remained in service for six years. The previous system rarely lasted 2 months between change outs.Worked with the assistance of Lafarge concrete to develop a less permeable more acid resistant concrete mix. The resulting mix saved 11% per cubic yard in cost and negated the need for very costly acid resistant sealants and coatings for containment areas.Developed equipment specific lock out/tag out procedures for all plant pumps, tanks, process towers, blowers and miscellaneous rotating equipment.GREENWOOD Inc.MONSANTO BstSafety Director Plant Outage 3/2004 to 6/2004Developed safety procedures for plant outage operations, dealing with systems modifications and to facilitate planned maintenance program. Instituted task specific instructions. Instructions included steps for lockout/tag out of hazardous energy systems, soils excavation and crane operations plans for large equipment and vessel placement.WARRIOR GROUP/GENERAL ELECTRICFt. GORDONSite Technical Representative - 3/2003 to 3/2004Responsible for all phases of construction for building expansions on the Warrior Group/GE contract at Ft. Gordon, Ga.Responsible for the scheduling and coordination of all contractors.Perform quality assurance surveillance per GE corporate procedures.GREENWOOD Inc.MONSANTO Bst - 2001-2002Construction Project Manager/Corp. Quality ManagerResponsible for the administration and supervision of Greenwood quality assurance and welding program, maintenance and construction forces including planners, estimators and craft personnel at Monsanto's bio-pharmaceutical facility in Augusta, Ga.BELCANMONSANTO Bst -1999-2001Construction Site SuperintendentMonitor construction activities and audit completed systems to assure compliance with design requirements, codes (cGMP) and specifications. Certified Level II QCE civil, mechanical and weld inspector per ASME BPE 1993.H. BRITTINGHAM CONSTRUCTION Augusta, GA. -1998-1999Project Manager / EstimatorDirected Construction Process from bid through construction project completion.ATLANTIC COAST MECHANICAL, Columbia, SC 1995-1998Senior Estimator/Project managerProvide direction to the estimating staff for projects throughout the South East. Reviewed divisions change orders for approval and submittal. Managed construction for MCG's Children s Hospital Augusta GA. And St. Francis Xavier Hospital in Charleston, SC.BECHTEL SAVANNAH RIVER INC. Aiken, SC 1987-1995Construction Discipline EngineerResponsible for the planning, estimating, materials procurement, procedure development, inspection and testing of civil, mechanical and piping projects. (Held Q clearance.)MK FERGUSON SAVANNAH RIVER SITE Aiken, SCQuality Control EngineerPrimary inspector for glove box inspection and testing including associated ventilation systems at the replacement tritium facility.Certified visual, mechanical, structural and receipt inspector level II.Certified liquid penetrant, magnetic particle, radiography and ultra-sonic level IIPrior work experience upon request. |