Quantcast

General Electric Project Manager Resume ...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title General Electric Project Manager
Target Location US-IL-Chicago
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes
Click here or scroll down to respond to this candidate
Candidate's Name
Pidgeon Forge, Tn. Street Address
EMAIL AVAILABLEPHONE NUMBER AVAILABLEAvailable for relocation. Seeking a Manager or Senior Manufacturing Process Engineer position. Making a difference.Work ExperienceLead Project EngineerL & T Technical ServicesWhirlpool Corp.Sept. 2021 to CurrentRobotics & AutomationSaved 4.5 million dollars by implementing automation programsSavings of 71 operatorsROI of 1 year on 9 separate projectsMS Project, Power Point, Excel, WordProject ManagerInspiration Home  Sevierville Tn.Dec. 2020 to June 2021Set-up 2 factories for new equipment and increased productionLaid out all equipment placement with required utility placementWrote processes to support new additions.Worked at home due to covid 19.Bethell, Oh.April. 2020 to December 2020Tore out and installed hundreds of feet of wood post and horse fence.Tore out inside of barn, installed concrete floor and new manufactured horse stalls.Senior Project Manager NPI ContractRobert Half Inc.  Hebron,Ky.Jan. 2020 to March 2020Brought in to install distribution factory for heavy truck parts.There were 8 packaging lines installed.Two automatic bagging linesThe lines were installed and running production in 6 weeksSix Sigma along with 5S were incorporated for savings.Wrote sequence of operations, and process design.Senior Project Manager Professional, NPI & NPDFerno Washington Inc.  Wilmington, Oh.October 2018 to October 2019Lean manufacturing cells in a lower volume mix of FDA certified products.Six sigma along with 5S to attain savings.Wrote sequence of operations, and cell timing.Used VKS program to write work instructions.PFMEA, RFQs, Capex, Program Justification.Vendor selection and follow-up for tooling and design.MIG & TIG fixturing for manual welding.MS Project to track timelines with deliverables, and critical paths.OL/OP CertificationsSenior Project Manager, Automation and RoboticsHoneywell Intelligrated - West Chester, OHDecember 2016 to October 2018Introduction of lean automation cells into a lower volume mix of manufactured products.Defined, concepted, and managed all robot MIG weld cell builds and integrations for welding and material handling.Realized savings of $2 million per year savings on Robot Cells, with an ROI of 1 year or less.Worked with suppliers for controls and software requirements on new equipment purchases.Wrote SOW for RFQs, Capex, Program Justification, and Vendor Selection.MS Project to create program timelines with deliverables, and critical paths.Quality Improvement Project EngineerGeneral Electric Appliances - Louisville, KYJanuary 2014 to December 2016Introduced Cognex vision systems into production to quality check hand lay-up dishwasher racks before welding.Worked with internal customers and suppliers to define software requirements of the vision system.Carried this vision system into 3 other cells and was able to reduce overall scrap from $7000 per day to $ 2000 per day.Chose and worked with the supplier to incorporate the vision systems into production.I wrote new lean processes for sub and final assemblies. By planning out 3 months ahead of current production, we have been under operating plan budgets for the first six months of the year, and at operating plan budgets the second half of the year.Sr. Lead Manufacturing Project EngineerGeneral Electric Aviation, Evandale, OhMay 2011 to December 2013Designed lean manual and automation to accomplish welding, assembly, painting, de-burring, and inspection cells.Utilizing lean principles, I introduced a new state of the art robotic cell for drilling 1800 close tolerance GD&T True Position holes in an aircraft assembly. A robot cell where the robot position was being controlled by a laser tracker.By using this system, there was a savings of $13 million per year on a 3 year firm fixed contractCreation of cells to do Deburr, an automated paint line with limited material handling, and an overhead powered rail robot drilling station.Process, timing, sequence of operations and throughput.Robotic MIG and TIG weld cellsWeld and assembly fixtures.Manager, Manufacturing EngineeringBAE Systems - Fairfield, OHFebruary 2009 to May 2011Designed Production Lines for Government and Armored Vehicles, Process Development, Sequence of operations with timingResponsible for launch of new programs, creating new and optimizing existing production processes for cost reduction and improved quality, throughput and first time yield.Also responsible for 18 manufacturing engineers, 2 robot programmers, and a 325,000 sq. ft. manufacturing facility.Implemented standardized launch criteria for new programs that included manufacturing and quality plans, PFMEA.Drive lean Manufacturing Principals, Kaizen Events, 5S, and comprehensive PM (preventative maintenance) schedules for tooling and fixtures to begin at program start-up.Planned with maintenance to order and maintain spare tool & fixture parts to limit production downtime.IPT Team reviews of Product Designs for DFM, and DFA, Tool Designs, and Advanced Part Quality Plans to ensure adherence to PPAP, DFMEA, PFMEA, guidelines and requirements.I introduced use of a new Laser Tracker for inspection, set-up of production tooling, and tool calibration.MIG manual weld fixturing, and a 1 million dollar robot MIG cab weld cell.Engineering ManagerEdag Productions LLC  General Motors, Tier 2Auburn Hills, MIAugust 2001 to January 2009Designed Tomcar Off-road Vehicle Body Shop Complete for three vehicles.Supplier Development, Product Development, New Program Launch, and Business Development.Responsible for quoting and business case development for new product designs, launches, lean manufacturing process, production line designs, and timing throughput.Designed and implemented production line to build complete Tomcar Off Road Side x Side vehicle. I worked with suppliers in USA to manufacture a newly designed wiring harness, MIG welded frames (3) styles, and other complex vehicle components for high quality with competitive pricing.Working extensively with suppliers in Taiwan, China, and the USA to supply parts and assemblies of high quality and low price. The following new products included front and rear coil over shocks, aluminum three and four core radiators, a complete exhaust system with catalytic converter, a new rack and pinion assembly, aluminum wheels, steel gas tanks, and miscellaneous machined components.Cost saving benefits of $20 million dollars over a five year period achieved utilizing Asian & Chinese suppliers.Provided engineering support and direction for EPA certification programs,Robotic MIG Weld and rivet cells.Set-up various water, air quality, and hazardous waste disposal compliance testing for government, state, or city permits. Managed up to 45 employees in different disciplines. Project manager for Robotic Hem Cells. I oversaw the design, build, installation at General Motors, commissioned and brought into production.Catia Design ManagerJ.S. McNamara Inc  Chrysler Tier 1, Warren, MIAugust 1994 to July 2001Senior Project Manager Tool Design Supplier DevelopmentBoeing Commercial Aircraft - Seattle, WAJanuary 1991 to August 1994Supplier Development, ContractMcDonnell Douglas Aircraft Co - St. Louis, MO September 1987 to January 1991EducationOakland UniversityB.S.E. / Mechanical Engineering. 3.5 GPAGE AviationGreen BeltMasters Certificate in Management and LeadershipNotre Dame Mendoza School of BusinessContinuous Quality Improvement, Project Management, and CatiaDefense Acquisition University, Boeing AircraftMicrosoft Office (15+ years), Catia (15+ years), Process Development (15+ years)Project Management (Systems, Robotics and Automation 16 years), Supplier Development (20 years), Envio (15 years), Capex and Justification, Work Instructions.

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise