Quantcast

Technical Project Manager Rf Mw Osp Engi...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Technical Project Manager/RF MW OSP Engineer
Target Location US-TX-Sanger
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes
Click here or scroll down to respond to this candidate
 Candidate's Name
Street Address
Mobile: PHONE NUMBER AVAILABLEemail: EMAIL AVAILABLEPROFESSIONAL HIGHLIGHTS
      Experience as Project and Technical Manager, electrical, electronic and telecommunications engineer with experience in wireless and military telecommunications, industrial factory maintenance, R&D and Technical Training.
      Broad experience in the Telecom Industry working with major infrastructure vendors, consultants, and operators.
      Proficiency in 5G NR NSA, LTE, WiMAX, UMTS, GSM, CDMA, TDMA, CBRS, Smart Grid, P25, Tetra, DMR, AMI, AMR & MW Backhaul Transmission Network Design. As well as FTTH/FTTB OSP Engineering and HFC DOSIS 3.x and 4.0, MAS-SCADA PLC, DSL and PoE standards and network design.      Capable and experienced in managing projects, teams, and procurement from a budgetary and time perspective.      Demonstrated ability to communicate effectively at all organizational levels with both external and internal customers.
      Extensive experience in RF Network Design (coverage, frequency planning, model tuning, AFP & ACP).
      Skilled in Radio Network Optimization and Network Performance Improvement.      Proficient in the use of major drive test and analysis tools. Familiar with numerous OSS and performance reporting platforms.      Extensive RFP, RFI and RFQ experience.      Accomplished at dimensioning networks dependent on GOS, traffic, demographics, land use, equipment technology specifications and coverage requirements.      Experienced in all aspects of NSB and Network Expansion including overlays, site audits and swap outs, zoning and planning commission board testimony and hearings and rehearsal preparations with telecommunications law firms.
      Tenable experience in FCC regulatory aspects especially: FCC BDC & CFR Title 47   Telecommunications guidelines Parts (1, 13, 17, 20, 22, 24, 27, 59, 90 95, 96 & 101).      FAA TOWAIR Determination and FCC ASR Registration.      FCC EME MPE compliance and OET Bulletin 65, AM and Inter-modulation Studies, frequency coordination, extension agreements Proficient in the use of major drive test and analysis tools. Familiar with numerous OSS and performance reporting platforms. Familiar with CBRS planned shared Tiered Spectrum (Incumbent, Priority & General) and its management using SAS and ESC.      Conversant with Core and RAN interfaces as well as statistical analysis post-processing tools used in performance optimization and NPI.TECHNICAL & SOFT SKILLS
      Software: MS Office, Visio, MS Project, experience with VB especially VBA and SQL Queries, Alteryx Designer, Perl & UNIX/Linux Shell Scripting.
      RF Planning & Optimization:  AFP& ACP Tools; iBwave; Teoco (ASSET Suite); InfoVista (Planet -AIM, ACP, CA & CS); Forsk (Atoll); CelPlan (CellDesigner Suite); EDX Wireless (Signal Pro); Wavecall (Wavesight, Accura, Out2InSight, WaveGuard).
      Microwave Transmission / Backhaul Planning: InfoVista (Ellipse); Forsk (Atoll Microwave); Pathloss 6.0; CelPlan (CellNetwork); EDX Wireless (Signal Pro FWA); Aviat Design; SAF Tehnika Path Calculator.
      Mapping & GEO Tools: Pitney Bowes (MapInfo, Vertical Mapper, MapBasic); Esri (ArcGIS); TatukGIS; QGIS; Blue Marble (Global Mapper).
      Call & Drive Test Data Collection & Analysis Tools: InfoVista TEMS Suite (Investigation, Pocket, Paragon, Sense); Accuver (XCAL, XCAL-MPM4, XCAL-Mobile & XCAP); Amdocs (Actix) Drive Test Analytics Suite; PCTEL Wideband Scanning Receivers; STI-9400 & Field Test 7; Qualcomm (QXDM Pro & QCAT); CommScope Invex3G Network Testing Tools; Grayson Wireless GSM Surveyor, IS-136 Surveyor, IS-136 Illuminator and PN Scanner; Keysight Nemo Outdoor Drive Test & Analyze Post Processing & Nemo WindCatcher Multi-Data Analytics Solution; NetScout (TrueCall, ISA); Device Monitoring & Analysis Tool (DMAT) tools for iOS and Android TRACE and Geospatial Visualization of 4G (LTE/VoLTE) and 5G (NR/VoNR) KPIs.      Propagation Model Tuning and CW Drive Test Tools: TTM/TMR, R&S TS8997 Wireless measurement system, for ETSI and FCC devices for ISM bands, Grayson Wireless Spectrum Tracker, PCTEL Wideband RF Scanners, BVSys (Dragon Dual-Band CW Transmitter & Gazelle Quad Receiver Sys).
      RF Test Equipment: Anritsu (Site Master, Cell Master & Cable Master, PIM Master), Spectrum Analyzers, Power & Watt Meters, VSWR Meters, Frequency Meters, Function Generators, Multimeters, Digital Levels, Azimuth Siting Scopes, Compasses, Binoculars, CVT Rod, IKE & Spike Laser Survey Tools.
      Troubleshooting, Trending, Performance & KPI Monitoring Tools: Watchmark Metrica/Kingfisher Service Assurance Software Platform Kingfisher, Ekahau ePerf; LBNL iPerf / iPerf3; Mycom (Performance Management (NIMS-PrOptima and e-PrOptima) & Network Optimization (MyPrOptima); Amdocs/TTS OptPCS; Amdocs (Actix) Network Optimization Suite.
      Vendor BSS Interface Tools: Ericsson: Ericsson Network Manager (ENM); Ericsson WinFIOL 7.0; Ericsson Mosshell (AMOS, RANOS, RNO CNA, NCS, FAS, MRR, CTR, and OPS), Nortel OMCR, CT2000, CT7000 (CT, CPT & Enhance CPT), and Siemens Radio Commander, NSN NetAct, Huawei M2000, Samsung BSM & LSMR.
      Regulatory Compliance Tools & Processes: FCC: ASR Form 854, ULS Form(s) 601 & 477, FAA: Form(s) 7460 (1&2). Towair, Air Space, EME MPE Studies: RADHAZ (Roofview), RCC (ComSiteMPE) & Waterford Consultants (RoofMaster), FCC AM Query for Tower Detuning Compliance and NEPA.
      Intermodulation Analysis and Interference Source Hunting Tools: RCC (ComSitePro 6.2) & UniSite (UNIstar), Interference Hunting: Anritsu (MX280007A & MA2700A and PIM Master); R&S (PR200, HE400).
      Operator Specific Tools: Beast, NSR (AT&T); Remedy, Insite, Iconectiv - Granite Zing, Aim and EDW (T-Mobile); ODEON {SPMC Network Service Investigation Tool} & Accruent (Siterra) {Sprint/VZW}; NWF, Zite, spLTE, RTT, VPI, FUZE (VZW), Glance, Sprint Vision, Appian, Atlas, Capstan, PRTS, Patrol (Sprint)

Training & Certifications:  a) OSHA 10 Construction Certification, Sept. 15, 2019, b) iBwave Design Professional Certification, online July 11, 2011; c) Award Solutions LTE RF Planning and Design Certification Workshop, Richardson TX, July 14, 2009; d) Atoll LTE Training, Forsk, Chicago IL, Sept. 2, 2009; e) Internal Huawei training for WiMAX and LTE product lines and EMS (M2000) platform April 2010; f) WiMAX Forum Certified RF Network Engineer, July 31, 2007; g) SMU UNIX Shell Scripting Boot Camp 1998, h) Ericsson Certified Wireless Systems Design Engineer, 1995.
Verizon Wireless Specific Training: a) VZW GeoPlan (LTE, CDMA 1x, EVDO) Training for Design & Regulatory Compliance, b) OET Bulletin No. 65, Radio Frequency (RF) Safety and Awareness, Antenna Configuration Design Guide for RF Compliance, VZW Operating Procedures and Rules on RFE Compliance & VZW Signage and Demarcation Policy. c) Waterford Consultants in person RoofMaster Training RoofMaster Interface, Modeling and Interpreting results, d) VZW Zite & RTT Training, e) Siterra Phase I Refresh Training, f) Actix Classic, g) ELTP & VZWPI Training,  h) Salesforce Sites Tracker, i) VZW RFDS Tool,  j) VZAtoll Forsk General Features & General Features Update, k) VZAtoll Forsk LTE Features & LTE Features Update,  l) VZAtoll Verizon Features,  m) VZAtoll Verizon Addition Features related to Siterra, E911, FCC Contours, n).VZW FUZE Intro Training, p) NetScout   TrueCall VZW intro Training (Heat Maps   RSRP, CIQ, Drops, Serving Cell, Exporting; Reports   KPI, NE, Subs, Call Table, Top Device, Strip Chart, Histogram, Overshooting, Exporting & Drill Down, Thematic Maps; Massage Viewer. q) NetScout Iris Session Analyzer (ISA).B&V Training: a) OSHA 10   Construction, b) RF Safety Awareness, c) CVT Rod Tower, Pole and Power Line Surveys. d) IKE Analyze and Spike training from IKEGPS field survey & measurement tools. e) Utility Pole Birthmarks, coms space vs. power space, field pole inspections for EOL/Replacement issues, etc.WORK HISTORY SUMMARY
(12/20   09/23) RF Engineer & Technical Project Manager, Monte R. Lee & CO, Oklahoma City, OK
Focus Supporting all MRL s Clients for any requests related to Wireless Network and Microwave Transmission Backhaul, FTTx, OSP, SONET & Docsis: Including for 5G NR, LTE, VoLTE, UMTS, HSPA, CDMA, EVDO, GSM, EDGE, GPRS, WiMAX Wi-Fi, 60GHz Terragraph, Fixed Proprietary Wireless (Cambium, Ubiquity, etc.), MW Transmission, Fiber Optics (FTTH/FTTB, SONET TDM, OSP Engineering, DOCSIS 3.x & 4, DSL and PoE:
      Managing FCC Broadband Data Collection (BDC) for Fixed Wireless Access and Mobile Wireless for over five clients in Oklahoma, South Dakota, and Alaska in 2022 & 2023. This included:        1. Developing detailed LTE & VoLTE minimum throughput link budgets.        2. Populating and uploading all required BDC data in the FCC Portal.        3. Generating all required ArcGIS coverage heatmaps and uploading to FCC BDC portal using Atoll or SignalPro.        4. Root cause analysis to correct and resubmit for error corrections until final acceptance verification form the FCC.      FCC BDC Propagation Model Calibration using NetScout   TrueCall virtual drive test data.      Design, deployment management and optimization of wireless telecommunication networks for the (700 MHz, 850 MHz, 1.9 GHz, 2.1 GHz, 2.5 GHz, 3.65 GHz, 5 GHz, 6 GHz, 11 GHz, 31 GHz, 21 GHz, 30 GHz & 60 GHz) Licensed and Unlicensed Bands for 5G NR NSA, 4G LTE, PtP, PtmP, CBRS, mmWave, long haul, high bandwidth, high throughput Microwave Transmission (with SONET, ATM and Ethernet configurations), MAS-SCADA PLC (natural resources OK and TX) with PoE power and AMI Mesh/PtmP Meter Reading Networks (public utilities).      Estimating costs and timelines for expanding, upgrading, and provisioning HFC DOCSIS 3.0 networks to DOCSIS 3.1.      Preparation of Technical RF Expert Witness Testimony for court cases involving LTE, WiMAX and FWA.      Completing FCC Form 477 annual reports for broadband, wired, wireless and VoIP services prior to the BDC.      Preparation of Microwave Frequency Prior Coordination Notice (PCN) Request Forms.      Bid Responses, Pre & Post FCC Auction Support for (RDOF, CBRS, CAF II, 2.5 GHz Rural Tribal Applications, etc.)      Oversaw Propagation Model Calibration initiatives for clients including test equipment and contractor selection as well as result verification and final report generation using Atoll.      In charge of in-house RF Design & GIS Tools including Atoll, EDX, Pathloss, iBwave, MapInfo, Global Mapper, QGIS.      Acquiring GEO acquiring data (terrain, clutter, clutter heights and vector data) for client projects, dealing with GEO vendor quotes and selection.      Managing NDA agreements with OEMs (Ericsson, Samsung, Cambium, CommScope, Aviat, BEC, NetScout, etc.).      Mentoring and guiding new graduate team members to help with the RF/MW work as needed.      Assisting others presenting at conferences including the CEO for CBRS and 5G.      Working with GIS Department on presentation quality maps for customer reports.      Helping clients with RF questions especially related to drive test tools, FCC BDC, propagation Model Calibration, rip and replace, remote hosted core, 5G NR NSA and VoLTE deployment.      Supporting MRL FTTH/FTTB Outside Plant work of any remaining legacy APON, BPON Network upgrades to EPON & GPON/GEPON (this included OLT, POS (CWDM/DWDM), ONR, EDFA/OA, TP& ONT counts based on client s central office location and the termination points based on GEO data like Google Earth/MapInfo and QGIS. Using Fiber Power Budgets to calculate Max Fiber Lengths, POS sizing and cabinet locations. Redlining of TP/ONT Drop sheets based on field surveys, designation of hand hole locations. Interfacing with regulatory for permitting, aerial to burial transitions due to right of way issues.      PtmP Terragraph network design using the unlicensed 60GHz band to support outdoor MAS-Scada PLC deployment for the natural resources industry in West Texas powered by PoE.(10/20   11/20) CBRS LTE RF Design Engineer, Sagetree Solutions & Networks Inc. (Remote, 1099 contractor) Focus LTE CBRS NSB/ACP: CBRS Band LTE RF Design for ATN International using Atoll ACP overlay (co-locations) design augmented by proposed Green Field locations for over 500 rural counties western and midwestern states for CBRS band acquisitions won in CBRS 3.5 GHz FCC Auction 105 that had ended in September 2020.(09/19   02/20) RF Field Engineer, Black & Veatch (Project Employee, Rochester, NY)Focus WiMAX CBRS Smart Grid and AMI: Assigned to work as a RF Design Engineer on B&V Iberdrola (Avangrid) Smart Grid point to multi-point fixed WiMAX CBRS project in the NE, US until project put on-hold in 2020 due to Covid19:      Field Duties: Link Verification Team Lead, BS Construction Quality, MW Tower Surveys, make ready surveys, CVT rod & IKEGPS wooden power pole surveys. Updating Asset360 Database and EDX SignalPro fixed WiMAX PTM Design based on CBRD WiMAX PtmP Link Test Verification results, preparation of Installation Packages (CD & BOM) and DRVV Templates.
      Design Duties: EDX Signal Pro RF WiMAX PtmP Re-design of certain Divisions following their addition to AMI and Transmission Resiliency CPE Targets by Avangrid to the FAN Smart Grid Network Design Project.
      Project Management: Preparing RF installation MOPs and FAN Network Design Requirement Documents.(04/17   08/19) RF Engineer III, Saigan Technologies Inc. (contractor Sprint, Overland Park, KS)Focus member of Central Region RF Engineering Support Team with emphasis of tasks related to design projects for the Central Region Markets: Primarily East Michigan, West Michigan and Toledo markets for CDMA 1x, EVDO, LTE, VoLTE and 5G NR cellular networks using Samsung & Airspan OEM Equipment in the 800, PCS & 2500 Bands all projects have included creation of related RFDS, CIQ and ACDs as needed for:
      Macro Network DOMU (Triband) upgrade project POR development and finalization.      Atoll Volte Gap vs. CDMA 1x analysis for Toledo, East & West MI.      Atoll VoLTE ACP EDT Optimization maintaining CDMA No Harm constraints for Toledo Market.      Stemming from VoLTE Gap Analysis results the Neighborhood Expansion (Macro & Mini Macro) NSB project including initial analysis of MLA (ATC, Crown, VB, SBA, etc.) candidates to meet the design requirements for the NSB Search Rings relative to proximity, location relative to existing sites and available Rad. Centers. Followed by candidate analysis and SCIP reviews then RFDS design for LTE (and CDMA in some cases) for these newly selected candidates and finally CIQ and ACD generation.
      2500 Massive MIMO Project modification of many DOMU and NSB RFDS to support Massive MIMO along with RFDS for CDU30 upgrades with generation of new CIQs and ACDs,
      Very heavily involved in all Mini Macro (small cell) Projects {Mobilitie, Self-preform (Sprint/Boost/Dealer Stores, Meijer, etc.), Turnkey (Extenet, Crown, Teleworld), Neo Networks, etc.} projects including candidate and SCIP approvals, RFDS, CIQ, ACD and using Atoll for UE Relay BH Donor viability determination. Sprint Central Region SME for questions related the Mini Macros for special case RFDS creation (small cell provides outdoor/indoor solution using Tappers, etc.) antenna questions, how to build in Atoll, Quasi Omni using remote antennas and Airspan questions.      Preparation and updating both the Central Region MapInfo 2500 Channel Plan Workspace based on Sprint Spectrum Team 2500 Frequency Plan updates and the TAC assignment map based on TACs pulled from PRTS for during RFDS and CIQ creation as well as the 1900 (1x/EVDO/LTE) BTA MapInfo channel workspace using Patrol Channel Pull.
      Central Region RFDS audits for all Marcos and Mini Macros in Central Region using Sprint Vision Dumps to find and correct RFDS errors.      Correcting antenna model and tilt assignment errors in Atoll using Patrol, Atlas, and Capstan dumps for Central Region.      Aided in monthly PNCT preparation for East Michigan prior to NRF PNCT automation.(02/15 - 04/17) RF Engineer, Primus Software Corp. (contractor Verizon Wireless, Southfield, MI)Focus RF Design, Regulatory & Special Project tasks related to VZW MI Regional Cellular Network for deployed CDMA 1x, EVDO and LTE Cellular Networks that use Ericsson/Nortel Technology in Upper 700, 850, PCS & AWS Bands.Main contributions: - Working on following in support of NSB, Ant. Mod., Carrier Adds and HP LTE projects in 700, PCS and AWS bands from a regulatory perspective. This includes:      Creating, checking, and correcting EA (RFDS) and there plumbing diagrams,
      Preparing RFCIQ data for NB and Mod Macro and SC Sites,
      Working with construction (and external site acquisition firms) on National Environmental Policy Act (NEPA - 144R & 5323), Endangered Species Act & National Historic Preservation Act (NHPA) Forms for NB and Mod Macro and SC Sites and the related Tower Construction Section 106 Notifications including Form 620, 621 and E-106.      Ensuring compliance of DL RSSI Coverage with all domestic and international border requirements (other US Carrier & Canada) i.e., no overshooting or filing requests for extension agreements if needed.
      Corrections and changes to RF Planning Tools if needed (antennas, tilts, losses, power, channel assignments, etc.) when errors were found in coordination with RF Cluster and SP Engineers.
      Running RFE regulatory studies for all tower structures or requesting and tracking EME studies for rooftops, and small cells, etc.,
      Working with Regulatory to reconcile any issues and differences between GeoPlan and VZReg found compared to FAA ASN, ASR, 1A & 2C with respect to total structure heights based on Tower Scan data,
      Completing the RF related parts required to obtain final VZW Regulatory using NWF and Siterra so that assigned projects can move to construction on time,
      Requesting and tracking AM studies for sites requiring this as part of their regulatory approval process so pre and post detuning can happen on time with construction,
      Review of closeout packages for any RF related issues (antenna and or RRH configuration errors compared to EA, or RL/IL/PIM issues) so GC Tower crews get requests for mitigation in a timely manner,
      Leading various special projects to reconcile errors in GeoPlan compared to OSS/BSM data in preparation for transition for GeoPlan to Atoll in September 2016. This includes:          Antenna Trials: Contractor leading day to day tasks for a number of antenna trails focused on comparing between antennas pertaining to similar families such as Hexport, Octoport to find the most suitable antenna from different vendors to achieve certain required coverage objectives to shape and shift LTE between bands in an attempt to elevate LTE congestion of lower bands (700) by shifting traffic to AWS/PCS bands using means other than just parameter adjustments such as LTE Load Balance as well as finding the best antenna for start of LTE 850 deployments moving forward. As well as trials comparing AIR21 to AIR32 and to see if it would be more effective not to move Ericsson AIR antennas from rural sites to the core areas due to their limited power capabilities for LTE.
          True up of all CDMA 1x and EVDO 850 and PCS channels to match BSM data 100%,
          GeoPlan Total TX and RX losses, LTE Radio Models (eNB/RRH   models and power levels), Tilts, Diplexers/Triplexers and TMAs, etc.
          Investigating GeoPlan LTE discrepancies for each site regarding radio types (RU: 01 & 02, RRH: RRUL, RRUS11 RRUS12 & A2 for bands B13, B2 & B4, AIR21 B4A/B2P & AIR32 B4A/B2P) based on OSS Dump.          Market point of contactor for NetScout   TrueCall rollout March 2017.(11/14 - 02/15) RF Engineer II, Avion Systems Inc. (contractor at Sprint, Lone Tree, CO)Focus Optimization and Network Performance Improvement of Sprint s Colorado market deployed CDMA 1x, EVDO and LTE Cellular Networks that use Samsung Technology) Following Sprint s network optimization, NPI processes using Sprint RF Performance and Network Status Tracking Tools (Siterra/Glance/Reveal/ODEON-Tableau /RF Cockpit/Samsung BSM and LSMR) for KPI Monitoring, Optimization and NPI of the deployed and expanding network in the Colorado [CDMA 1x {800/PCS}, EVDO {PCS} and LTE {FDD (800/1900) /TDD (2.5G)}] by supporting two market NPI projects:
    a) Top Gun: Performance investigation/troubleshooting of any (500x500) meter meshes flagged in CO by the Agoop server based on automated active and idle LTE performance data (accessibility, retainability, integrity, mobility and availability) collected by an APP activated on some users UEs followed by investigation of the worst performing grids using drive test data, current physical site settings and parameters and finally arriving at optimization and NPI recommendations (physical cell and network parameter changes as well as possible site additions) to improve performance of those violating grids along with tracking of before and after KPIs in attempt to improve and resolve or improve performance issues in those grids with poor KPIs.    b) Multiband (LTE 800/1900/2.5G) Optimization and NPI: A multiband and multi-technology cluster performance improving initiative for the Colorado Sprint market to improve accessibility, RRC failure and HO failure reduction for all 800/1900/2.5G, CDMA 1X, EVDO and LTE. This project was in an early phase with work entailing preparation of processes, trackers, cluster definition, drive routes, etc.      Worst performing cell investigation based on daily/weekly/monthly KPIs (CDMA 1x VBR/VDR), EVDO (CFR/CDR) and LTE (CFR/CRD) with respect to cause and solutions including modification of physical and soft site parameters and issuing trouble tickets for Sprint Field Ops and OEM Samsung to fix issues and improve network performance.      Lead identifying congested LTE clusters for traffic offload using planned future Small Cell deployment.      CDMA/LTE KPIs review following LTE 800 and/or 2.5G turnups of existing CDMA or CDMA/LTE 1900 sites as part of the OAR/OAC No Harm Reporting Process.(02/12-09/14) LMR PM & RF Engineer, Airbus DS (Cassidian Communications), Richardson, TXFocus Land Mobile Radio (P25, DMR, Tetra) & MW Backhaul for Public Safety, Transportation, Utilities, and Industrial      Lead and PM for several P25 LMR Public safety Deployment Projects across the USA.      Providing RF related technical sections for Land Mobile Radio (LMR) Public Safety (VHF, UHF, UHFT, 700 & 800 MHz band P25, Tetra & DMR and Paging) RFIs & RFP responses   including link-budgets, coverage design, traffic dimensioning for capacity and frequency planning to meet coverage, capacity, C/I and intermodulation mitigation between co-located antenna systems within KPI and DAQ Quality requirements using EDX   Signal Pro and Mentum Planet RF design tools.      Preparation of RF network designs, block diagrams, system configurations, MW point by point responses, bills of materials (BOMs) and cost calculations for customer proposals.      Performed repeater and in-building surveys and measurements to aid in the design and RFP process.      In-Building venue design included (court houses, detention centers, 911 call centers and airports) for public safety P25 and Tetra Technologies using iBwave for passive/active and hybrid DAS deployments including dedicated headends, BDAs, APs and DAS antennas followed by commissioning, turnup, troubleshooting, verification testing. and final customer acceptance. Vendors used were Comba, Fiplex, Avari, Skymira, Crossfire, ADRF, and Zetron.      Site selection (Co-lo and Greenfield) to meet LMR coverage requirements with the lowest cost and optimum TX/RX and RX only repeater mix.
      Prepared tower design configurations with respect to antenna mounts, height, standoffs, and best TX/RX antenna locations to meet DL/UL coverage requirements.
      Satisfy all FCC, APCO and RPC regulatory requirements wrt to coverage and interference contours using FCC ULS, ASR and Spectrum Dashboard information.
      Prepared and reviewed ULS FCC601 forms based on project s licensing requirements.      Working with APCO, FCC, Industry Canada, etc. for all matters related to licensing and regulatory (AM, MPE, FAA).      Propagation model calibration using RF Design Tools (EDX Signal Pro, Mentum Planet & iBwave).      MW Backhaul Link Planning at the RFP phase (route maps, path profile, radio, site surveys, SONET TDM) using Google Earth Pro and Path Loss IV.      Leading and supporting CAT (DAQ   Circuit Merit and Talk-out Drive Testing using STI equipment) and FAT Opto.(02/11 - 11/11) LTE RF Design Engineer, T-Force Inc. (contractor Ericsson USA, Plano, TX)Focus LTE RF Network Overlay Design Project for AT&T & US Cellular      Designing AT&T 4G LTE overlay network (TN & KY) and for US Cellular Knoxville, KY Market.      AT&T LTE overlay employed Atoll RF Design Software and JDSU AriesoACP, and Teoco Capesso ACP tools to achieve:  Optimum Coverage (RSRP), Quality (RSRQ), Dominance, SINR and Throughput within required AT&T KPI design target guidelines using approved link budgets for each bands allocated channel bandwidth and the link profile for the Ericsson LTE eNodeB maintaining proper Spectral Border Coordination and Contingency requirements.      Preparation of AT&T project progress and final review presentations.      Attending all related design review meetings with AT&T at market level and national HQ levels.      Moved in October 2011 to the US Cellular Team for LTE overlay design work for the Knoxville, KY market using the Mentum Planet RF Planning tool and its embedded ACP Tool areas included in this design (WVA, WVA, ETN, EKY & WNC).(12/08 - 02/11) Sr. RF Team Lead, Technical Services Division, Huawei Technologies, USA Plano, TXFocus CDMA, EVDO, WiMAX, LTE   worked on the following projects:Clearwire (WiMAX):WiMAX RF SME addressing Clearwire  s questions related to Huawei s WiMAX implementation for the deployed markets Seattle, WA & Hawaii, relative RF parameters, frequency planning, configurations, features, pre-launch optimization, troubleshooting and NPI.      Member of pre-contract & proof of concept Field Trial &Test Bed Team Herndon, VA.          Addressed aspects related to RF issues for the Field Test Sites in Alexandria, VA including RF parameter settings, physical configurations, drive test analysis, etc.
          Huawei RF representative meeting with Clearwire HQ R&D technical team addressing product feature questions.      Production of daily KPI trend reports for Huawei R&D at HQ for the Seattle, WA & Hawaii Markets.
      Member of Seattle, WA Market rollout and launch team.      LTE (FDD-TDD) vs WiMAX trials Phoenix, AZ.HiBeam Internet & VOIP Fixed WiMAX Project: Lead responsible for design, parameter configuration, deployment, acceptance testing and optimization of three small WiMAX networks (Marion, IL, Joplin, MO & Peoria, IL Markets).COX (CDMA/EVDO) Atlanta, GA: a) Initial contract negotiations for the design, deployment, and managed services from an RF perspective. b) Review and approval Greenfield RF Design and Propagation Model Calibration performed by LCC. c) Lead vendor negotiations and selection of suitable DAS integrator for required in-building venues in RI and Tulsa, OK. d) Managed RF Greenfield Macro and In-building RF Designs for Tulsa and RI Atoll and Planet EV RF Tools (LBs, coverage, Monte Carlo simulations, PN planning, etc.).Sprint, (CDMA/WiMAX):      Lead for Kansas City field trial supporting RF comparison between Huawei WiMAX and CDMA.      Managed end-to-end performance testing of co-located and/or shared antennas for WiMAX 2.5 GHz and CDMA2000 (1.9 GHz and 800MHz) using both the Sprint 3G and Clearwire 4G USB modems.Cricket [Leap], (CDMA/EDVO) Chicago, IL network launch Lead:      Aided with issues related to zoning hearings and getting some sites approved as DAS solutions.          Troubleshooting EVDO problem sites.          Tracking network KPIs to find problem sites needing further work.
          Managed Tier 1 & Tier 2 TAC support and troubleshooting duties during network launch and optimization working with Huawei R&D in Shenzhen and Shanghai to track, troubleshoot, resolve and close open RAN tickets in a timely manner, updated pertinent databases and inform all parties via email and over the phone including the customer of the final outcomes.          Analyzed pre-post drive test logs following parameter changes and any software patch loads to verify issue resolutions.(10/08 - 11/08) RF Market Lead, Amirit Technologies (Turnkey T-Mobile project, Islip, NY)Focus GSM/UMTS New Site BuildAmirit Technologies Lead for T-Mobile NSB turn-key contract activities in the Long Island, NY market: PM for 130 NSB rings in Western Long Island from initial Asset RF Tool design until final shake down and Insite activation including:      RF Design, Frequency Planning, RF data fill, antenna, and propagation model selection.      Review and redline of Lease Exhibits, Zoning Drawing & Construction Drawings (LEs, ZDs & CDs).      Zoning Hearings and Zoning Testimony Support.      Candidate selection & surveys, site acquisition support and coordination of candidate verification via CW tests.      Regulatory compliance (FAA Determination Forms, FCC ASRs, AM Coordination and Maximum Permissible Exposure).      In-building surveys and acceptance walks for DAS implementations using CommScope (Andrew) ION Series (ROF), miniRepeaters and ValueDAS Products.(04/08-09/08), Principal RF Engineer, EPCGlobal - Talascend LLC (contractor at Bechtel, Beltsville, MD)Focus   New Site Build & UMTS rollout AT&T Wireless: a) Working for Bechtel to support AT&T Site Acquisition for 180 rings: Design Walks, CW candidate verification, Regulatory MPE Roofview/Signage and Narda Walks, LE, ZD and CD redlines using ArcGIS and AutoCAD, Zoning Hearings and Testimony Support. b) UMTS850 Overlay market launch support (war room coordinator).(04/07 - 03/08) Principal RF Engineer, Amirit Technologies (contractor Sprint Nextel, Mahwah, NJ)Focus WiMAX Network Overlay Design:Design of overlay and greenfield WiMAX Network, for NNJ, CNJ NY:      Preparation of preliminary and final Co-location EBTS (RF Data Sheets).      PlanetEV and Composer Tool POC (point of contact) for all issues related to WiMAX Overlay Design in NJ (northern and central), LHV (Lower Hudson Valley) and LI (Long Island), responsible for PEV NRF Data Manager updates.      Propagation Model Calibration: Selection of CW propagation model calibration data collection candidates, review, and approval of the (CW drive routes & GC CW test setups), model calibration using CW data logs for the PEV Predict 4.0 CRC Model and tuned model site/sector assignment throughout the network.      LE, ZD and CD redlines; MW backhaul design, oversight of GC site modifications in the field; review of feeder sweep VSWR and PIM test results; review of GC final closeout packages.      Power Density calculations to comply with Regulator MPE requirements.      Identification of new WiMAX Search-Rings, candidate hunting, new site Zoning Hearing and Testimony Support.(06/06-04/07) RF Engineering PM, Nexius Wireless (contractor T-Mobile, Concord, CA)Focus GSM & UMTSPM supporting TMO Bay Area Sr. RF Market Manager in all day-to-day operational tasks, interface duties with Western Region and Field Support Center (FSC) for special projects, network performance and design improvements. Scope included:      Flagging of exclusions and special case sites not complying with FSC PCC (Personal Coverage Check) rules, tracking all non-compliance, and working with performance team to insure timely corrections.      Tracking Consistency Check violations then working with cluster performance engineers and BSS group to resolve inconsistencies, analyzing Parameter Compliance, and recommending settings per the FSC rules.      Overseeing radio removals and additions using EDW queries, RADAR (Radio Add & Removal Tool) based on both TPU (Traffic Prediction Utility) and RANPI TRX utilization metrics (Metrica) criteria. Working with the Performance Engineers for any exclusions.      Coordination with Western Region RF team for Frequency Plan Re-tunes mandated by the spectrum swap agreements with Cingular Wireless.      Special projects for management as related to budgetary estimates for upgrade of older BTS models.      Tracking sites rolled out incorrectly from an RF perspective, and of pending sector additions for NPI.      Asset database cleanup, Asset vs. Insite database matching and cleanup.      Cleanup differences between Insite and the E911 Scout Tool Database to facilitate the AutoProv process and PNC TRA/TPM/PCA tracking. Coordination with the E911 Team in the Iconectiv - Granite Zing database.      Working closely with NextG Networks (Crown Castle) on improvements and troubleshooting of problems related to indoor DAS and campus oDAS systems using both active ROF and BDAs as well as some legacy passive DAS systems in the bay area using Andrews (CommScope) and ADS (TE Connectivity) equipment.      Zoning Hearing and Testimony Support for oDAS and difficult locations in downtown SF, Marin & Monterey Counties.(05/04 - 05/06) Sr. Radio Network Engineer, Nortel Networks, Richardson, TXFocus GSM, GPRS, EDGE, UMTS - worked on the following projects:
      Team Lead Pulse Mobile, GTA, Guam: RF Lead for GSM Overlay Project, GSM 850/1900 overlay design over existing TDMA network followed by green-field expansion (design and optimization) and zoning work related to site adds.      Cingular, GSM Overlay Project Genesis, San Juan, PR: GSM 850/1900 Network Optimization for Conditional & Final Acceptance and AMR rollout.      RFQ Lead GSM & UMTS for presales proposals: DHS GSMR1900, AMX/Telcel UMTS overlay proposal 44 markets in Latin America.      PM for Cingular SE Region MNC change out project following Cingular AT&T WIRELESS merger.      PM Caribbean Cable & Wireless GSM Dual-Band propagation model tuning project.      Lead Dobson Optimization & Coverage improvement project: Supervision of drive-test, route design and site design change recommendations across US.      Nortel Tier 1 TAC team Lead T-Mobile frequency retunes using a new interference matrix tool for Manhattan, NY during GSM Edge role outs across the US for T-Mobile and RF PM for the same in NC & SC for Cingular Wireless.(03/04 - 04/04) Cluster Performance Engineer, Nexius Wireless (contractor T-Mobile, Chicago, IL)Focus GSM Performance: Custer Performance Engineer NPI to meet and improve KPIs, resolve trouble tickets and troubleshoot OMCR Alarms.(02/04 - 03/04) Sr. RF Engineer, EPCGlobal Talascend LLC (contractor with Bechtel, Chicago, IL)Focus New Site Build & GSM. Consultant working for Bechtel for the AT&T Wireless Best in Class (BIC) New Site Build Project for Chicago and IL, 400 Ring Network Expansion. Site Acquisition Support, Design Visits, CW candidate verification and Regulatory (MPE), redline of LEs, ZDs and CDs using ArcGIS & AutoCAD.(11/03 - 02/04) Sr. RF Engineer, Wireless Facilities International (WFI), San Diego, CAFocus New Site Build & GSM   worked on the following projects:      Lead for 200 Ring NSB Design, AT&T WIRELESS, Tri State GSM BIC, Paramus, NJ. Cell site candidate selection.      Lead for GSM NPI Project, AT&T WIRELESS, BAWA market GSM Homestretch NPI Project with over 300 sites.(04/02-10/03) Sr. Customer Service Engineer, Siemens ICM, Boca Raton, FLFocus GSM Overlay Design, Optimization/Performance, Project Management:Cingular Wireless, GSM850/1900 Overlay Detroit MI.      Initial overlay design: Antenna selection, link-budgets, meeting GSM coverage requirement KPIs vs. existing TDMA.      Market Compliance Lead for Lucia process ERP calculations due to stringent requirements for antenna and feeder sharing between GSM bands and existing TDMA.      Designed and maintained extensive excel databases to automate the process of ERP calculation and preparation of RFDS presented to Bechtel Site Acquisition team.      In charge of RF planning tools upkeep for the market.      Responsible for approval of all ERP change requests during optimization phase to insure FCC de-minimus compliance.      RF design, initial tuning, and optimization of various clusters in the market.      Coverage comparison requirements Lead for Conditional Acceptance (CA), including drive testing.      Post-Construction site audit PM for Great Lakes region (MI, IN, OH, WI) contracted to WFI: Tracking progress vs. timeline, QA and payment approval or rejections, helping to resolve bottlenecks, and making sure Engineering Change Orders to Bechtel were issued on time.(02/02 - 04/02) Project Manager/Team Lead E911 NSS Survey Project, Milan Consulting, Marietta, GAVoicestream Wireless - Turnkey project, Philadelphia, PA & Baltimore, MD   Washington, DCFocus E911 site surveys Project Manager and RF Lead for a team of engineers and tower crews performing Site Surveys to comply with E911 NSS requirements for the two markets. Duties included: E911 NSS Site Survey Database upkeep, training, and supervision of team members (5 engineers & 2 tower crews), survey scheduling, equipment inventory, etc.(10/01-02/02) Sr. RF Consultant, Data Workforce, LP (contractor Ericsson USA, Plano, TX)Focus   GSM RF Network Overlay Design, Prelaunch Coordinator/PM:      GSM overlay RF Design, RFDS Generation & Automation, Project Management and Pre-launch Optimization      RF War Room Coordinator working with Tier I & II TAC and Ericsson GTAC, for Columbus, OH, Cleveland OH and Dallas, TX.(7/01-10/01) RF Technical Support Engineer, Galaxy Engineering Services, Alpharetta, GAFocus   GSM New Product Trials & Marketing:Frequency Translation Repeaters, Consultant at Littlefeet, San Diego, CA): Assigned as to Marketing group at Littlefeet, a California startup producing a niche multicasting repeater like product called  SPICE  for GSM operators. Main duties included negotiations for product demo preparations and meetings with potential customers in Moscow, Russia, and Nanjing China.(05/01-06/01) Sr. Radio Network Performance Engineer, Ericsson, Inc., Richardson, TXFocus - UTRAN/UMTS/WCDMA R&D & Product Testbed: New Ericsson UTRAN Group closed after three months due to budget cuts.(01/00-04/01) Senior RF Consultant, Logica, Inc., Dallas, TXFocus   GSM Green Field Design, Prelaunch Tuning & Propagation Model Calibration for 2-way Paging, assignments:      Voicestream, Austin, TX: Greenfield GSM 1900 network design and optimization of Austin DFW corridor expansion for Waco, Temple, Killeen, Fort Hood Nortel BTS turn-up & optimization, scope included: Site build verification (tilts, azimuths & shakedowns), tweaking of cell parameters and frequency plan based in drive test analysis.      Project Manager PageNet, Dallas: Propagation model tuning using CW drive test data.(01/95-01/00) Wireless Systems Design Engineer II, Ericsson Inc., Richardson, TXFocus - GSM/IS-136 TDMA, Down-Banded Cellular TDMA. Major projects:      [Prelaunch Optimization/Tuning & NPI] ( 99) RF Lead Bell South, Radio Network Change out, Chattanooga, TN, TDMA850. ( 99) RF Lead SunCom, Radio Network Change out, Myrtle Beach, SC, TDMA850. (98) RF Lead PowerTel, Lexington, KY, GSM1900. ( 96) Southwestern Bell, Tulsa, Oklahoma TDMA1900.      [Green Field Design] Vodafone, Hungary, GSM1800. Airadigm, Network Expansion & Indoor Project Lead, Little Chute, WI GSM1900. WIND Dual-Band GSM Project, Italy, GSM900/1800.      [Design & Prelaunch Optimization] (97) FarEastone Wireless Dual Band GSM Project, Taiwan, GSM 900/1800. ( 96) Hawaiian Wireless Down Banded Cellular Oahu, DBC850.(1984   1993) Non-RF Engineering work as a: Electronic R&D Technician, Chief Engineer Battery
Manufacturing, IBMS Liaison Engineer Johnson Controls and Vocational Instructor, Technical Writer, Translator, and Interpreter. Details available on request.EDUCATION:
Completed some Graduate Course Work towards Ph.D. (24 credit hours completed only), University of Texas at Arlington, Arlington, TX.Master of Science, Electrical Engineering, Electronics and Telecommunications, University of Baghdad.Bachelor of Science, Electrical Engineering, University of Baghdad. Publications: "CMOS J-K Triflop", International Journal of Electronics."Six-trit multiplying analogue-to-ternary converter", International Journal of Electronics.Patent: US 8,805,433 B2, Aug. 12, 2014; "System and Method for Point to Multipoint Radio Survey".Work Authorization: US Citizen.REFERENCES & FURTHER DETAILS: Available on request.

Respond to this candidate
Your Email «
Your Message
Please type the code shown in the image:
Register for Free on Jobvertise