Quantcast

Business Development Project Manager Res...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Business Development Project Manager
Target Location US-GA-Rome
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes
Click here or scroll down to respond to this candidate
Candidate's Name
Address: Street Address  // (CELL) PHONE NUMBER AVAILABLE // EMAIL AVAILABLEResume Summary & Information: REQ #:SUMMARY OF QUALIFICATIONSMotivated achiever:Expert with PhD in R. E. Engineering Product Development, DC Blocks, Programs & Project Engineering, low and high voltage product development Inverter/Drives ExpertMBA in (International Finance) very experienced in C-Level and Director Level discussions, complete engineering to renewable market understanding, and strategic interface, and contract negotiations skills renewables (Solar, Battery & Wind)business relationship and trust, establishing RFP, RFQ, RFI, and building / reviewing / delivering within the Construction EPC & Renewable Markets,KEYS to success are understanding clients relationships.Majority of the work is in managing and training in business project development with technical solutions to field coordination, power electronics, DC/AC development, engineering battery storage DC Blocks, Inverter design/build, X-former interface to POIDeveloped bidding software for solar and battery storage, teaching and development of basic operations of technology, training on all RE Technologies, Assisted in design/build Copper Mtn 1 & 2 Henderson NV and (Wrote AFC/CEC: SES-Solar Two, 750MW solar project which was adopted by CEC)Execution of Risk Asset Management market tasking, with field integration and problem solving management with the team, Aspin risk assessment modules, E-Tap electrical design, AutoCAD, with PVSYST MODELS, SAMAs PMO/PM with Siemens, professionally managed project as small as $500,000 to large projects at GTMO - $456MM Siemens, Guantanamo Bay, Cuba Naval Base, and a variety of large P&L responsibilityExcellent interpersonal skills, risk development with critical asset management, lecturing and training (Last Lecture was in Austin Tx @ Clean Energy Summit, 2022 with 650 attendees)Always developing trust and value within all clientsWorks well with in a team setting and is very high energy, self-starter that drives success.Keen ability to resolve issues cleanly without creating damage control.WORK HISTORY2022Nov  Present, Contract Spencer Ogden to Mitsubishi Power/BESS Group
Director of Hardware Design for DC Block to POI, manage a team of 4-6 engineers for DC Block:Nov 22 - Correction of prior administration design of Clou DC Block FEA findings prior to deployment, and Late December 2022-started by writing Narratives required to align new specification for new DC Block and this was for on all equipment, systems, subsystems, all critical safety equipment, FSS detection/protection with installation, dry pipe, racking, floor drainage, AC/DC panel board, PLC controls, ventilation NFPA 69, (3) battery vendor modules, DC Collection, Fusing, Communication Cabling, wire management, UPS, Inverter, cable raceways, etc. Finishing narratives Jan 23, and immediately start all Electrical system and Mechanical system design. By April 23 completed 60% design freeze new BESS for Mitsubishi. May 23 completed all 90% construction ready drawings Electrical and 2D & 3D mechanical drawings with start of the FEA which preliminary show good, high zone 3, low zone 4.Designed the DC Block to handle = 3 MSA for 3 different 300+ Ah battery OEM vendorsHired 3 engineers to assist in building MHI DC Block first order. Jan 23-Mar 23In clean up mode red line pickups, Contract Mfg equipment changes, and quoting jobs.Finishing up the FEA container analysis, chiller piping final configuration, NFPA 69 Ventilation system, DC Panel Board, and AC Panel board all Meet High zone 3 & Low 4Battery MSA 3 corporate battery modules vendors to integrate to the rack, design DC block to disconnect, Control Panels AC/DC, Design Chillers, Ventilation NFPA 69, NFPA 855, NFPA 673, 9540A, 9540, 1973, etcRack to container, chiller, ventilation, Fire System with dry pipe, 3D & 2D developmentManaged 4-6 engineers for this developmentDeveloped software for bidding projects for Mitsubishi/PREVALON will be the battery storage start up that I am building product for right now.2021Dec  2022Nov, NIDEC Industrial, Cleveland OH, (Remote Atlanta GA) Principal Lead Technical Engineer & Technical Business Development Trainer for US Management  BESS storage, Projects Included building a team to execute BESS projects.Solely responsible for Shell NE Enterprise Framing Agreement (EFA) vendor approval, Tier 1 Power Vendor for SNE, motors drives, inverters, converters, with all design, substation gearConsult with SNE on project sizing Solar and Battery Storage, completed developing ES 1500 Nidec  1500Vdc to 690, inverter and DS 1500 Vdc converter assisted in developing and producing the AD7000 IGBT/and LCL filter system for these drives hold 4 patents on software programing algorithms and drives base line for the company in Lyon FranceWork well in team atmosphere & responsibilities, build a proposal & engineering Team, with sizing software built internally at Nidec, and all software required to bid This software development now has Nidec competitive in bidding projectsResponsibilities, build an engineering team of 6-9 crew team members, which will handle all proposal engineering, product engineering, and integration engineering with field service and client-based assistanceResponsibilities, to design, build and integrate all areas of BOM, base design and specifications for all equipment to be integrated for BESS requiredResponsibilities, design workflow for the manufacturing facility here in Cleveland, OH...NOTE: as of today, 7-9 crewmembers just in engineering teaming is two, 1 tech and myself.So basically, I was responsible for all BESS design, build and integration with ONE crewmember and myself Worked 16-18 hours a day since December and the refusal to get help has created the need to look elsewhere for employment.2016Nov  2021DEC MMR GROUP (EPC), Baton Rouge, Louisiana, Dates Employed May 2017Sr. Programs/Projects Manager  Distributed Generation Solutions-BESS Business Development and SalesHybrid Microgrid Distributed Generation  BD, Bid Development, Submittal, Assign PMsBattery Storage coupled with solar where applicable interface with a microgrid,Use client baseline to enter new markets, grow the business from having trained responsibilities and what is required to all coordination personnelDeveloped Strategic Alliance with a major battery storage integrator, & civil EPCCompleted Business Development pipeline sales of 3.5MMUSD first yearDeveloped the market strategy to execute 2018 growth, moving above 7.5MM$ in salesMeet clients to ensure goals are met, develop, and maintain project schedules, controlled P/L budgetsConduct site observations, monitor all job sites, and site startupsUsed Hybrid-Microgrids mythologies for fine-tuneoPaired Equipment Solutions (PES), switchgear and transformer designsoInverter dc/ac power conversion and Battery Sizing,oReview engineering mechanical and electrical layouts, Ancillary FeedbackoAuxiliary Circuit Services, and single point of contact to client/customer base.oExecuted ON-SITE RISK Management approach for the distributed energy resource.Accomplishments: (within the first 3 years 2016-2019)Built an engineering team, marketing & sales platform, trained all personnel for BESS market Pipeline of Execution;o(DSS), 4- Circuit West 4+MWh Battery Storage Build with a 2 circuit Hybrid Microgrid Solution, Michigan Based Project.o(GSS), 2-53' Containers, with full automated controls, 3.5MW @ 9.63MWho(GSS), 2-53' Containers, with full automated controls, 3MW@9MWho(GSS), 2-53' Containers, with full automated controls, EMAIL AVAILABLE2012  2016 Siemens PG/IE Guantanamo Bay Cuba, & Washington DCSiemens Government Technologies (SGT) 211MM$, Technical Program/Projects Manager (PPMO), U.S. NAVAL BASE, Guantanamo Bay Cuba,Established the Bid Development Template for all Renewable Energy Work, organized work schedules, day to day routine, training, safety understanding on all projects and set up personal accountability programGTMO-Certification(s) PM & PMO: AAPM-IPMP, PM@Siemens, Cat: S, C, B, A - $Range-100M-211MMReviewed, guided, and drafted ESCO proposals with TEAM (16 Months)As PMO GTMO, managed development of the entire Provisional Acceptance PA ESCO ModelPhase 1 was Provisional Acceptance (PA), deliver with pricing of 11 major (ESCO) Projects, with contractor review and develop score cards (Won Project)Directly managed the entire build, 2 Allison 501K, 14MW Solar and 8MWh Battery Storage2006  2012 ABB, Inc. Memphis, TennesseeMarket Development Manager, Promoted/Director of Wind & Solar-ABB/EPCCreated a vision automation team (VAT) engaged in critical power equipmentContinue to develop & define Paired Equipment Solutions (PES)Understanding clients needs coupled to added value by monitoring Material & Labor Cost Analysis, Equipment Logistics,Negotiated, Designed, & Completed 3 major projects, 9MW total, 27MMUSD total, profit 15%-4.1MMUSD-approxProvided Direction & Vision developed Power-Business Plan with updating Tactical Summary Sheet implemented a RISK LOOK at Mission Long Range Tactical Plan for projects, with Field QA/QC Plan and a very dynamic Safety-First oversight, for monitoring Critical Project Equipment and installation methodologies, 2013 Saved clients 23% on down equipment, poor installation, etc.2002  2006 Henkels and McCoy Bluebell, Pennsylvania Project Manager/Engineering Manager Sales Development/Director Power GenerationGreater than 11 years experience in Renewable Energy Business in wind and solar (Thermal & Photovoltaic) markets, business development, bidding team coordination, and execution from PMO/PM manager. Building corporate improvement processes in combining the business development client relationships coupled with the engineering team focus, category management & supply chain management, and brings a universal focus on business market and profitability.(Publishing technical documents, and technical lectures)Proven PV track record of current successes pass 11 months of continued client relationship success with current Northfield Mass Solar Project  2MW, Carlisle ISD  1.2MW, PSEG/Edison Training Center  1.0MW, Mt Tom  2MW, McAdoo  6.7MW, Canada 10MW.Proven WIND track record of current successes (Sold & Contracted), pass 17 months of continued client relationship success with current; All of these jobs are Down Tower BOP, Collection System, T-line and interconnection; Bent Tree WF  Blattner - Boldt Const, Gratiot County WF, Lee DeKalb WF - Blattner, Pioneer Prairie WF - Blattner, Settlers Trail WF, Trinity Hills WF  BP, White Oak WF  Mortenson.2000  2002 DRS Technologies-Finmeccanica Milwaukee, Wisconsin Sr. Engineering/Business Development Engineering ManagerKey responsibilities were to develop a market strategy to enter the Renewable Market using newly developed power equipment for wind and solar. Build Network of target companies, engage and close. Over nine months, Engaged & Sold to Clipper Wind, the stackable 500KW IP for the 3MW turbine.Responsibilities also included negotiating with different levels of governmental and regulatory agencies including NERC, WECC, FERC, IRC, CPUC, CEC, EPRI, IEEE Standard Association, and other regional and national electrical planning, operating, and marketing agencies.Assisted in the Development of 2 inverter breadboards for the new DRS Inverter Package, 1-PV and 1-Wind, not to exceed 1.2 MMUSD NRE budget. I hold the provisional patent on the segmented wind inverter.1994  2000 Utility Resources Group New Orleans, Louisiana Director Operations/Owner & OperatorThe job was power services, installs and designs electronic measurement equipment for power monitoring and analysis software for electrical and a variety of utility corporations. This department is responsible for rapid development and deliverables in Electronic and Electrical Design, Electronic & Hardware Monitoring, Basic Maintenance and Installation for power utility grid transmission and substation, refinery corporations plant assessments.1978  2000 United States Navy (11 Years Active, 9 Years Active Reserve)Naval success by advancing from (E1/E5-Enlisted-Nuclear Power to Officer-01/04) Officer-Fossil and GE Gas Turbines power plant management *Certified Engineer of the Watch (EOOW) and SRO on the 2 nuclear subs, on all 7 ships *Planned and wrote critical emergency procedures* Certified in Waste to Power, Steam fossil fuel and Gas Turbine Inspector, Reduction Gear bearing and gear inspector *Certified Turbine Mechanic and bore scope compressor and power turbines, Allison, GE, Westinghouse, Rolls Royce and steam systems, Allison and Babcock and WilcoxEDUCATION Doctorate of Philosophy; Ph.D. (Comprehensive Means (EPC) of Photovoltaic Installation) Warren National University  Aurora Hills, California // Master of Business Administration, International Corporate Finance American Intercontinental University  London, United Kingdom // Bachelor of Science, Environmental Physics Engineering & Computer Science University of Texas (Permian Basin)CERTIFICATIONS Project Management Professional Certification, Master Risk Manager Certification, Senior International Project Manager (S, C, B, & A Level), Navy Nuclear Power Plant Certification, Power Systems Operator, Certified Gas Turbine Inspector, GE, Westinghouse, Rolls Royce and Allison Power Train & Compressor, Certified High Voltage Maintenance Switchboard/Breakers and Relay Operator

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise