Quantcast

Store Department Resume Spring branch, T...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Store Department
Target Location US-TX-Spring Branch
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes

Inventory Control, Store Manager San Antonio, TX

Team Members Store Manager San Antonio, TX

Customer Service Ups Store Austin, TX

Sales Store Manager Austin, TX

Medical Billing Department Assistant Leander, TX

Customer Service Store Manager Austin, TX

Customer Service Store Manager Seguin, TX

Click here or scroll down to respond to this candidate
Candidate's Name
-Keep safety in mind  Wear PPE-Red vest executing 3PL  have leniency with them. Questions could come up.-ASM leading project at store level-Projects will likely start in Lighting Department.oBig department, a lot more electrical work involved, be readyoMake sure top stock removed  work with store (Chandelier top stock)oBe careful cutting wiresoMost likely the entire first week-Do not disconnect the entire P51 area and disconnect everything.-We should get out in front of the 3Pl work with the disconnects, when Red Vest resets bays, we come back and install fixtures in correct bays that they go in.oHillman product  do not need necessarily to disconnect since nothing movingoDoor locks, hardware bays that require lighting  they are getting moved, or adjacencies changing so we should go in by entire department and have electrician power down, remove lights and come back and install lights  install per the lighting guide.-There could be some lights leftover FYI-May make sense to disconnect the entire department-If we get into a store that has new LED lighting installed. Those lights should already be accurate as the LED retrofit company should have installed per the lighting guide.-Stores with LED retrofit  if we find cage (fluorescent) still existing, let Lowes know about it and they will ask us to remove the lights, get them to the right location. Hera LED lights will need to get ordered by store. Old canopy lights cannot be ordered. New LED needs to be ordered, or they need to wait for LED retrofit to occur to address.-Christmas week is a blackout week-Week of new years after Christmas  (4) 10-hour shift instead of working New Years Eve to avoid attendance issues.-Week 3  1 visit only on THURSDAY NIGHT ONLY-Week 6  1 visit only  the Field PMs gather information of work needed. More visits possibly needed.-If stores dont need us in Week 3, document this, but DO NOT come asking for CO in week 6 if they need additional days.oRequest to stores from FPM to stores = Y/N do you need electrician in Week 3. Rogers Electric suggested we do this.-Commack StoresoThe millwork desk will be moved. Confirm with store and make sure tech on site if needed.-Regular Millwork Showroom (non-Commack)  desk relocates, electrician relocate the lights above the desk and the power pole for the desk-PH has 3 of these stores. Stores will remove all the light fixtures from the cloud, but electricians will have to remove and take down the black clouds (cabled to ceiling)  dispose of them, and install racking where clouds are now with Chandelier pods, and Chandeliers must be wired. Coordinate with the ASM to find out when the lighting department is attacked so we can coordinate this.-Commack Millwork & Commack LightingoLarge lighting archesoCommack Lighting = 3PL will reset the lighting department (Apollo or ProVantage)  3 week resets.oCommack Lightings Start 12/27 (5) stores  we provide 2 electricians in those stores. More tearout  lots of relock to remove from arches. 3PL will tear out the arch and go back in with regular rack + fan cloud. We do not hang the fan cloud, only power the fan cloud and new area for chandelier pods. Get with 3PL and start power everything down on arches first, pull out relock  clean out ceiling, and then as they rebuild we will leave power for chandelier drops.oMillwork  remove flooring, relo desk  remove UFO light fixture in ceiling. Tear outs starting on Sun/Mon. 5 to 8 man 3PL team doing the millwork showroom scope.oRe-use existing power poles-Our responsibility is to power the cloud ONLY. Stores reclip the chandeliers and fans in. Help troubleshoot but not sole responsibility-Work with ASM to place the lights in a safe place. (Could lay in carpet rack or someplace safe)-We are ONLY working on P-51 bay lighting that have bays moving, however stores may request help. Repairing lights not working  be flexible. If team has downtime, help out.

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise