Quantcast

Production Manager Plant Resume Dallas, ...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Production Manager Plant
Target Location US-TX-Dallas
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes

Plant Manager Supply Chain Plano, TX

Plant Manager WestWorth Village, TX

Plant Manager General Plano, TX

Quality Assurance Human Resources Plant Manager Garland, TX

Production Operations Manager Forney, TX

Production Manager Lean Manufacturing Dallas, TX

Operations Manager Plant Arlington, TX

Click here or scroll down to respond to this candidate
Candidate's Name
Street Address  EMAIL AVAILABLE PHONE NUMBER AVAILABLEI am a results-driven, hands-on-leader with over 20 years in a manager position. An excellent record of Achievement and Advancement earned through demonstrated contribution to bottom-line results. Safety oriented minded with excellent skills in hazard recognition. Unique ability to successfully direct multiple projects simultaneously.SKILLSBehavioral Base Safety (BBS)Time ManagementHazard RecognitionCommunicationRoot Cause AnalysisLeadershipACCOMPLISHMENTSAssisted with development and implementation of Best-In-Kind safety programs.Lead safety initiatives that decreased workers compensation claims from 9 incidents in 2019 to 2 incidents in 2020.Instrumental leader in improving the Safety & Quality Culture at the McGhee facility.PROFESSIONAL EXPERIENCE3 Rivers Plastics April 2015 - CURRENTPlant Manager  McGehee ArkansasDirects and coordinates daily plant operations in a safe and profitable manner.Responsible for safety and development of 97 employeesResponsible for scheduling 4 extruders production lines and 2 Prewash lines.Initiated the process of having our Post Consumer Resin (PCR) to becoming FDA certified.Oversee the transferring of the final product (PCR) to the Little Rock facility storage silos.Monitor Inventory levels for 5 PCR stock items to ensure stock is available to meet customer demand.Lead continuous improvement activities and culture change in Safety, Quality and OperationsEstablished plant budgets and operate plant within budget.Exceeded financial targets achieved lowest company financials in 2017.Promote safety daily through site observations to ensure employees are working safely.Monitor working conditions and practices  halt any unsafe activities if deemed necessary.Order and track screen usage on all extruders.Ensure the employees have the necessary PPE and safety tools needed.Influence and coach other supervisors to improve quality and rates on all extruders.Conduct Hazard recognition audits and follow through on getting hazards corrected.Works closely with CEO/Owner to ensure the plant stays clean in compliance with OSHA.Report, track and follow up on all normal wear items on any moving equipment Forklifts Bobcats and BarkosMaintain schedule and monitor the 7 settlement ponds for the Prewash line.Created the Storm Water Pollution Prevention Plan (SWPPP) in compliance with ADEQ.Investigate root cause for any Quality issues and compile RAD Review presentation.Participate in quarterly process improvement workshops with our chief engineer.Belleville Shoe South(DeWitt & Forrest City Arkansas) 9/2004 to 1/ 2015Quality ManagerOversee and directed all functions of the Quality DepartmentReports to the Director of Quality and VP of Manufacturing of this 400-employee shoe factoryLead a team of 14 QA inspectors and two lead Supervisors.Implemented a Data Collection system that help reduce the defect rate by 5%Implemented a 25-point inspection checklist that every shoe mustgo through before leaving the plant.Sampling the process, Troubleshooting, Optimizing cycles and quality control setups through ISO 9001 certificationCertified ISO 9001:2008 Internal Auditor certified through Satra.Installed a One-Piece Flow (Lean Manufacturing Methodology) that improved production rate by 2%Implemented the incoming Raw Material inspection Procedure.Reported and maintained Belleville Shoe return shoe policy.Performs periodic internal audits and ensures departments perform timely follow-up action findings.Oversee the process for reporting and monitoring nonconformities.Leads periodic Quality management team meeting and ensures timely and appropriate follow up actions.This job required attention to detail, ability to multi-task, and knowledge of each product item.AGRI TECH SORBENTS (Stuttgart plant) 2/2000 to 9/2004Production ManagerReported to Plant Manager of this 25-employee manufacture of filtered carbon.Helped develop the process of making carbon from rice hull ash.Implement the safety-first program.Obtained Arkansas State Boiler license.Responsible for work schedule and appropriate staffing in all departments.Completely oversaw profit and loss aspects of operation.Coordinated with supply manager to improve vendor/supplier relations.Created two new training programs for 25 employees with a focus on staff safety, food safety and production quality to achieve reduced labor cost by 5%.Ring Can Corporation (Stuttgart plant) 9/1993 to 1/2000Production SupervisorReported to Plant manager of this 20-employee manufacturer of plastic containers.Managed the production floor and shipping and receiving department on my shift.Helped maintenance manager maintain the process of mold startups, grinder blades change outs, adjustments to the automated boxing machine and banding machine.Maintained control of all inventories within the manufacturing processes, including both raw material and finished products inventory.Monitored the virgin material incoming silos and maintained levels to accommodate production schedule.Monitored the SPC-based quality control program and conducted the tests throughout my shift.Served on safety committee.EDUCATIONDeVry Institute of Technology, Chicago Illinois (DeVry University)Business ManagementPROFESSIONAL ACCOMPLISHMENTS, LICENSES & CERTIFICATIONSCertificate of proficiency in management30-hour OSHA certifiedFirst Aid/CPR certifiedHigh Pressure Boiler License #HP22829*References available upon request*

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise