| 20,000+ Fresh Resumes Monthly | |
|
|
| | Click here or scroll down to respond to this candidate Candidate's Name
Power Generation Engineering & Installation Specialist
SENIOR-LEVEL CONSTRUCTION MANAGEMENT PROFESSIONAL PROJECT
MANAGEMENT
Transmission Substations Nuclear Generating Stations Fossil Generating Stations
Focused, industrious leader who consistently delivers strong outcomes and maintains a superior level of customer
satisfaction. Effective in gaining the trust of individuals, achieving consensus, and maintaining long-term, mutually-
beneficial relationships. Excel in implementing efficiencies that improve organizational goals and monetize results. Forge
and direct high-performing teams / organizations. Possess a perfect safety record.
CORE COMPETENCIES | SIGNATURE STRENGTHS AT A GLANCE | ATTRIBUTES
OPERATIONS BUDGETING MANAGEMENT COST CONTROL PROJECT PLANNING OVERSIGHT STAFF TRAINING & DEVELOPMENT
CONTRACTOR / SUBCONTRACTOR SUPERVISION SYSTEM DESIGN SAFETY REGULATORY COMPLIANCE
SELECTED LEAERSHIP ASSIGNMENTS
Project Manager, complete system grid upgrade for $2B First Energy Trep Energizing the Future project.
Project Construction Manager, new substation for Xcel Energy.
Construction Manager, Clifton Substation upgrade, including PSG&E installation of new TR, cb, disc. Sw, control
relay and Scada upgrade.
Construction Manager, Sneath Lane substation upgrade.
Electrical Coordinator, CITGO Lemont Refinery ULSD 590 project. New Module control building for diesel
processing unit installation.
Dresden nuclear station RATT 22 project. This included 345kv yard incoming transmission lines, 300MVA 345kv
transformer, 345/138kvtr, multiple 345cbs, disconnects, bus work, control building installation
Exxon Mobil Oil Yard Addition. Installed 2 138kv transformers, bus reconfiguration, Scada upgrade installation.
CAREER TRACK & PERFORMANCE
BURNS & MCDONNELL STOW , OHIO
PROJECT MANAGER / OUTAGE COORDINATOR / WORK WEEK SCHEDULE MANAGER Since 2014
Purpose and Scope: Played a key leadership role as part of a $2B TREP system grid upgrade that included 12kv
to 345kv generating facilities across 4 states. Worked in close collaboration with project principals and other key
personnel in areas of budget control, scope of work planning, and approval of cost variances. Ensured that
budget goals were consistently met or exceeded.
Directly assisted in generating engineering solutions that met project requirements, and resolved
procurement issues in a timely manner.
Led and presented at scope of work meetings kick-off, and close-out meetings.
Led and presented weekly client progress meetings
As Outage Coordinator, performed study and submitted LOTO outages for substation / transmission /
distribution and testing.
Scheduling duties and results include developing and creating work sequence schedule for all of first year
projects. Created and implemented weekly T-0 through T-8 schedule, and ensured all project management and
key departments were fully cognizant of all project goals and requirements.
ELECTRIC POWER SYSTEMS (EPS) CARLSBAD , NEW MEXICO
PROJECT CONSTRUCTION SITE MANAGER 2013-2014
Purpose and Scope: Proactively managed a wide range of construction activities as part of a $500M system
upgrade to support oil fracking in two states. Directly monitored and supervised contract and subcontract
employees. Maintained and bolstered job site safety, and authorized or denied cost variances. Managed large
project budgets, and resolves issues in a prompt manner to meet schedule and quality objectives.
Page 1 of 3 Minooka, IL 60447 PHONE NUMBER AVAILABLE PHONE NUMBER AVAILABLE EMAIL AVAILABLE
Candidate's Name
Planned, oversaw, and evaluated civil and electrical work performed to maintain project expectations.
Held kick-off and closing meetings, and in case of schedule slippage, developed immediate, effective recovery
schedules.
BURNS & MCDONNELL CLIFTON , NEW JERSEY
PROJECT SUPERINTENDENT 2013
Purpose and Scope: Directed key project functions for a $5M substation upgrade. Duties included employee
evaluations, training, and quality compliance. Maintained an optimal level of safety, and resolved scheduling
conflicts and issues. Maintained a safe workplace environment that enhanced employee morale and lowered
costs dramatically.
Directly assisted civil and electrical engineers in formulating cost-effective solutions to complex
challenges.
MAVERICK TECHNOLOGY / GE SAN BRUNO CALF.
PROJECT CONSTRUCTION SITE MANAGER 2010-2012
Purpose and Scope: Delivered consistently enviable results as part of a $7M project that included substation and
control building upgrades and 230kw transmission lines reconfiguration. Led routine safety meetings, developed
task schedules and LOTO scheduling for power outage work and transmission line cutovers. Enforced rigid
safety and environmental compliance guidelines that guaranteed workers safety and met compliance mandates.
Trained and guided contactor and subcontractor personnel. Coordinated and verified testing work, and inspected
jobs on a daily basis to ensure objectives were met.
Authored scopes of work documents and test report forms, and assisted engineering staff as needed.
Efforts met and exceeded management expectations.
FASTRACK CONSTRUCTION MANAGEMENT, LLC LEMONT IL.
LEAD ELECTRIC PROJECT COORDINATOR / ELECTRICAL / INSTRUMENTATION PROJECT COORDINATOR 2009-2010
Purpose and Scope: In support of a ULSD refinery electrical unit project, supervised and guided contractor
personnel in electrical construction planning and execution. Planned projects, coordinated specialty contractor
assignments, and inspected work to ensure quality objectives and safety guidelines were met.
Approved or denied cost variances, and assisted senior engineers in troubleshooting and resolving project
deliverables.
EXELON / COMED
FIELD SUPERVISOR, SUBSTATIONS 2004-2008
REGIONAL LEAD WORK PLANNER 2003-2004
CREW LEADER CONSTRUCTION / WORKING FOREMAN 1997-2002
A-ELECTRICAL MECHANIC / JOURNEYMAN Prior to 1997
Purpose and Scope: Enjoyed a long and fruitful tenure with this major company. Promoted to positions of greater
scope and responsibility due to a strong track record of achievement, including a 100% safety record.
Managed the daily operation of the Substation Construction Headquarters, including personnel
administration, budgeting management, employee scheduling and oversight, safety program development and
execution and ensured clear communication with all employees. Reviewed current projects and corrected
project schedules.
As Regional Lead Work Planner, was fully responsible for all capital projects in assigned region.
Major accomplishments as Lead Work Planner included assisting in implementing a new Work
Management Department. Developed policies and procedures, trained staff, and created outage requests in
support of ongoing projects.
2
Candidate's Name
Provided hands-on leadership by example as Crew Leader and Working Foreman. Supervised crews in
executing planned jobs. Trained personnel in basic through advanced civil and electrical engineering concepts
and methods, and maintained optimal crew safety in field conditions.
Maintained a superlative track record of success as A-Electrical Mechanic / Journeyman. Installed all
electrical and structural systems that included high voltage transformers, breaks, bus work and relay panels,
duct bank installations, cable runs, terminations and structural tower installations to work class levels.
EDUCATION & TRAINING
Undergraduate Coursework, Joliet Junior College
Excelon / ComEd Extensive formal classroom and on the job training
Additional courses, seminars and workshops include:
Structural, Civil, Electrical Blueprint Reading
CERTIFICATES & LICENSES
Project Management Professional (PMP) In progress
OSHA Certified NERC & FERC Qualified
COMPUTER COMPETENCIES
Project Model Review Office Suite Passport Project Primavera
REFERENCES AND FURTHER DATA PROVIDED UPON ESTABLISHMENT OF MUTUAL INTEREST
Page 3 of 3 Minooka, IL 60447 PHONE NUMBER AVAILABLE PHONE NUMBER AVAILABLE EMAIL AVAILABLE
|