| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidateCandidate's Name
Street Address
C PHONE NUMBER AVAILABLE E EMAIL AVAILABLEObjective Obtain a challenging leadership position applying creative problem solving and lean management skills with a growing company to achieve optimum utilization of its resources.Skills TX Electrical License #110630 (20+ years in electrical trade) NCCER Certified Industrial Electrician #2687366HASC Basic PlusTWIC Registered Exp. 07/222019 NFPA-70E Electrical arc Flash Hazard F-6.13M High Voltage Stress Cone Certified 2013Experience7/19-2/20 Tradesman International / ISC. Inc. @ W.R. Grace Worley Construction Sulphur, LA Supervisory Foremen Responsible for 10 + man crew Punch list and commissioning support Blueprint reading Daily planning Daily production and construction reports Material inventory / Order Requisitions Safety meetings / tool box talks Quality Control (QC) support Working foreman in field Coordinated with main electrical contractor Last contracted foreman on project3/19-6/19 Power Control Systems Engineering, Coleto Creek Power Plant Fannin, TX Industrial Electrician / Maintenance Support during coal plant shutdown High voltage testing / megging of 4160 SWGR and pm of said equipment Extensive Troubleshooting of PLCs in MCC throughout plant Conduit / cable installation and terminations Racking in and out 4160 SWGRPage 29/18-2/19 ProEnergy Crafts Sedalia, MO Turbine Generator Power Plant Project - Victoria, TX Fabrication and installation of rigid conduit up to 6 diameter, including brackets and supports Installed various instruments and wire / cables and performed terminations on stated electrical components Terminated 480 V motors, disconnects and incoming wires / cables into MCC buckets and power panels Promoted to Foreman after 30 days of employment Responsible for 10+man crew for installing wires / cables into cable tray rack Maintained daily logs / data entry of work progression Planned work scope and managed schedules of operation JLG mandlift operation4/18- 8/18 Prism Electric, Austin, TX DeTar Hospital ICU Expansion, Victoria TX Responsible for high voltage installation and termination of 350-500 KCMIL cables for backup generator and switchgear Performed megging tests and applied torque specifications on terminal lugs and buss bar maintained daily log sheets of stated testing Installed EMT conduit up to 4 diameter and also wire and cables Installed lighting, plugs, switches and performed scissor lift operator Installation of high voltage buss duct to connect switchgear 7/17--3/18 Merit Electric CO. Baton Rouge,LA TPCO America Project, Gregory, TX. Assigned to terminating crew - responsible for blueprint reading and locating termination points for up to 15KV power cables into MCC switchgear. DCS and PLC terminations Use of torque wrenches High / Low Voltage megging and continuity testing Extensive (daily) logging and data entry Assembly of Switch Gears and related components to specifications, including buss bars, lugs, hardware, insulators, supports, etc. Fabrication and installation of rigid and flexible conduit up to 6 High voltage stress cone application on 35KV XFMR feeders Page 34/17 5/17 MMR Constructors, Inc. Ingleside, TX Multiple unit shutdown/INVISTA Victoria, TX Demolition of electrical and instrumentation components in chemical process areas including switches, fuses, terminal blocks/contactors, conduit, wire, tubing and transmitters Re-installation and termination of said electrical and instrumentation components 10/16 4/17 BECHTEL SERVICES PORTLAND, TEXAS Cheniere LNG Project - Corpus Christi New construction, fabrication & installation of conduit, cable trays, supports, field panels, lighting, bus ducts and wiring/cables Terminations of PLC and Marshalling cabinets, field lighting and power panels High voltage hook-ups/connections of 150-750 KCMIL cables in switchgear including applying lugs and megging of said cables Installation of underground grid and cathodic protection, cad welding7/16 10/16 ISC CONSTRUCTORS LLC League City, TX Unit shutdown/DOW Seadrift, TX Demolition/reinstallation of conduit, wire, instruments, switches, and field panels Terminations of said components10/15 4/16 Bayou Electrical Services Houston, TX Enterprise Tank Farm/Beaumont, TX Installation of conduit, wire and cables in field Transport & Install from MCC oilfield skid/pump station Termination - PLC & OMNI panels including PIT, TIT & MOV components Installation of cable tray & supports Grounding11/14 9/15 ETEC INDUSTRIAL SERVICES CORPUS CHRISTI, TX Panda Sherman Power Plant/Sherman, TX Foreman/Lead (8) man crew Supervised & managed daily work scope Commissioning of heat tracing system on process pipes Page 4 Used test equipment - voltage reading, megging, amp reading Maintained time sheets, daily reports & safety meetings 04/14 11/14 WOLFENSON ELECTRIC HOUSTON, TX Kinder Morgan Liquid Terminal New construction, fabrication & installation of rigid conduit up to (4), cable trays, wire/cable pulling Installation and terminations of EJB, IJB, Switches, Start/Stop, MOVs MCC high voltage hook-up & stress coning03/13 04/14 TRIAD ELECTRIC & CONTROLSCORPUS CHRISTI, TX Flint Hills Resources West PlantForeman/Supervisor/Management (15+) man crew Energy control verifications, job planning & scheduling Maintained work production, daily reports & safety meetings 05/12 02/13 AZOTA GAS PROCESSING EDNA, TX Industrial Journeyman Electrician Eagle 1-Gas Project New Construction Installation of conduit, cable trays, start/stop switches, lighting, field panel terminations - MCC, field panels, vibration switches Man-Lift OperatorINVISTA unit shut down Victoria, TX02/11 04/12 WOLFENSON ELECTRIC HOUSTON, TX Industrial journeyman electrician shutdown project Installed conduit, cable tray, field panels & instrument Terminations Wiring MCC/DCS Man-Lift OperatorPage 511/09 01/11 WINDSOR CONSTRUCTION AUSTIN, TX Remodeling and add-on construction of commercial buildings including hospitals, nursing homes, strip malls, schools Installation of EMT conduit, lighting, switches, plugs, power and lighting panels Pulling wire and terminating04/08 10/09 ISC CONSTRUCTORS LLC LEAGUE CITY, TX New construction Project/Marathon Refinery, LA Industrial journeyman electrician Installed conduit, wiring, field panels, switches, lighting Terminations JLG-Lift Operator, MCC Wireman Fabrication & installation cable craysEducation 1990 CALHOUN HIGH SCHOOL/DIPLOMA1991 1992 VICTORIA COLLEGE/COMPUTER AIDED DRAFTING 1999 2000 ITT TECHNICAL INSTITUTE/CHEMISTRY TECHNOLOGY References Ram MunozPHONE NUMBER AVAILABLEI & E Commissioning SpecialistTim RoblesPHONE NUMBER AVAILABLEGeneral Foreman- TRIAD Electric & ControlsMarty AndersonPHONE NUMBER AVAILABLESuperintendent ETEC Industrial Services |