Quantcast

Instrumentation Engineer Resume Joliet, ...
Resumes | Register

Candidate Information
Name Available: Register for Free
Title Instrumentation Engineer
Target Location US-IL-Joliet
Email Available with paid plan
Phone Available with paid plan
20,000+ Fresh Resumes Monthly
    View Phone Numbers
    Receive Resume E-mail Alerts
    Post Jobs Free
    Link your Free Jobs Page
    ... and much more

Register on Jobvertise Free

Search 2 million Resumes
Keywords:
City or Zip:
Related Resumes

Electrical Engineering Manager Chicago, IL

Software Engineer Cedar Rapids Hoffman Estates, IL

Engineer Chemical Engineering Chicago, IL

Project Manager Engineer Itasca, IL

Electrical Engineer Energy Center Willowbrook, IL

Software Engineer Web Development Chicago, IL

Software Engineer Senior Chicago, IL

Click here or scroll down to respond to this candidate
                              Candidate's Name
                            Street Address  Rosewood Street
                         Shorewood, Illinois, Street Address
                       Email: EMAIL AVAILABLE
                                PHONE NUMBER AVAILABLE
                                PHONE NUMBER AVAILABLE

Experience

Project Engineer, Diamond Technical Services, Coal City, IL.  August 2014-
Current Date

    . As an employee for Diamond Technical Services I served as a site
      engineer at AKZO-NOBEL in Morris Iliinois in the capacity of  Project
      Engineer. I was primarily utilized as a mentoring agent. This worked
      well as experience was accelerated through my communication on
      technical matters as well as relevant personal experiences.


Senior Engineer,  Ambitech Engineering, Downers  Grove, IL,  March 2013-
August 2013

    . While working with Ambitech Engineering I was involved in multiple
      high priority projects and had the opportunity to be utilized as a on
      site Senior Engineer at Lyondellbasell in Morris IL. Lyondellbasell
      manufactures low density polyethylene pellets.  As a contract Senior
      Engineer with Ambitech Engineering I consulted on the Line 3
      compressor and extruder project specifying equipment and  making
      installation recommendations. Specifying  Crouse-Hinds 200 amp power
      panel for Line 3 and 4 compressors as well as sizing the feeder and
      transformer and installation diagrams. I also worked on the new
      primary compressor Trabon lubrication system including power supply
      routing, sized heat trace equipment for lube oil lines. Reviewing and
      modifying  PFD's and  P&IDs. Finding alternate uses for process
      equipment.  Making recommendations for the upgrading of equipment.
      Integration of new equipment into existing Instrumentation and Control
      scheme. Redline drawings for drafting correction. Create
      instumentations data sheets for vendor quotation. Review installation
      drawings and modify as needed. Review vendor information to confirm
      equipment purchase.

Project Specialist, EN Engineering, Woodridge, IL,  August 2009-March 2013

    . While working at EN Engineering I was involved in multiple projects
      and had the opportunity to join teams with many of their brother
      companies, including, but not limited to: Central New York Oil and
      Gas, Enterprise Pipeline, and Buckeye Pipeline.

    . I was given the task to construct the Bristol Controlwave program for
      the Central New York Oil and Gas storage field well head metering
      building and well heads.  I have performed the installation,
      configuration and testing of Daniel junior ultrasonic flow meters,
      Fisher and Becker control valves programming, as well as Bettis
      actuator utilization. There was also operations  training and
      supervisors on the start up and maintenance of all the above mentioned
      equipment. The modbus protocol  is utilized heavily in Central Now
      York Oil and Gas Pipeline System.  Commissioned (9) Daniel Junior
      Sonic Ultrasonic meter, dehydration system,  pipeline gas heater skid.

    .  I teamed up with Enterprise Pipeline as  lead  instrumentation
      engineer to upgrade all the satellite software in their system remotes
      in five states, covering approximately ninety stations inside of a
      month.  I came in under budget by twenty five percent and completed
      all work ahead of schedule.

    . With Buckeye Pipeline I created and completed the station design and
      instrumentation engineering for the BP Gate station that joined
      Buckeye Pipeline and BP.  I managed all specifications and design for
      twenty four density meters and trained Buckeyes' technicians on the
      installation and maintenance of said meters.  By combining my strong
      trouble-shooting abilities and communication skills I was able to get
      this time sensitive project, completed on time and within budget.


    . As the  instrumentation engineer for the Central Valley Gas Storage
      project I did all the instrumentation data sheets and specifications
      for the well head gathering system. I specified all of  the
      installation and connection diagrams for the instruments. All of  the
      metering and Gas analysis instrumentation is communicated using
      modbus protocol exclusively.

Supplemental Natural Gas Plant, Research & Development, Scada Specialist,
Nicor Gas, Naperville, IL, October 1978-August 2009


    . My main role at the Supplemental Natural Gas Plant was monitoring the
      day to day operation of the plant instrumentation operations, this
      includes but are not limited to: acquiring and analyzing vibration
      data from reciprocating compressors, motors, and gas turbines
      equipment. The data was acquired by either hand held analyzer or
      continuous duty vibration equipment.   Operating uitlity plant which
      encompassed making process water. This was a 3 Train anion / cation
      bed and mixed bed American Water Softener System.  This included
      regeneration and analysis of the different phases of the process water
      making and regeneration process. The final result was very hard water
      converted to 1 micromho conductive water that was so clean we had to
      add chemical to keep it from drawing minerals out of the steel piping
      and boiler tubes.  Developing instrumentation data sheets , scaling
      transmitters calculating orifice plate specifications, reviewing plant
      modification specifications, reviewing P&IDs, electrical drawings,
      ladder diagrams., calibration gas quality analyzers (i.e.
      chromatographs, MSA CO2 analyzers, BTU analyzers).


    . One of my main roles as a Scada Specialist was the supervising of the
      field group and also maintaining and monitoring the day to day scada
      (Intellution iFix HMI) operation,  programming, analyzing and
      overseeing installation and maintaining of the data acquisition
      equipment, including, installing and tuning of, flow, pressure, and
      odorizer control loops (PID). Considered by the department heads to be
      the SME (Subject Matter Expert) of the department as far as the scada
      group and measurement in general. (i.e. turbine meters, ultrasonic
      meters, diamond probar (differntial tube), and orifice plate). I was
      responsible for sizing, overseeing installation, and ranging of the
      measurement instruments as well as providing operating ranges and
      setpoints . The communications method used is Licensed VHF radio
      frequency utilizing modbus protocol from each remote station and from
      the node to the master controller. Knowledge of storage field concepts
      and strategies. I was also utilized as trainer/mentor as the
      departments I was connected with had people with 5 years in the
      company.

    . During my time working as a Scada Specialist I also did specifying and
      designing for six major station additions to Nicor's scada system.
      This included programming the ROC 809 as well as Bristol Controlwave
      to communicate with the scada system as well as specifying Rosemount
      transmitters for station information. I also generated control loops
      drawings, installation sketches, and both electrical and
      instrumentation wiring installation diagrams.

    . My ROC 809 program design was not limited to only data management, but
      was also used for pressure, flow and odorization control. In some
      cases station temperature control was critical and would also be
      handled by the ROC 809. The temperature control would be mostly
      related to pipeline gas heaters which were responsible for preheating
      the gas prior to pressure dropping the pipeline pressure (600 to
      730psig) to (230 to 350psig ) for distribution system main pressure.



    . Many personal  man hours above and beyond the normal were put into
      making sure that the system was all it could be. This increased system
      operation and reduced down time, saving the company an untold number
      of man hours in overtime.

    . During my thirty years of dedication to Nicor I also spent six years
      in the research and development division maintaining the support
      system for instrumentation and special projects. During my time in the
      Research and Development I specified and requested quotes on
      instrumentation for the pressure departments throughout the company. I
      was also involved in the "AMR" system testing. AMR stands for
      automated meter reading.




    . While in research and development I also developed two patents. The
      first being a pressure vault monitoring system and the other patent is
      for a pressure monitoring device with high and low alarms for use when
      overhauling a pressure vault.

Education and Extra Trainings

    . Bachelors degree in electronics, DeVry Institute of technology,
      graduating class of 1977.

    . Training classes in ISA datasheet specification writing, Modbus
      Protocol, Bristol Controlwave      programming, Emerson ROC809
      programming all taken in 1998.

    . I have a first class Federal Communications Commission License
      received in 1977.

    . I have certificates of completion from the Texas A&M fire school
      (water and light water) as well as Ansul
              dry chemical school received in 1985.

    . I also have a certificate of completion for Fisher valve school
      received in 1982.

    . I have introductory classes in Allen Bradley PLCs .




Respond to this candidate
Your Email «
Your Message
Please type the code shown in the image:
Register for Free on Jobvertise