Quantcast

Project Engineer Automation Plc Programm...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Project Engineer, Automation, PLC programming, Electrical, Proce
Target Location US-MI-Commerce
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes

Lead test Automation Engineer Royal Oak, MI

Software Engineer Project Management Rochester Hills, MI

Senior Software Automation Engineer Detroit, MI

QA Automation Engineer Plymouth, MI

Structural Engineer Project Management Detroit, MI

Industrial & Project Engineer Ann Arbor, MI

Project Manager Design Engineer Rochester Hills, MI

Click here or scroll down to respond to this candidate
Candidate's Name
Street Address  Tuxedo Dr.Commerce, GA. Street Address
EMAIL AVAILABLE Cell: PHONE NUMBER AVAILABLEEngineering ProfessionalSkilled, results driven engineering professional with proven experience meeting tight timelines and budgets to drive complex projects to successful completion. Known for identifying opportunities for efficiencies and improvement and providing leadership to develop and implement solutions. Demonstrated strengths consulting and maintaining professional relations with consultants, trades and property owners. The ability to work successfully in a fast paced environment using cutting edge technology. Earned a reputation as a resourceful team player working with integrity and professionalism to earn respect, inspire cooperation and exceed project expectations.Key Skills:Strategic Planning and Project Management Technical Report Writing and PresentationsLeadership and Mentoring Compliance and RegulationsProcess and Systems Improvement Budget and Cost ManagementEquipment Design and Maintenance Creative Thinking and Problem SolvingFabrication PLC Programming AB RS linx, SLC 504,Logix 500/ 5000, Mitsubishi, UnitronicsElectrical wiring and troubleshooting Wiring harness and Control Panel BuildingHydraulic and pneumatic systems and controlsIOS 9001 PFEMAProcess Control Defect ReductionProject Management Capability and performance analysis5S Lean principles Equipment purchasing and InstallationSix sigma principles Denso and Yamaha RoboticsProfessional ExperienceIMS GearGainesville, GAProduction Control/ Automation EngineerNovember 2017 - CurrentContinuous ImprovementsElectrical systemsAutomationProcess controlsSet up training program for operators and maintenanceMake a PM list for maintenance for each machineSet up and repair of machines to ensure stable runMake spare parts list and order critical partsTI AutomotiveLavonia, GASr. Manufacturing EngineerMarch 2017  November 2017Process/ Production improvementsContinuous improvements in a fast paced tier 1 automotive environment and ensure quality and on time shipments.Improve process flow and decrease cycle times.Scrap rreduction from $2000 a day to < $1000 per day through equipment modifications and process changes.Work on changing the control plan and Critical Process Parameters to control the process and make quality stable parts.PFEMALPA auditsMachine specification setup for new machines.Modification of line to test parts to ensure 100% check to customer.Made a tank cooling line to keep production running and not shutdown the customer.Working on a camera system to check component position and weld.Modification of water bath cooling system to ensure proper alignmentContractor managementToyota IndustriesPendergrass, GASr. Production Engineer / Project Engineer March 2015  March 2017Production improvementsAbility to perform in a fast paced machining environment and maintain production flow.Significantly improve productivity without sacrificing quality by identifying process bottlenecks and working with managers and maintenance to streamline the lines and testing while still producing quality parts.Improve process to reduce the defects and waste of parts during machine adjustment and quality checking from 8 parts down to 2 which was a savings of $15,000 a month.Add a machine program modification to add a distinct mark on the part to identify the line for ease of parts traceability.Equipment and process troubleshooting and repair.Project/ Facility addition:Project Engineer in charge of all new production lines.In charge of $21 million installation project for new equipment lines.Installation of equipment, Construction layout, Contractor management, Modifications and all Tryout and Validation.SPC to validate new line capabilities and to maintain maximum production lines potential.Budget and Equipment Ordering/ Purchasing.Meetings/ Presentations to President and upper management.Process control and improvements.Defect reduction for all lines.Program control system using Mitsubishi and Allen Bradley software.Use diagnostic equipment for troubleshooting and repair of equipment.Use of air leak equipment for part quality control.Use of vision system to monitor parts for machining faults.FEMAISO9001 documentation.PPAP processesPrab / HapmanKalamazoo, MIField Service Engineer / Project Engineer Aug. 2011- March 2015Project Engineer in charge of Installation and troubleshooting of new conveying equipment at customers facilities.Installation of equipment, Construction layout, Contractor management, Modifications and all Tryout and Validation.Training of facilities personnel and in charge of training material.PLC Programming and modifications using Mitsubishi, Unitronics and Alley Bradley software.Electrical Wiring installation, Panel Building and Troubleshooting.Ability to use diagnostic equipment for troubleshooting and repair of equipment.Use of load cells to perform mixture controls by weight loss and gain.Use of sensors to measure load and force placed on conveyors and systems.Use of vibration testers and sensors to monitor out of balance on equipment.Fabrication of equipment.Eaton Corporation (Aerotek)Galesburg, MiEngineering Technician Oct. 2007 - March 2011Technical support for technicians and field personnel.Field service Engineer  for Hybrid department: Building and repair of prototype hybrid electric equipment.The Equipment: Hybrid electric vehicles, battery systems, controllers, inverters, transmissions, motors and wiring systems.Assisted in Software testing/debugging, hardware installation, testing and validation of complete hybrid electric systems.Setup procedures for testing of returned components and in charge of rework/re-man documentation and processes.Trained in high voltage handling and safety.Make prototype wiring harnesses, soldering wires, soldering terminals and components.Field repair of test vehicles.Assist in the writing and verifying of testing procedures/ Manuals.Set up for testing using oscilloscopes, multi-meters, mega ohm meters and diagnostic software.Fabrication using shop equipment (presses, cranes, forklifts, welders, cutting torches, benders, breaks, micrometers, calipers, torque wrenches and various hand and power tools.Ability to read and fabricate from prints.Mikes Power Wash Plus, Kalamazoo, MI August 1997  July 2012Owner / ManagerSales of power washing equipment and cleaning supplies.Power washing of equipment, vehicles, machinery and buildings.Accounts Receivable / Payable.Equipment Repair.Manager (Managed 10 employees).State regulation (DEQ) waste water certification.Licensed Hazmat and waste water hauler.City Of KalamazooKalamazoo, MiTechnician Sept. 2001 to Feb. 2002Maintenance and repair of city equipment.The Equipment: Plow trucks, dump trucks, salt spreaders, loaders, backhoes, mowers etc.Fabricating, cutting, and welding of various items and equipment.Troubleshoot and repair of heavy equipment.Spx CorporationKalamazoo, MiEngineering Technician April 1993 to July 2001Diagnostic Engineering TechnicianIn charge of data collection, input and software development for Ford, Mazda, Toyota and Chrysler diagnostic equipment.Tested software and hardware for alignment and automotive diagnostic equipment.Performed repairs on test equipment as well as vehicles.Rework hardware (repair wiring, and change out components on circuit boards).Assisted in the writing of training procedures for test equipment.Installation and testing of vehicle and engine dynameters.Crew leader in Massachusetts to set up the emissions test stations which included the installation of dynameters, hookup of diagnostic equipment, software validation and debugging and also the training of the repair facility personnel.Advantage FordGalesburg, MiMaster Automotive and Heavy duty Technician July 1984 to April 1993Advanced engine control specialistFuel system controlsElectrical systemsAir ConditioningEngine diagnosticsEngine Building and troubleshootingBraking SystemsEducationDeVry University, Chicago, IL Electronics Engineering BSEEKalamazoo Valley Community College, Kalamazoo, Michigan College prerequisitesReferences available upon request

Respond to this candidate
Your Message
Please type the code shown in the image:

Note: Responding to this resume will create an account on our partner site postjobfree.com
Register for Free on Jobvertise