| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidate9698 Patriot Blvd AptStreet Address
LadsonStreet Address
PHONE NUMBER AVAILABLECandidate's Name
ManufacturingEMAIL AVAILABLEI am dedicated and determined to my work. I am trustworthy and very respectful.Experience01/2018 - 08/2018CNC Machine OperatorMAU@BoschOperate various machines to make Crin 1 and Crin 2 Plates and Guides. The Wendt, Plate and Guide machines each grind the parts at different dimensions. Once the parts are measured to the appropriate dimension, they are sent to the Midi to be washed. Then they are placed in the Kadia(honing). Then the shot last, and visual inspection.09/19/2018 - 02/2019Production associateMahle BehrAssemble radiators at different stations, using various parts, screw and boots. Place stickers on each radiators. Install shrouds according to which radiator, bolt down with screws using hand gun. Attach water bottle and surge tanks, bolt down with screws using hand gun. Test each surge tank. Install according line or refrigerate, depending to each radiator, bolt down and place sealant.Attach panels as needed, according to type of radiator, bolt down using various screws and hand guns. Test all radiators.02/28/2019AssemblerMercedes Benz VansAssemble sliding doors- install the wires, plugs, door handles, door contact, crash bars, protection edges and clips. Connect locks and drill, insert plugs and bolt down inside door handle. Clip wires and cables with foam together.Remove the front doors using manipulater. Insert firewall with plugs and clips. Install side rail with screws. Remove front bumper and paint jig. Install gas door.Assemble rear axles- assemble wires, brackets, speed sensors, shocks.Assemble battery- connect wires to the battery and sync keys. Assemble cockpit- install panels, speedometer, light switch, cup holder, door switch.Education06/2011 - 06/2011GEDOrangeburg-Calhoun Technical CollegeCompleted |