| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateCandidate's Name
CHSTStreet Address S. Gemini Springs Dr.Kannapolis, NC Street Address
PHONE NUMBER AVAILABLEEMAIL AVAILABLEEMAIL AVAILABLE(This Resume only lists my pertinent work experience. My total work experience dating back to 1974 and most of my electrical construction experience beginning in 1999 is not included as the gaps in this resume indicate. Those employment gaps can and will be explained if requested and/or necessary.SAFETY PROFESSIONAL AND RELATED WORK EXPERIENCE:Site Safety and Health ManagerQualSafe Solutions--St. Louis, MO August 2023Present I serve as the Site Safety and Health Manager for GC Haskell on the Air Products and Chemicals, Inc. Corporate Hangar Project at the Lehigh Valley International Airport, Allentown, PA. I conduct Project Safety Orientations for project subcontractors; gather the required subcontractor safety documentation for the project; direct, coach, apply, and enforce the Haskell, APCI, and OSHA 1926 Safety Plans and Standards governing the site; generate the required inspection and other project forms as needed; conduct monthly ladder, fire extinguisher, first aid equipment, GFCI/electrical equipment, and fall protection equipment inspections and document them on the pertinent inspection forms; conduct daily and weekly documented behavior-based safety observations of the project's on-site subcontractors; complete and submit the Haskell-required weekly Safety Reports; conduct weekly project Toolbox Talks and other training as necessary; complete personal safety training online; render minor first aid to project personnel if necessary; ensure all project personnel are provided with, are wearing, and are properly trained to, and are complying with the project and OSHA Personal Protective Equipment requirements. Oversee the safe movements of the sites heavy civil contractors equipment movement while excavating an 18 deep trench for the sites drainage pipe, ensure their use of proper protective systems for their personnel entering the excavation such as their trench boxes and proper sloping of the excavation, ensure that the excavations atmosphere is tested before initial entry and subsequent regular monitoring of its atmosphere thereafter, ensure that proper fall protection is worn by manhole entrant and that the manholes atmosphere is tested before entry into at several different depths inside the manhole, and ensure the excavation is properly and completely barricaded before leaving the site for the day. Ensure that the masonry scaffold is complete with compliant guard-railing and is inspected daily by the Masons Competent Person. Ensure that the scaffold erector/disassembler wears the required PFAS while erecting and disassembling their scaffolding at heights above 6, and ensure that the work platform of the scaffolding has not been overloaded to avoid its possible collapse.NC Electrical Licensed Qualifier/Former Company EHS Manager Spectrum Security Group Concord, NC March 2023 Present I provide my NC Electrical Contractor License for SSG to meet the legal requirements of the State of NC for SSG to conduct electrical contracting legally in the State. I advise on NEC- compliant electrical and low-voltage installations and provide OSHA/EHS oversight and compliance for the company. I performed various monthly inspections, conducted weekly company-wide Toolbox Safety Talks, and ensured that SSG employees are equipped and wore pertinent PPE on their various worksites. Provided coaching and tutoring for interested SSG employees in AC electrical topics and National Electrical Code Articles and requirements. Safety Trainer and ConsultantYellow Bird Holdings Phoenix, AZ May 2022 September 2023 I conducted a training class in the USACE/NAVFAC 24-Hours Fall Protection Competent Person and associated aerial lift training for a YBH private sector client in NC on a temporary contract, on-call, as-needed basis. I conducted the training lectures; directed, observed; and coached the practical hands-on components of the training; generated, administered, and graded the final examination to students at the classes conclusions. I presented certificates to all students who successfully completed the classes for their training documentation. Site Safety and Health AdvisorStaffing Support Solutions-S3 Charlotte, NC January February 2023 I was contracted by S3 to Watson Electrical Company on the Dominion Energy/GC Strata Solar Solidago Utility Solar 27MW Project as one of several Site Safety and Health Advisors in Windsor, VA. Inspected, edited, and approved daily Job Hazard Analyses for Watson Electric work crews. Ensured personnel had and wore the required project PPE. Observed, coached, and corrected safety behaviors exhibited by Watson personnel on an ongoing continuous basis.Site Safety and Health ManagerDiversified Safety Services Belcamp, MD August 2022 I was contracted by staffing company DSS to Whiting-Turner Contractors as their Site Safety and Health Manager on their 40 Moore Project in Durham, NC. Site Safety and Health ManagerAdkore Megaforce Myrtle Beach, SC July 2022 August 2022 I was contracted by staffing company Adkore to West Georgia Electric Company as their additional Safety Manager on the new Toyota Battery Manufacturing Plant (TBMNC) at the NC State Megasite in Liberty, NC.Site Safety and Health AdvisorProgressive Safety Management- Charlotte, NC August 2021- August 2021 I was 1099 contracted by PSM to the General Contractor Batson-Cook Construction Co. for safety oversight of Levels 8 through Basement 2 Level in the new Charlotte Metro Duke Energy High Rise Project. I was released from the project by BCCC at the end of the shift Friday, August 27, 2021, without any explanation given to me for their actions. NC-VA Electrical Licensed Qualifier/Installation Quality & Safety Advisor Titan Solar Power, Inc. - Charlotte, NC July 2021- July 2021 Provided my NC and VA Electrical Licenses to meet the NC State Statute for electrical contractors such as TSP have a certified NC State-licensed employed in order to legally conduct electrical contracting in NC. Visited project sites around NC to inspect the work and safety compliance of the various TSP crews and advised their superintendents regarding corrections necessary to the installation to make it complete and electrically functional. Inspected, advised, and enforced safety compliance of the installation crews as necessary. Company Safety and Health Manager/Site Safety and Health Officer Adams Construction Group, LLC - Warrenton, VA January 2021- July 2021 I was appointed the Company Safety Director in May 2021. I served as the SSHO for the DoD/NAVFAC Repaintex Building 1580 Fire Alarm System Renovation Project at The Naval Surface Warfare Center South Potomac Dahlgren, VA. I conducted Project Safety Orientations for project subcontractors; gathered the required subcontractor safety documentation for the project; reviewed, edited, and revised the Activity Hazard Analyses (AHA) required by NAVFAC for the project's subcontractors; directed, coached, applied, and enforced the USACE/NAVFAC EM 385-1-1 Safety Standards governing the site; generated the required inspection and other project forms; conducted monthly ladder, fire extinguisher, first aid equipment, GFCI/electrical equipment, and fall protection equipment inspections and documented them on the pertinent inspection forms; conducted daily and weekly documented behavior-based safety observations of the project's on-site subcontractors; completed and submitted the required monthly NAVFAC Contractor Safety Self-Evaluation Audit; conducted weekly project Toolbox Talks and other training as necessary; completed personal safety training online; rendered minor first aid to project personnel as necessary; complete various electrical tasks as needed by the project and as directed by Adams Construction Group; opened and secured the project office daily. Site Safety and Health ManagerWalsh Federal- Pittsburgh, PA March 2020- December 2020 I served as the SSHO for the new DoD/NAVFAC P199 F-35 Aircraft Maintenance Hangar Project at Marine Corps Air Station Cherry Point, NC in its mobilization and early site work phase and as the SSHO for the P204 F-35 Training and Simulator Project. I conducted Project Safety Orientations for P199/204 subcontractors; gathered the required subcontractor safety documentation for the P199/204 Projects; reviewed, edited, and revised the Activity Hazard Analyses required by NAVFAC for both Projects subcontractors; directed, coached, and enforced the USACE/NAVFAC EM 385-1-1 Safety Standards governing the sites; conducted daily stretch-and-flex exercises and the COVID-19 Health Checks for our Walsh Project 199/204 Team; conducted random drug screens for Walsh Team Members when requested by Walsh Corporate; generated the required inspection and other P199/204 Project forms; conducted monthly ladder, fire extinguisher, first aid equipment, GFCI/electrical equipment inspections and documented them on the appropriate forms; directed/lifted and documented lightning stand downs in the Lightning Log; conducted daily and weekly documented behavior-based safety observations of the Projects on-site subcontractors; completed personal safety training online; rendered minor first aid to project personnel as necessary; ensured all subcontractor equipment was inspected daily and documented on the appropriate forms and submitted to the P199/204 Safety Office for proper filing; conducted initial and random drug screens for Walsh employees new to the P199/204 projects, recorded their results, and submitted them to Walsh Building Group East Headquarters.Site Safety and Health ManagerAll Phase Solutions, Inc. - Delray Beach, FL September 2019- February 2020 I served as the SSHO on the DoD/NAVFAC Hangars 1700/130/1701 P199 Early Site Demolition Project at MCAS Cherry Point, NC. My duties included reviewing and editing subcontractor Activity Hazards Analyses (AHA) and writing them myself as necessary. I directed, coached, applied, and enforced the USACE/NAVFAC EM 385-1-1 Safety Standards governing the site. I also conducted the Project Safety Orientation for new project personnel; coached, mentored, and corrected project workers on safety compliance; conducted daily walkthroughs of the project site observing the work and safety performance on it; completed a daily field Safety audit and recorded it; maintained the required NAVFAC running Safety Deficiency Log and ensuring that any deficiencies are corrected in the most timely manner by the subcontractor responsible for correcting them; ensured that subcontractors submit all their necessary training documentation and certifications on file at the project; obtained the necessary permits such as Hot Work Permits from the pertinent base authority; inspected monthly and maintain the project first aid and life safety supplies; attended and contributed to frequently scheduled meetings with NAVFAC and project management/subcontractors; ensured Safety Data Sheets were submitted for all hazardous/toxic substances brought on the project by all subcontractors; and all other safety-related duties for the project. Site Safety and Health ManagerSheakley, Inc.- Cincinnati, OH August 2019I was 1099 contracted to the General Contractor Gray Construction by Sheakley and served as their SSHO for Gray's new Bridgestone Firestone Tire Warehouse Project, Wilson, NC. My duties included conducting new project personnel Gray Construction and Bridgestone Site Safety Orientations; coaching, correcting, mentoring, and disciplining project personnel in appropriate safe behaviors and compliance; requesting, reviewing, editing, and writing when necessary Gray Hazard Analyses for our subcontractors as necessary and filing them in each subcontractors file daily; conducting daily behavior-based Safety Field Observations; participating in the project weekly subcontractors meeting; conducting weekly project-wide Safety Tool Box Talks; obtaining and maintaining the Safety Data Sheets record for all the toxic/hazardous substances that are used on the project. Site Safety and Health ManagerCORE Safety Group - Chattanooga, TN November 2018 to July 2019 I served as the SSHO for the GC Energy Systems Group on their U.S. Environmental Protection Agency project in Durham, NC, where I started in February 2019 until July 2019. My duties included conducting new project personnel Site Safety Orientations; coaching, correcting, mentoring, and disciplining project personnel in appropriate safe behaviors and compliance; requesting, reviewing, editing, and writing when necessary Activity Hazard Analyses for our subcontractors as necessary and forwarding them to our EPA contact for their approval; writing Daily Safety Briefs overviews of the project daily activities; writing weekly Safety Synopses of the projects week in safety; conducting daily behavior-based Safety Field Observations and recording them; keeping a running daily Safety Deficiencies Log; conducting a comprehensive ESG EPA Project Safety Audit and recording it; participate in the project weekly subcontractors meeting; conducting weekly project-wide Safety Tool Box Talks; keeping and maintaining all pertinent project safety files; initiated and awarding our monthly EPA Project Safety Star Award; maintaining the project safety bulletin board and inspecting and maintaining our first aid kit, blood-borne pathogens kit, and eye-wash station; obtaining and maintaining the Safety Data Sheets record for all the toxic/hazardous substances that are used on the project.I also served as the Site Safety and Health Officer for Energy Systems Group on the National Institute of Environmental Sciences and Health Utility Energy Services Project, Durham, NC, starting on 12/03/2018. My responsibilities included coaching and mentoring the various subcontractor employees regarding compliance with the site-specific safety plan. Also performed safety briefings, ensured subcontractors possessed and wore all necessary PPE, and ensured all daily/weekly/monthly safety and equipment inspections are executed, recorded, and filed. I was also responsible for preparing a Weekly Safety Synopsis of each week's activities. I was also subcontracted by CORE Safety Group to Trinity Safety Group for Nicholson Construction's Additional Drilling and Grouting Program Project at the TVA Boone Dam, Kingsport, TN, that commenced on 11/05/2018. I conducted daily pre-shift safety briefings and continuous observations of night shift personnel. I coached and mentored site personnel in safety excellence, competency, and compliance with the site-specific safety standards. I conducted and recorded daily written safety observations of personnel and work processes. I kept and recorded a daily Site Safety Diary. My assignment there ended on 11/30/2018.Site Safety and Health OfficerHardHat Workforce Solutions- Raleigh, NC January 2019 to February 2019 I was contracted by HHWS to E8 Energy Group as their SSHO on the DepCom Two-Mile Desert Road Solar Farm project in Winfall, NC. Conducted daily field observations; maintained and distributed Personal Protective Equipment to project personnel; produced and maintained various records including SDSs; administered minor first-aid when necessary. Site Safety and Health ManagerCivil Works Contracting, LLC - Wilmington, NC July 2018 to October 2018 Ensured compliance to and application of USACE/NAVFAC EM-385-1-1 Safety Standards on the F-35 Sunshades/Air Cooling Units Project at Marine Corps Air Station Beaufort, SC, for CWC and their subcontractor employees.Site Safety and Health OfficerParagon Safety Group - Raleigh, NC February 2018 to April 2018 I was contracted by PSG as the SSHO for Carolina Fire Control sprinkler constructors aboard the GC Turner Construction Co. Apple Sycamore Data Center Project in Maiden, NC. Performed daily behavior-based safety observations of CFC employees ensuring compliance with their compliance with project safety standards. Composed weekly Pre-Task Plans for CFC. Compiled, recorded, and filed with Turner all pertinent inspections and safety administrative documentation. Attended and contributed to Turner weekly Safety Committee meetings. ElectricianLHI-CTS Virginia Beach, VA January 2018 to February 2018 Ran 1.25" EMT for data/telecom circuits aboard MCB Camp Lejeune, NC. ElectricianTrade Link Resources, Inc. - Charlotte, NC September 2017 to October 2017 Performed various electrical construction tasks for T.R. Curlee Electric Company at the new Kannapolis Middle School in Kannapolis, NC.Field Safety Coordinator Strata Solar, LLC - Durham, NC May 2017 to August 2017 Coached and enforced the site safety standards for Strata Solar employees and its subcontractors for the Dominion Power Sappony 28 MW solar field project in Stony Creek, VA. Conducted incident/accident investigations and filed proper investigation documentation. Also, gave daily morning safety briefings to entire field crew, conducted daily site inspections and walk-throughs, and other tasks as directed by the Site Safety Manager. Site Safety and Health OfficerEdwards Electrical Services, Inc. - Meridian, MS March 2017 to April 2017 Provided safety consultation, enforcement, and training of EES employees in compliance with OSHA, General Contractor W. G. Yates, Inc., and EES company Safety Standards aboard the Mercedes-Benz Van Expansion Project in Ladson, SC. Conducted training in fall protection and aerial lifts for EES employees. Conducted weekly Toolbox Safety Talks along with weekly temporary lighting, GFCI protection, and project Safety audit inspections. Also performed monthly assured grounding, ladder, fire extinguisher, and fall protection inspections. Updated and kept employee training files.Site Safety and Health AdvisorParagon Safety Group- Raleigh, NC October 2016 to January 2017 I was contracted to Portland Construction as their Safety Advisor on their Smithfield Feed Mill Expansion Project in Warsaw, NC, until December 2016. From there, I went to a Dominion Energy/Sun Energy Solar Farm Project for one week in Moyock, NC, at the end of December 2016. Then, I was contracted to Hayden Demolition as their Site Safety and Health Officer for a demolition project at the Butterball Turkey Processing Plant in Mount Olive, NC. I was there for two days only in January 2017.Site Safety and Health OfficerPremier Electrical Staffing, Inc. - Wilmington, NC January 2016 to February 2016 I was contracted by PES to Lancaster Electric Company, Wilmington, NC, as their Site Safety and Health Officer for the GC Enviva Conveyor Project at the NC State Port, Wilmington, NC. I trained Lancaster employees in Aerial Lifts and Forklifts. Conducted weekly Toolbox Safety Talks. Developed Lancaster Employee Safety Orientation, Lancaster Safety Violations System, ladder inspections form, and Safety Data Sheets binder. Established project LOTO protocol and procedures from online sources. Responsible for the Project and Lancaster Safety compliance and enforcement by Lancaster employees. Write Project Daily Report for Lancaster Electric activities. Ensure copying and filing of project documentation. Solar ElectricianPremier Electrical Staffing, Inc. - Wilmington, NC November 2015 to December 2015 I was contracted to Strata Solar as an electrician by Premier Electrical Staffing. Ran 4" PVC underground for DC cables from combiner boxes to recombiner cabinet. Pulled source wire onto solar tables to harness connection points. Laid-out and assisted with installation of solar panels onto tables. Performed other assigned tasks at the Strata Solar Farm Project in Beulaville, NC. December 2015. I was contracted to Strata Solar by Premier Electrical Staffing.Performed insulation testing on solar panels source cables. Pulled source cables from panel drops into combiner panels. Fastened wire management clips to panels. Loom ENMC around cables entering weather heads from solar tables. Performed other tasks on the Strata Solar Farm Project in Albertson, NC, assigned by site foreman. November 2015- December 2015. Quality Control ElectricianCrowder Construction Company - Charlotte, NC August 2015 to October 2015 Megger tested conductor insulation to verify their integrity in combiner panels and inverter switch gear on a new solar farm aboard leased land on Marine Corps Base Camp Lejeune, NC, for Duke Energy. Also, ensured lug bolts are torqued to the appropriate tolerances in both locations as well. Take voltage readings on source wiring harnesses to ensure proper voltage produced by solar panels. Megger tested secondary transformer cables for insulation integrity. Performed other electrical tasks assigned by the Superintendent. Fire Alarm System/Life Safety ElectricianCCS Construction Staffing, Inc.- Raleigh, NC November 2014 to June 2015 I was contracted by CCS to GC Preston Electric Co. as the hotel fire alarm/life safety electrician on the new Stay Bridge Extended Stay Hotel and Suites Project in Jacksonville, NC. Pulled various cables through pre-installed raceways, mounted, and terminated wiring in fire alarm devices. Participated in the testing and commissioning of the fire alarm system with the Jacksonville Fire Department Marshall and Pinnacle technician. Mounted and terminated wiring for all exit and emergency lights in the hotel. Performed other electrical tasks as directed by the General Superintendent Joseph Preston. Site Safety and Health OfficerBryant-Durham Electric Co., Inc. - Jacksonville, NC February 2014 to October 2014 I served as the SSHO on the new DoD/NAVFAC 2nd Intel Battalion/2nd ANGLICO Complex Project aboard Camp Lejeune, NC. I conducted for new BDE employees and the employees of BDE's sub-contractors the Bryant-Durham Electric Company safety orientation. Ensured compliance of Bryant-Durham's safety plan, the general contractor's safety plan, and USACE/NAVFAC EM-385-1-1 safety standards by Bryant-Durham employees on the 2nd ANGLICO Intel Battalion project at MCB Camp Lejeune, NC. Ensured employee compliance with project specific Activity Hazard Assessments (AHA). Held weekly site "Toolbox Talks" for Bryant-Durham employees. Generated and maintained daily multiple Pre-Task Plans for BDE and all its subcontractors on the project and other daily and weekly administrative safety inspections and records related to the project. Cited BDE employees and recorded their violations of the BDE and Turner Safety Plans. Performed weekly safety audits and inspections, recording them on the appropriate forms and filing them. Performed accident investigations, wrote accident reports, and administered minor first aid when necessary. Notified and/or corrected the safety deficiencies of the other sub-contractors on the project when necessary. Attended and offered input as part of the Turner Safety Committee weekly meeting. Electrical ForemanALLCo Electric Co. - LaGrange, NC February 2012 to January 2013 I directed the installation of the electrical and fire protection systems (except for programming and testing) and ensured their quality installation per the National Electrical Code, electrical system plans, and job specifications on the new DoD/NAVFAC EOD Addition Project at Camp Lejeune, NC. Apply and enforce company, project, and USACE EM-385-1-1 safety standards by electricians and helpers. Conducted weekly Toolbox Safety Talks. This was a multimillion- dollars project, but I do not know what the cost of the electrical installation was. Electrical Field SupervisorEdwards Electrical Service -Meridian, MS March 2011 to June 2011 I directed and oversaw the installation of change orders to the electrical system at the new DoD/NAVFAC Wallace Creek - Phase I Dining Facility Project at Camp Lejeune, NC. Enforced and applied company, project, and USACE EM-385-1-1 safety standards compliance by electricians. This was a multimillion-dollar project, but I do not know what the cost of the electrical system installation was. I served as an electrician with EES from September 2010, until March 2011, when I resumed my Field Supervisor duties noted below: Electrical Field Supervisor/ElectricianEdwards Electrical Service - Meridian, MS March 2010 to March 2011 I directed and oversaw the rough-in for the fire alarm system in conjunction with the contracted fire protection contractor at the new DoD/NAVFAC 3rd Army Division Headquarters Project at Shaw Air Force Base, Sumter, SC. Also, enforced and applied company, project, and USACE EM-385-1-1 safety standards compliance by electricians and helpers. Also conducted Toolbox Safety Talks. I was on this project for six months, but transferred to Camp Lejeune, NC before its completion due to my wife's medical condition(cancer). I worked there as an electrician from September 2010, until March 2011 when I was assigned to oversee the change orders at the dining facility. This was a multimillion-dollar project, but I do not know the cost of the electrical or fire alarm system installation. Electrical Field SuperintendentGaylor, Inc.- Wilmington, NC January 2010 to February 2010 I assisted the various foremen in their responsibilities installing the electrical systems in the seven buildings of the new DoD/NAVFAC Wallace Creek Phase I Complex sub-contracted to Gaylor, Inc. by Edwards Electric Service. Also, I was responsible for applying and enforcing the company, project, and federal safety standards and their compliance by my electricians. Electrical ForemanGaylor, Inc.- Wilmington, NC October 2009 to January 2010 I directed the electrical installation of the new A-1 Administration Building on the new DoD/NAVFAC Wallace Creek- Phase 1 Project aboard MCB Camp Lejeune, NC. I also conducted weekly Toolbox Safety Talks, filled-out accident report, and administered minor first-aid when necessary. I was there from October 2009 until January 2010 when I was appointed the Field Superintendent. This project was a hundred-million dollars project, but I do not know the cost of the electrical system installation.Military Academic Skills Program (MASP) Instructor RMHS, Inc.- Woodbridge, VA May 2005 to September 2005 Instructed U.S. Marines at Marine Corps Air Station Cherry Point, NC in the Military Academic Skills Program. This was an intensive three-week course where I instructed U. S. Marines extensively in Introductory Algebra and Language Arts with some emphasis on Physical Science as well that aided Marines in increasing their ASVAB scores to make a lateral move into a more advanced Military Occupational Specialty upon reenlistment. Administered the pre-TABE test to Marines before the classs commencement and a post-TABE test at its conclusion. Assigned and graded daily homework in core subjects Mathematics and Language Arts. Kept and recorded a daily attendance and grading record on each student. Thankfully, all Marines showed significant improvement in their TABE scores after taking the class. I also generated and administered tests, graded, and recorded test and homework grades, and assisted Marines individually when requested.Craftsman Tools Sales AssociateSears, Roebuck, and Co., Inc.- Jacksonville, NC August 1994 to September 1999 Approached, met, greeted, and advised prospective Craftsman tool customers on making the best tool selection based on the work they need to complete, the tools functions and features, and the tools cost that all meet their needs and/or desires. Processed cash, check, and credit customer purchases and refunds through the counter electronic register ensuring customers received the proper change in return by counting their change back to them. Arranged, coordinated, and ensured customer delivery and installation details for large power tool purchases with the customer, Sears delivery crew, and trade contractors as necessary. Put up and took down sale signs and cleaned my assigned floor area as necessary. General Equivalency Diploma- GED Preparatory Instructor Coastal Carolina Community College- Jacksonville, NC May 1997 to September 1997 Instructed adult students of varying ages and learning levels in the subjects pertinent to sitting for and passing the GED examination in lieu of a high school diploma to better prepare the students to search, apply, and secure better employment. A required Daily Attendance Roster and GED test results were recorded, kept, and submitted to the CCCC Continuing Education Director for the State-required proper documentation. Most of my instruction was concentrated in the critical and more difficult subjects of Mathematics and English/Language Arts for the duration of the course. Homework was assigned frequently and graded in class to check and ensure each students adequate progress in their studies. Pepsi Cola Route Vending and Fountain Accounts Truck Route Salesman Minges Pepsi Cola Bottling Group -- Jacksonville, NC April 1990 to March 1994 Safely delivered canned Pepsi soft drinks to and refilled vending machines with product across Onslow County, NC, and removed all monies from each machine keeping the monies from each individual machines separate from others in money bags and safely delivered all monies back to warehouse office daily for counting and reconciliation for each account. Safely delivered Pepsi products boxed fountain syrup to restaurant accounts in Onslow County and received payment from the restaurant managers for every delivery. Generated an invoice for each vending and fountain delivery using the onboard computer/printer for the customer and for Pepsi records. Loaded delivery truck at the end of each day with Pepsi products for the next days deliveries using a warehouse propane forklift. REFERENCES:Christopher CombsPHONE NUMBER AVAILABLEEMAIL AVAILABLEChris was a former electrical apprentice and coworker at Intrastate Electric Co. in |