| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateCandidate's Name P.E. E-mail: EMAIL AVAILABLEQualifications Summary Tei: PHONE NUMBER AVAILABLEExperienced Professional Engineer with proven track record in leading diverse construction and civil engineering projects, from bridges to subway constructions. Demonstrated expertise in interfacing with key stakeholders, from owners to contractors, ensuring seamless project execution. Proficient in reviewing contract specifics, addressing potential discrepancies, and managing Requests for Information (RFIs) and Potential Change Orders (PCOs). Coordinate and lead progress meetings, ensuring strict adherence to quality and safety standards. Known for managing multimillion-dollar project budgets, consistently delivering under budget and ahead of schedule.Areas of ExpertiseRFIs & PCOsProject ManagementContract NegotiationInfrastructure DevelopmentQuality & Safety ComplianceBudget ManagementStakeholder CoordinationConstruction SchedulingCross-functional CollaborationStrategic Planning & ExecutionProfessional ExperienceTectonic Engineering P.C., Manhattan, NY July 2022 to Aug. 2023Special Inspector/Senior Field EngineerConducted special inspection in coordination with various Government Agencies and private companies, ensuring compliance with relevant standards. Supervised inspections related to Piles drilling includes, SOE Piles for NYCDDC, SECANT piles for NYCMTA, Micropyles for ConEdison, Deep Foundation Element piles NYCMTA, Helical Piles for NYCHA, and Steel H piles for NYCDDC). Also carried out Piles Friction Load tests. Managed special inspections covering areas such as Mechanical demolition, Building Structural Stability, Reinforcement, Fire retardation, Flood zone compliance, wall panels, and Roof replacement insulation in NYCHA projects. Oversaw preparation and dissemination of inspection and non-conformance reports, maintaining clear and effective communication with Client/Owner.Led inspection process of various types of Piles drilling, achieving high accuracy and efficiency, contributing to integrity of deep foundation construction.Effectively managed comprehensive special inspections across diverse disciplines, including Energy code, post- installed Anchors, Steel installation, underpinning, curtain walls, veneer, Fire resistance rated construction, Curtain wall insulation R value, Windows UL value, Storm drainage, brick masonry, sheeting, shoring, and Bracing in NYCHA, DOB and DDC projects.Enhanced quality control and client satisfaction by ensuring precise preparation and clear communication through inspection and non-conformance reports.Anjuman E Badri Mosque Construction, Queens, NY July 2020 to July 2022Resident EngineerManaged construction of Mosque, overseeing aspects such as dewatering systems (tube well), shoring, heavy concrete footings, Concrete columns & beams, concrete slabs, Parapet walls, roof drainage, sewer connection to city sewer tunnel, watermain, and insulation per NYC energy code. Analyzed construction drawings, prepared RFIs & change orders, and liaised with Designers, Owners, and Architects to secure revised drawings for DOB approval. Led meetings to guide Owner on optimal project delivery methods. Spearheaded selection process of General Contractor, Sub-Contractors, and vendors while overseeing schedules across civil, electrical, mechanical, HVAC, UV system, fire alarm, and AC control domains.Successfully completed project on schedule and within $10M budget.Upheld strict compliance, avoiding any City violations, and ensuring zero-accident environment throughout project duration.Prepared all documentation and inspections Civil, Mechanical, and electrical inspection and managed to achieve TCO.Submitted all paperwork to DOB for Certificate of Occupancy.K.C. Engineering P.C., New York, NY July 2006 to June 2020 Senior Engineering Auditor, NYCDEPAssessed and green-lighted Departmental of Environmental Protection (DEP) payment requests for Wastewater Plants across various locations, Clean Water Plants, and Pump Stations. Conducted regular site visits to evaluate work progression, ensuring alignment with contract drawings and specifications. Collaborated closely with project Resident Engineer, DEP Officials, and Consultant RE and OE to review change orders. Monitored potential overpayments to Contractors and discrepancies between tasks performed and contract stipulations.Reviewed and approved payments and change orders for Contractors and sub-contractors without delays.Identified and prevented potential overpayments, ensuring adherence to contract specifications and drawings.Turner Construction company New YorkSenior Project Engineer May 2000 to June 2006Senior Project Engineer: Jan. 2005 to June 2006. Involved in Meadowland XANADO's $200M, NJ infrastructural project, overseeing roofing, ACM & Aluminum panel and curtain engineering, and steel fabrication for C building of project. Responsible for field oversight during construction of foundation and steel structures anchoring bolts placement and steel erection. ensured precision in anchoring bolt placement and steel erection.Project Manager: July 2003 to Dec. 2004, Managed 1st & 2nd phase of AT&T/Cingular Switch, 50,000 sf switch center, consisting of integration of the triple redundant power supplies (with Owner venders, Owner telecom venders, generators battery backup and standard electrical services). Heavy emphasis on Mechanical and Electrical system, Fire Alarm and Fire suppression system. Managed completion of work and inspections by DOB, NYFD and Engineers on board per schedule. Project Engineer, July 2000 to June 2003, $110M. Renovation/Reconstruction of Atlantic Avenue complex in Brooklyn NYCMTA project. Coordinated renovation of 3 major NYC transit lanes including piling, sheeting, demolition, underpinning, excavation for passageway widening, New Elevators, new Escalators, new rails, new signals, platform floor and walls tiling, and new token booth. In charge of recordkeeping, submittals, daily correspondence, flagging request and approval, GOs request, negotiation and approvals, field inspection and submitting detail report of daily progress.Daniel Frankfurt PC, NY March 1998 to April 2000Resident EngineerGuided on-schedule rehabilitation of Lafayette Bridge over Amtrak, NYCDOT, handling tasks such as sheeting installation, concrete and steelwork, sandblasting, and painting of steel structures. The project was on hold for six due to design changes. I joined and restarted the project when a new design was approved.Managed documentation control processes and coordinated staff and safety measures; maintained effective collaboration with AMTRAK.Oversaw replacement of sewer and watermain.Organized regular meetings with key agencies including NYCDOT, contractors and Engineer on Board (H&S), contributing to project's timely completion with minimal over-budget expenses.N. Massand PC, NY, Feb. 1987 to April 2000Assistant Resident Engineer/Chief InspectorVarious Projects:Supervised 14 Avenue rehabilitation, Brooklyn, NY, NYCDOT/DDC. Work included removal of existing Asphalt, base concrete, construction of new sewer with 12" ~20" dia. concrete pipe using push in connection, construction of new manholes, house connection, new watermain with 12" dia. steel pipe, curb, 8" base concrete and 4" asphalt overlay.Supervised installation of 8' diameter water main trunk pipe at 143rd street between Wills Avenue and Brook Avenue, Brooklyn NYCDOT/DDC Project. Work included excavation Sheeting shoring and bracing, installation of 30' pipe with Crane, welding pipe connection inside and outside, Leak testing with compressed air. backfilling and restoration of street.Oversaw protective coating of 10 bridges in Queens and Brooklyn for NYCDOT. A team member of Steel structure inspection of Gowanus Expressway overpass, NYSDOT. Supervised the inspection team. Performed girders, crossbeams fasteners and bolting inspection. Prepared daily inspection report and submitted it to NYSDOT.Led rehabilitation: milling and resurfacing of Route 280 for NJDOT. Work included: 5 overpass bridge slab restoration, resurfacing Route 280 3 miles length. shoulder rehabilitation. Lanes marking and planting.Guided reconstruction of Amtrak Bridge and Route 59 near Nanuet Mall for NYSDOT, including new foundation, steel beams, milling and resurfacing of a 6-lane route.Education & CredentialsBachelor of Engineering, Civil Engineering The College of Engineering, Goa, India License No. 075493-01 Principal and Practice of Engineering (P.E.) NY & PA NICET IVOSHA Training - 30 HoursConstruction Project Management Online Course Ongoing |